Active SLED Opportunity · CALIFORNIA · SFO CONSTRUCTION
AI Summary
SFO seeks design-build services for Terminal Electrical Upgrade Project to support all-electric operations, including tenant kitchen electrification and airside charging infrastructure improvements. Proposals due July 29, 2026.
The San Francisco International Airport (Airport) is seeking proposals from qualified firms, teams, joint ventures, or other qualified business entities for Design-Build Services for the Terminal Electrical Upgrade Project (Project).
The Project will support the Airport’s transition to all-electric operations by upgrading terminal electrical infrastructure to enable tenant kitchen electrification and upgrading airside electrical ground service equipment (eGSE) charging infrastructure.
Terminal Electrical Improvement
The Project will include evaluating and upgrading electrical infrastructure serving tenant kitchen spaces to support a transition to fully electric operations. Contractor shall propose solutions that address system capacity, distribution, and readiness while performing Work in active terminal environments and minimizing impacts on tenants and Airport operations through appropriate phasing.
Airside Charging Infrastructure
The Project will also include improvements to airside eGSE charging infrastructure, supported by software-based monitoring capabilities. Contractor shall assess existing charging assets and propose upgrades, replacements, or repairs to improve reliability and performance. Contractor shall also provide or integrate software to support monitoring, operational visibility, and basic performance reporting.
Due to a limited number of people we can escort into the area, please send an email to katarina.lam@flysfo.com AND tiffany.gonzalez-rui@flysfo.com no later than COB Friday, July 10th to request a reservation for the Site Visit.
Below you will find the pre-proposal meeting sign-in sheet, presentation, and handouts for your reference and use.
Proposals must be delivered to the contract administrator by the date and time identified in the Request for Qualifications/Request for Proposals.
See Document 01 11 13 (Scope of Work) for more information.
SFO Rules and Regulations: https://www.flysfo.com/about/airport-operations/policies-regulations/rules-and-regulations
SFO Strategic Plan 2023-2028, including the Airport's Core Values: https://www.flysfo.com/about/about-sfo/strategic-plan
SFO Delivering Exceptional Projects 2.0: https://www.flysfo.com/sites/default/files/2024-01/240112_SFO-Delivering-Exceptional-Projects_tagged.pdf
SFO Architecture & Engineering (A&E) Standards : https://www.sfoconnect.com/abr-ae-standards-tenant-improvement-guide
Did you read through and confirm that you met all of the proposal requirements including the sections.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.