Active SLED Opportunity · CALIFORNIA · SAN DIEGO METROPOLITAN TRANSIT SYSTEM
AI Summary
Design-build RFP for modernization of elevators at Grossmont Transit Center by San Diego MTS. Shortlisted firms invited to bid. Estimated value $1.5M-$2.2M. Mandatory site visit required.
MTS has selected the firms below from a list of Offerors that submitted a Statement of Qualifications (SOQs) in response to the Request for Qualifications (“RFQ”) for this Project.Based on the RFQ requirements, MTS is inviting these Short-Listed firms (“Proposer”) to submit proposals in response to this Request for Proposals (“RFP”).Only these firms may submit a proposal. The firms are:A. Henderson Building SolutionsB. Schindler ElevatorC. Structura Builders of California Joint Venture Estimated Bid Value: The estimated cost range for the Work is approximately $1,500,000 to $2,200,000. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Purchasing Address: A MANDATORY Site Visit will be held on the date listed in the calendar of event at Grossmont Transit Center, 8601 Fletcher Parkway, La Mesa, CA 91942. County: San Diego License Requirements: See RFP documents Other Details: PLEASE SEE THE RFP FOR ALL DETAILS.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.