The City of Cleveland seeks a qualified Construction Manager at Risk team to provide construction services for the Central Recreation Center Expansion, managed by the Mayor’s Office of Capital Projects.
Introduction
The City of Cleveland ("City" “Client” “Owner”) is seeking qualified Construction Manager at Risk Team Partners ("Contractor" “Construction Manager at Risk” “CM-R” “CM-R Team” “General Contractor”) to provide Construction services for the Central Recreation Center Expansion. The Project is considered a Construction Manager at Risk, and will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD). MOCAP oversees the administration of the City’s Capital Improvement Plan (CIP) for all City-owned facilities, outdoor spaces, and infrastructure, working through its three divisions: the Division of Architecture & Site Development, the Division of Engineering & Construction, and the Division of Real Estate. The mission statement for MOCAP is:
To provide for the planning, designing, construction, and preservation of the City of Cleveland's facilities and infrastructure through collaborative and comprehensive planning, leadership in management, excellence in sustainable design and technical expertise, and quality construction based on integrity and professionalism.
Description of Need
Scope A and B: A fire occurred in the gym during the last construction project (Phase 3) at Central NRRC, halting construction. This has necessitated Scope A smoke, fire and water damage remediation of the gym and pool area, including but not limited to, demolishing and replacing the last project's damaged new construction and Scope B, completion of the last construction project's incomplete scope of work under this CM-R.
Scope C: Central NRRC includes new work including, but not limited to, construction of handicap accessibility into and around the center, as well as a continuation of the interior improvements start in the previous phase.
Possible Separate Bid Packages
Based on any opportunity agreed upon with the Director of the Mayor’s Office of Capital Projects, the Construction Manager at Risk shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City.
City’s Consultants
The City of Cleveland has retained an Architect and Engineer of Record Consultant(s) (“Consultant” “City’s Consultant” “Architect” “Engineer” “A-E” “AOR” “EOR” “Designer”) through the end of construction, of which will remain contractually under the City of Cleveland or its’ Designee. The Consultants shall complete the Construction Documents as needed per the RFP, advise and consult with the City, and perform customary AOR and EOR Construction Administration activities.
Existing Documentation Brief
MOCAP and the Owner’s Representative Team have compiled design criteria documents which capture the owner’s intended function for the building systems affected by this work. This information will serve as a basis for the overall project intent.
See the attached Construction Documents consisting of construction drawings and specifications dated 6/27/2025, for complete scope of work and services.
| Event | Date | Location |
|---|---|---|
| Site Visit | 2026-03-27T15:30:00.000Z | Central Recreation Center, 2526 Central Avenue, Cleveland, Ohio 44115 |
Please use the See What Changed link to view all the changes made by this addendum.
ADDENDUM #1
In response to proposers questions the following attachments have been added to the RFP Attachments Section and also attached to this Addendum.
Question 1. 'Is there a current Environmental/Abatement survey for the facility'
Question 3. 'Has there been a geotech/boring report conducted for the addition portion?'
ADDENDUM #2
Central Recreation Center will be opened for site visits the following times:
Quality of Proposal includes Organization of the Firm, Specific Approach to this Project, Ability to Perform the Scope of Services, Capacity to Perform Work, including consideration for current City project workload, and Special Commendations as defined in the “Proposal Submission Requirements” section of this RFP.
Credentials of Key Personnel includes Qualifications of the Project Team and Project Team as defined in the “Proposal Submission Requirements” section of this RFP, particularly the project manager who will be the lead person on this project, and their prior experience and demonstrated ability to perform the scope of work.
Demonstrated history of successful relevant projects to meet proposed schedules and budgets.
This item will be reviewed after the evaluations of qualifications have been completed.
Proposed Schedule to complete the work.
In Accordance with the City’s goal of increasing the level of CSB participation in City contracts, the Consultant shall strive to meet the City’s goals. See Exhibits. Note that firms which are CSB/MBE or CSB/FBE are eligible for CSB participation and are encouraged.
IMPORTANT NOTE: Submissions evaluated as “non-responsive” and/or “not making a good faith effort” will be eliminated from further consideration.
See “OEO Compliance” for additional information.
Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME Services Proposal YYYY.MM.DD"
Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME Fee Proposal YYYY.MM.DD"
Please download the below documents, complete, and upload. COMBINE ALL FOUR SCHEDULES INTO A SINGLE PDF. Provide a PDF with the filename in the following format: "FIRM NAME PROJECT NAME OEO Schedules"
Please download the below documents, complete, and upload. Provide a PDF with the filename in the following format: "FIRM NAME Non Comp YYYY"
Please download the below documents, complete, and upload. Provide a PDF with the filename in the following format: "FIRM Affidavit"
Provide a PDF with the filename in the following format: "FIRM W9"
INSTRUCTIONS: Pursuant to Codified Ordinance Sec. 181.36, the information requested on this page must be supplied by all contractors and any subcontractors having more than a fifty percent (50%) interest in the proposed contract prior to any contract being awarded by the City of Cleveland. Any contractor or subcontractor who is deemed to have made a false statement shall be declared to have acted in default of its contract and shall be subject to the remedies for default contained in its contract. For failure to cure such a default, the contractor or subcontractor shall be automatically excluded from bidding for the supply of any goods or services for use by the City for a period of two (2) years.
If applicable. State "yes" even if there were no RFIs or questions.
If applicable. State "yes" even if there were no Addendums.
Please download the project specific PLA Document below, complete, and upload.
Provide an Executed and signed Exhibit.
Typical is single stage - this is not related to the number of stages nor phases in the Project itself.
The default is OEO language, however, the Airport may have a different requirement.
Q (Abatement Report): Is there a current Environmental/Abatement survey for the facility?
A: The following attachments have been added to the RFP Attachments section and also attached to Addendum #1. DD Exhibit J - 01 2023-04-18 Central Pool ACM & Lead Paint Sampling & Testing EE Exhibit J - 02 2019-01-30 Central Rec Asbestos & Lead Paint Survey & Risk Assess Report FF Exhibit J - 03 2018-05-10 CENTRAL REC EA GROUP REPORT - REVISED
Q (Site Visit): Is the City planning to open up the facility and make it available for any sub-contractors currently pricing the work.
A: Central Recreation Center will be opened for site visits the following times: Today Wednesday 4/8/2026, 1:30 pm to 2:30 pm Thursday 4/9/2026, 9 am to 10 am Friday 4/10/2026, 9 am to 10 am
Q (GeoTech): Has there been a geotech/boring report conducted for the addition portion?
A: The following attachment has been added to RFP Attachments Section and also attached to Addendum #1: GG Exhibit K - 2023.06.05 Central Recreation Center Triumph Geotechnical Report