Active SLED Opportunity · KANSAS · LINDSBORG

    Construction of Restroom Facility

    Issued by City of Lindsborg
    cityRFPLindsborgSol. 6f916c68-4dae-4cd1-91e1-37f69a82da0c
    Open · 32d remaining
    DAYS TO CLOSE
    32
    due Jul 25, 2026
    PUBLISHED
    Jun 17, 2026
    Posting date
    JURISDICTION
    Lindsborg
    city
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    The City of Lindsborg seeks proposals for construction of a new ADA-compliant restroom facility at Riverside Park, including concrete work, storage, lighting, and site accessibility. Construction is planned for early 2027 with proposals due by July 25, 2026.

    Opportunity details

    Solicitation No.
    6f916c68-4dae-4cd1-91e1-37f69a82da0c
    Type / RFx
    RFP
    Status
    active
    Level
    city
    Published Date
    June 17, 2026
    Due Date
    July 25, 2026
    NAICS Code
    236220AI guide
    Jurisdiction
    Lindsborg
    State
    Kansas
    Agency
    City of Lindsborg

    Description

    The current restroom building at Riverside Park has been identified for replacement. This new bathroom structure would be accessible by ADA standards and would also provide additional storage space for the Parks Department.

    Requirements include but are not limited to:

    • Appropriate groundwork.

    • An approximately 480 sq ft, multiple-occupant concrete block restroom that includes: three (3) flush toilets, one (1) urinal, and two (2) sinks. (See floor plan)

    • Concrete skirt and sidewalks. (1225 sq ft) Include proper sidewalks that link with current sidewalk network and provide ADA accessibility.

    • A water fountain and bottle filling station on the outside.

    • A storage area with an 8 ft overhead door. (see floor plan)

    • Stick built roof trusses with metal roof.

    • Appropriate LED lighting.

    • The ability to easily winterize.

    • Proper ventilation.

    • Auto flush fixtures.

    • Baby changing station.

    • Soild plastic doors with plastic partitions.

    • Paint the exterior/interior of the building.

    • Epoxy coating on floor

    Construction planned to begin in first quarter 2027.

    The city requests that the submitted proposal includes a projected timeline to complete construction.

    Each responder to this Request for Proposals shall submit (1) copy of their proposal to Noah Flores, Parks Director, City of Lindsborg, P.O. Box 70, Lindsborg, Kansas 67456, on or before July 25, 2026

     

    The City of Lindsborg reserves the right to negotiate with any responder and reject any or all proposals.

    Key dates

    1. June 17, 2026Published
    2. July 25, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.