SLED Opportunity · ILLINOIS · CHICAGO PUBLIC SCHOOL
AI Summary
Chicago Public School invites pre-qualified design build vendors to submit technical proposals for fire alarm system design build services at multiple school sites. This is an invite-only Phase II mini-RFP with a mandatory walkthrough and multiple submission requirements.
This is a Phase II Design Build Request for Technical Proposals ("mini-RFP"). This opportunity is invite-only and open only to the vendors in the CPS pre-qualified Design Build pool authorized under Board Report 25-1023-PR5. Important Events: Search Status Event Name Location Description Dates Mandatory ONGOING Open Date Online Portal Posting date for the Opportunity Dec 10th 2025, 5:00 PM CST N/A UPCOMING Questions Due Date Online Portal Deadline to submit Questions Jan 15th 2026, 2:00 PM CST N/A UPCOMING Close Date Online Portal Deadline for Submissions Jan 29th 2026, 2:00 PM CST N/A PASSED Pre-Bid Conference/Walkthrough See RFP Mandatory walkthrough Dec 18th 2025, 9:00 AM CST - Dec 18th 2025, 5:00 PM CST Yes Supporting Documentation: Download All Files Search File Type Description Date Created Actions FINAL FAS 2 DB RFP - 20251210.pdf Documentation Primary RFP document Dec 10th 2025, 3:46 PM CST Download MBEWBE Forms ver2025.07.pdf Documentation MBE/WBE forms 100, 101, 103A, 103B are required. Complete forms 102, 105, 106 if needed. Read more... Nov 21st 2025, 1:07 PM CST Download Requested Information: Listed below are the documents and information needed to complete your submission: Name Type # Files Requirement Cover Letter File Type: PDF (.pdf) Multiple REQUIRED Table of Contents File Type: PDF (.pdf) Multiple REQUIRED Executive Summary and Compliance Statement File Type: PDF (.pdf) Multiple REQUIRED Proposer's Execution Page (Section V) File Type: PDF (.pdf) Multiple REQUIRED Summary of Firm's Organization and Structure File Type: PDF (.pdf) Multiple REQUIRED Work History - Experience with Board Projects File Type: PDF (.pdf) Multiple REQUIRED Work History - Design-Build Projects File Type: PDF (.pdf) Multiple REQUIRED Management Approach File Type: PDF (.pdf) Multiple REQUIRED Preliminary Project Design File Type: PDF (.pdf) Multiple REQUIRED Project Schedule File Type: PDF (.pdf) Multiple REQUIRED Initial Guaranteed Maximum Price Cost Proposal (Att B) File Type: PDF (.pdf) Multiple REQUIRED MBE/WBE forms 100, 101, 103A, 103B required. Forms 102, 105, 106 if needed (Att C) File Type: PDF (.pdf) Multiple REQUIRED Bid Bond 5% File Type: PDF (.pdf) Multiple REQUIRED Licenses File Type: PDF (.pdf) Multiple REQUIRED Email of contact person for contract negotiations, administration, and arranging oral presentations Data Type: Text N/A REQUIRED Email of contact person for contract negotiations, administration, and arranging oral presentations (backup) Data Type: Text N/A REQUIRED Document Takers Search Vendors # Files Actions All-Bry Construction 2 View All-Bry Construction Company 3 View Berglund Construction 3 View Blinderman Construction Co., Inc. 2 View BOWA Construction 2 View Cordos Construction 3 View Courtesy Electric 1 View F.H. Paschen 3 View George Sollitt Construction 4 View GovBright 2 View K.R. Miller Contractors, Inc. 2 View Pacific Construction Services 2 View Path Construction Co. Inc. 3 View Toro Construction Corp 2 View Tyler Lane Construction Inc. 2 View Messages Public Notices (0) Public Notices are visible to anyone who can view the opportunity Public Q&A (2*) There is currently nothing to display here. Submission Prepare Prepare Your Submission Prepare as: re re New to Euna Procurement? Here's a quick overview of the submission process. Learn more at the Euna Procurement Help Center opens in new tab Technical Support Portal Security Terms of Service Privacy Policy Sitemap 4
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.