Active SLED Opportunity · CALIFORNIA · MONTEREY ONE WATER

    Construction of the Renewable Energy Improvements Project

    Issued by Monterey One Water
    localRFPMonterey One WaterSol. 143171
    Open · 37d remaining
    DAYS TO CLOSE
    37
    due Aug 20, 2026
    PUBLISHED
    Posting date
    JURISDICTION
    Monterey One
    local
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Construction services for the CP361 Renewable Energy Improvements Project at Monterey One Water Regional Treatment Plant, including digester gas piping replacement, concrete repairs, and installation of linear generators. Project funded by WIFIA and federal grants.

    Opportunity details

    Solicitation No.
    143171
    Type / RFx
    RFP
    Status
    Bidding
    Level
    local
    Published Date
    Due Date
    August 20, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    Monterey One Water
    Agency
    Monterey One Water

    Description

    Project Description: Construction of the CP361 Renewable Energy Improvements Project at the Monterey One Water Regional Treatment Plant. Work involves replacement of digester gas piping and gas safety equipment and associated supports, replacement of two access roof hatches (cover and frame) on each digester with provisions for concrete repair, recoating interior headspace of each digester, concrete repairs to the four digesters and digester building, installing new level measurement device on each digester, installing five linear generators (purchased by M1W with an expected delivery date of approximately September 2028. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Engineering Address: 14811 Del Monte Boulevard, Marina, CA 93933 County: Monterey Other Details: The Project is anticipated to be funded with Water Infrastructure Finance and Innovation Act (WIFIA) funding provided through the U.S. Environmental Protection Agency (EPA) and may also be funded with federal grant funding (“Federal Funds”). Additional federal and state funding source provisions (“Federal Funding Source Requirements”) applicable to the Project are set forth in Section 00800 of the Contract Documents. Bidder is expected to familiarize itself with the Funding Source Requirements. Notes: The Engineer's estimated range of the cost of construction is between $42,000,000 and$45,000,000.

    Key dates

    1. August 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.