Active SLED Opportunity · TEXAS · TEXAS
AI Summary
RFQ for roof renewal and building envelope renovation at Building C1, Central Campus Interactive Learning Center, Texas.
Building C1, the Central Campus Interactive Learning Center, wascompleted in 2004. In preparation for the twentieth-year roof renewal, acomprehensive inspection revealed significant on-going issues with thebuilding’s metal panel system. The College’s ultimate conclusion was that thelong-term health of the building would be enhanced by converting the existingsingle barrier ACM system to a rain-screen design.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.