Active SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT

    Demolition of Condemned Dwellings (Group 8)

    Issued by Horry County Government
    countyIFBHorry County GovernmentSol. 9462129715
    Open · 30d remaining
    DAYS TO CLOSE
    30
    due Sep 4, 2026
    PUBLISHED
    Aug 3, 2026
    Posting date
    JURISDICTION
    Horry County
    county
    NAICS CODE
    238910
    AI-classified industry

    AI Summary

    Horry County Government seeks bids for demolition of condemned dwellings including utility demobilization, asbestos removal, debris disposal, site grading, and environmental compliance. Mandatory onsite visit on August 19, 2026. Bids due September 4, 2026.

    Opportunity details

    Solicitation No.
    9462129715
    Type / RFx
    IFB
    Status
    Active
    Level
    county
    Published Date
    August 3, 2026
    Due Date
    September 4, 2026
    NAICS Code
    238910AI guide
    Agency
    Horry County Government

    Description

    Horry County Government is soliciting sealed bids for IFB #2025-26-074, Demolition of Condemned Dwellings (Group 8) for Horry County. Bids are due September 4, 2026, no later than 2:00 PM, Local Time. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.MU.USA.715279.C21576851 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/19/2026 02:00 PM EDT **Questions are submitted online**: Yes **Onsite Visit**: 08/19/2026 10:00 AM EDT **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Horry County **Reference Number**: 0000432516 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Bid Forms | Required Bid Forms | Yes | No | **Pre-Bidding Events**: Event: Onsite Visit | Date: 08/19/2026 10:00 AM EDT | Location: 1383 Vereen Rd. Aynor SC 29511 | Mandatory: True **Line Items**: | description | quantity | uom | |---|---|---| | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing mobile home/stick built structure, including slab, foundation, porches and decks - Approx.. 1,904 SF Remove all trash & construction debris to an approved Land Fill. Burning is not allowed. Demolition & Disposal shall be done Per DHEC,OSHA and Pollution Control Regulations. | 1.0 | Unit | | Labor to demolish the existing mobile home/stick built structure, including slab, foundation, porches and decks-Approx.. 1,904 SF Remove all trash & construction debris to an approved Land Fill. Burning is not allowed. Demolition & Disposal shall be done Per DHEC,OSHA and Pollution Control Regulations. | 1.0 | Unit | | Materials to demolish and dispose of outbuildings to include slabs (foundation). Dispose of in an approved landfill. | 2.0 | Unit | | Labor to demolish and dispose of outbuildings to include slabs (foundation). Dispose of in an approved landfill. | 2.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Materials to provide for Permits (DHEC & Local) Manifest records to be made available upon request | 1.0 | Unit | | Credit For Salvaged Items - to be determined | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing stick built home structure with attached mobile home, including all cmu piers, footers and exterior decks- Approx.. 4,304 SF Remove all trash & construction debris to an approved landfill. Burning is not allowed. Demolition & disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Labor to demolish the existing stick built home structure with attached mobile home, including all cmu piers, footers and exterior decks-Approx. 4,304 SF Remove all trash & construction debris to an approved landfill. Burning is not allowed. Demolition & disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Materials to demolish the existing single-wide mobile home structure directly behind the main structure to include all piers, tie downs and decks. Dispose of in an approved landfill. | 1.0 | Unit | | Labor to demolish the existing single-wide mobile home structure directly behind the main structure to include all piers, tie downs and decks. Dispose of in an approved landfill. | 1.0 | Unit | | Materials to remove and dispose of all trash and debris from lot. Dispose of in an approved landfill. | 1.0 | Unit | | Labor to remove and dispose of all trash and debris from lot. Dispose of in an approved landfill. | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area | 1.0 | Unit | | Permits (DHEC&Local) Manifest records to be made available upon request | 1.0 | Unit | | Credit for Salvaged Items to be determined | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks&plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells septic tanks&plumbing Per DHEC regulations | 1.0 | Unit | | Materials to demolish and dispose of the existing mobile home/stick-built structure, including piers and footers-Approx.. 4,418 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Labor to demolish and dispose of the existing mobile home/stick-built structure, including piers and footers-Approx. 4,418 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area | 1.0 | Unit | | Permits (DHEC&Local) Manifest records to be made available upon request | 1.0 | Unit | | Credit for Salvaged Items to be determined | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks&plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks&plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing stick-built home with attached carport, including piers, foundation, footers, slab and exterior porches-Approx.. 1,440 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Labor to demolish the existing stick-built home with attached carport, including piers, foundation, footers, slab and exterior porches-Approx. 1,440 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations. | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area | 1.0 | Unit | | Permits (DHEC&Local) Manifest records to be made available upon request | 1.0 | Unit | | Credit for Salvaged Items to be determined | 1.0 | Unit | | Materials to remove & dispose of the roof coating material that contains asbestos-Approx.. 780 SF Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details. | 1.0 | Unit | | Labor to remove & dispose of the roof coating material that contains asbestos-Approx.. 780 SF Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details. | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks&plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments-Approx.. 780 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Labor to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments-Approx.. 780 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities, and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities, and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Permits (DHEC & Local) Manifest Records to be made available upon request | 1.0 | Unit | | Credit for salvaged items. To be determined. | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, & exterior decks/porches-Approx. 984 SF. Remove all trash and construction debris to an approved Land Fill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Labor to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, & exterior decks/porches-Approx.. 984 SF Remove all trash and construction debris to an approved Land Fill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Materials to demolish & dispose of the outbuilding, approximately 6' X 10' | 1.0 | Unit | | Labor to demolish & dispose of the outbuilding, approximately 6' X 10' | 1.0 | Unit | | Materials to demolish & dispose of fencing on property | 1.0 | Unit | | Labor to demolish & dispose of fencing on property | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed (no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Permits (DHEC & Local) Manifest Records to be made available upon request | 1.0 | Unit | | Credit For Salvaged Items. To be determined. | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, footers & exterior decks/porches-Approx.. 1,352 SF. Remove all trash and construction debris to an approved landfill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Labor to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, footers & exterior decks/porches-Approx.. 1,352 SF. Remove all trash and construction debris to an approved landfill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Materials to demolish & dispose of the outbuilding, approximately 8' X 10' | 1.0 | Unit | | Labor to demolish & dispose of the outbuilding, approximately 8' X 10' | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Permits (DHEC & Local) Manifest Records to be made available upon request | 1.0 | Unit | | Credit for salvaged items. To be determined. | 1.0 | Unit | | Materials to remove & dispose of the roof coating material that contains asbestos-Approx.. 684 SF . Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details. | 1.0 | Unit | | Labor to remove & dispose of the roof coating material that contains asbestos-Approx.. 684 SF . Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details. | 1.0 | Unit | | Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations. | 1.0 | Unit | | Materials to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments-Approx.. 684 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Labor to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments-Approx.. 684 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations | 1.0 | Unit | | Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed(no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area. | 1.0 | Unit | | Permits (DHEC & Local) Manifest Records to be made available upon request | 1.0 | Unit | | Credit for salvaged items. To be determined. | 1.0 | Unit |

    Key dates

    1. August 3, 2026Published
    2. September 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.