SLED Opportunity · TEXAS · FRIENDSWOOD ISD
AI Summary
RFQ for Construction Manager at Risk for foundation repairs at Friendswood High School and FISD Administration Building in Texas. Project includes foam injection and underpinning with phased construction during school operations. Estimated budget $3M. Pre-construction starts Feb 2026; construction June-August 2026.
REQUEST FOR QUALIFICATIONS (RFQ): RFQ #26-008 CONSTRUCTION MANAGER AT RISK (TWO STEP PROCESS): FOUNDATION REPAIRS AT FRIENDSWOOD HIGH SCHOOL & FISD ADMINISTRATION BUILDING GENERAL SCOPE The general scope and budget are as follows: Construction Manager at Risk (Two Step Process): Foundation Repairs Friendswood High School and FISD Administration Building Friendswood High School Foundation Repairs: Located at 702 Greenbriar Ave, Friendswood, Texas 77546 Foundation repair for a two-story building using foam injections and underpinning, interior repairs, and site modifications, approximately 14,027 SF. Pre-construction services would begin immediately upon contract approval (anticipated February 2026), with “work” to commence June 2026, with a completion date of August 2026. Friendswood Administration Building Foundation Repairs: Located at 302 Laurel Drive, Friendswood, Texas 77546 Foundation repair for a one-story building using foam injections and underpinning, interior repairs, and site modifications, approximately 3,300 SF. Pre-construction services would begin immediately upon contract approval (anticipated February 2026), with “work” to commence June 2026, with a completion date of August 2026. Estimated Construction budget is $3 million. The construction budget includes all CM fees, including pre-construction, construction, and general conditions fees. Architect and consultant fees, furniture, fixture and equipment (unless included in contract) costs, and reimbursable and miscellaneous costs are not considered as a part of the construction budget. Architect Information: VLK Architects, Inc. 20445 State Highway 249, Suite 350 Houston, Texas 77070 281-671-2300 Monika Castillo, AIA Principal Special schedule considerations are as follows: This schedule is preliminary and will be finalized during the design phase of the project. The project is to be designed and built on a phased construction schedule to allow the continuation of daily school, district and community activities across all campuses during the duration of the project. It should be assumed that some work will be required during the school year and on occupied campuses. All GCs and Sub-Contractors will be required to adhere to District Vendor Badging procedures. It should be assumed that typical Districtwide Testing will require no work days and will be defined at a later date.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.