SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS
AI Summary
Formal RFB for dewatering and lift station improvements at Hefner Water Treatment Plant, Oklahoma City. Mandatory pre-bid conference on April 2, 2026. Bid due April 15, 2026. Scope includes construction, demolition, testing, and erosion control.
Prequalification Requirement is Water Facilities Contractor "A" WT-0271 DWSRF 2024-P40-1020902-12 - Dewatering Lift Stations; Hefner Water Treatment Plant **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/07/2026 11:00 AM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000416199 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/02/2026 02:00 PM EDT | Location: Utilities Dept., 420 West Main Street, 5th Fl. Conference Room B-521, Oklahoma City, Oklahoma 73102 | Event Note: 103.01.03 - MANDATORY PRE-BID CONFERENCE 103.01.03.01 When specified in the Notice to Bidders, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is Mandatory, the contrator who plans to submit a bid must attend the Mandatory Pre-Bid Conference. Failure of the prospective bidder to attend a Mandatory Pre-Bid Conference will cause the bidder's submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a pre-qualification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next OCWUT WT-0271 Next 1-Base Bid Code Description UOM Qty 809 MOBILIZATION Lump-Sum 1 SPEC OZONE LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #1 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC DEMO EXISTING OZONE LIFT STATION Lump-Sum 1 SPEC SPARE SUBMERSIBLE PUMP Each 1 801 CONSTRUCTION STAKING Lump-Sum 1 801 GPS AS-BUILT SURVEY Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 633 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) Linear Foot/Feet 10 212 TRENCH EXCAVATION AND BACKFILL (0' TO 15') Linear Foot/Feet 10 616 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') Each 2 616 EXTRA DEPTH MANHOLE Vertical Feet 37 617 MANHOLE TESTING Each 2 513 HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN Lump-Sum 1 840 SOD Square Yard 50 109 EROSION AND SEDIMENT CONTROL Lump-Sum 1 SPEC DEWATERING Lump-Sum 1 SPEC BYPASS PUMPING Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty 809 MOBILIZATION Lump-Sum 1 SPEC OZONE LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #1 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC DEMO EXISTING OZONE LIFT STATION Lump-Sum 1 SPEC SPARE SUBMERSIBLE PUMP Each 1 801 CONSTRUCTION STAKING Lump-Sum 1 801 GPS AS-BUILT SURVEY Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 633 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) Linear Foot/Feet 10 212 TRENCH EXCAVATION AND BACKFILL (0' TO 15') Linear Foot/Feet 10 616 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') Each 2 616 EXTRA DEPTH MANHOLE Vertical Feet 37 617 MANHOLE TESTING Each 2 513 HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN Lump-Sum 1 840 SOD Square Yard 50 109 EROSION AND SEDIMENT CONTROL Lump-Sum 1 SPEC DEWATERING Lump-Sum 1 SPEC BYPASS PUMPING Lump-Sum 1 | 809 | MOBILIZATION | Lump-Sum | 1 | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | 617 | MANHOLE TESTING | Each | 2 | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | 840 | SOD | Square Yard | 50 | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | SPEC | DEWATERING | Lump-Sum | 1 | SPEC | BYPASS PUMPING | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty 809 MOBILIZATION Lump-Sum 1 SPEC OZONE LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #1 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC DEMO EXISTING OZONE LIFT STATION Lump-Sum 1 SPEC SPARE SUBMERSIBLE PUMP Each 1 801 CONSTRUCTION STAKING Lump-Sum 1 801 GPS AS-BUILT SURVEY Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 633 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) Linear Foot/Feet 10 212 TRENCH EXCAVATION AND BACKFILL (0' TO 15') Linear Foot/Feet 10 616 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') Each 2 616 EXTRA DEPTH MANHOLE Vertical Feet 37 617 MANHOLE TESTING Each 2 513 HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN Lump-Sum 1 840 SOD Square Yard 50 109 EROSION AND SEDIMENT CONTROL Lump-Sum 1 SPEC DEWATERING Lump-Sum 1 SPEC BYPASS PUMPING Lump-Sum 1 | 809 | MOBILIZATION | Lump-Sum | 1 | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | 617 | MANHOLE TESTING | Each | 2 | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | 840 | SOD | Square Yard | 50 | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | SPEC | DEWATERING | Lump-Sum | 1 | SPEC | BYPASS PUMPING | Lump-Sum | 1 | | | 809 | MOBILIZATION | Lump-Sum | 1 | | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | | 617 | MANHOLE TESTING | Each | 2 | | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | | 840 | SOD | Square Yard | 50 | | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | | SPEC | DEWATERING | Lump-Sum | 1 | | SPEC | BYPASS PUMPING | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next 1-Base Bid Code Description UOM Qty 809 MOBILIZATION Lump-Sum 1 SPEC OZONE LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #1 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS Lump-Sum 1 SPEC DEMO EXISTING OZONE LIFT STATION Lump-Sum 1 SPEC SPARE SUBMERSIBLE PUMP Each 1 801 CONSTRUCTION STAKING Lump-Sum 1 801 GPS AS-BUILT SURVEY Lump-Sum 1 204 CLEARING AND GRUBBING Lump-Sum 1 633 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) Linear Foot/Feet 10 212 TRENCH EXCAVATION AND BACKFILL (0' TO 15') Linear Foot/Feet 10 616 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') Each 2 616 EXTRA DEPTH MANHOLE Vertical Feet 37 617 MANHOLE TESTING Each 2 513 HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN Lump-Sum 1 840 SOD Square Yard 50 109 EROSION AND SEDIMENT CONTROL Lump-Sum 1 SPEC DEWATERING Lump-Sum 1 SPEC BYPASS PUMPING Lump-Sum 1 | 809 | MOBILIZATION | Lump-Sum | 1 | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | 617 | MANHOLE TESTING | Each | 2 | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | 840 | SOD | Square Yard | 50 | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | SPEC | DEWATERING | Lump-Sum | 1 | SPEC | BYPASS PUMPING | Lump-Sum | 1 | | | 809 | MOBILIZATION | Lump-Sum | 1 | | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | | 617 | MANHOLE TESTING | Each | 2 | | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | | 840 | SOD | Square Yard | 50 | | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | | SPEC | DEWATERING | Lump-Sum | 1 | | SPEC | BYPASS PUMPING | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 809 | MOBILIZATION | Lump-Sum | 1 | | SPEC | OZONE LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #1 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | CLEARWELL #3 AND 4 LIFT STATION IMPROVEMENTS | Lump-Sum | 1 | | SPEC | DEMO EXISTING OZONE LIFT STATION | Lump-Sum | 1 | | SPEC | SPARE SUBMERSIBLE PUMP | Each | 1 | | 801 | CONSTRUCTION STAKING | Lump-Sum | 1 | | 801 | GPS AS-BUILT SURVEY | Lump-Sum | 1 | | 204 | CLEARING AND GRUBBING | Lump-Sum | 1 | | 633 | 6" PVC AWWA C900 SANITARY SEWER FORCEMAIN (TRENCHING) | Linear Foot/Feet | 10 | | 212 | TRENCH EXCAVATION AND BACKFILL (0' TO 15') | Linear Foot/Feet | 10 | | 616 | 4' DIA. SANITARY SEWER DOGHOUSE MANHOLE (0'-6') | Each | 2 | | 616 | EXTRA DEPTH MANHOLE | Vertical Feet | 37 | | 617 | MANHOLE TESTING | Each | 2 | | 513 | HYDROSTATIC PRESSURE TESTING OF SANITARY SEWER FORCE MAIN | Lump-Sum | 1 | | 840 | SOD | Square Yard | 50 | | 109 | EROSION AND SEDIMENT CONTROL | Lump-Sum | 1 | | SPEC | DEWATERING | Lump-Sum | 1 | | SPEC | BYPASS PUMPING | Lump-Sum | 1 | **Questions and Answers**: - Q1 Arrow Right Question: BID INFORMATION What all specifically is needed to be submitted at bid time? Is this job Tax Exempt? Is this job Prevailing Wage/Davis Bacon? What are the Completion days for this project? What are the Liquidated Damages for this project? When is the start time and is there a delayed start option? Will there be any permits and who will they be paid by? Is this job American Iron & Steel? Is this job Buy American Build American? Will any subcontractors need to be prequalified? Arrow Right Answer: This will be answered via Addendum. 03/30/2026 08:49 AM EDT 03/31/2026 05:22 PM EDT - Q2 Arrow Right Question: Pump Selection Request Fairbanks Nijhuis – 5433MV be listed as an alternate pump. Pump curves and data sheets will be submitted via email for your consideration. Arrow Right Answer: This will be answered via addendum. 04/03/2026 10:59 AM EDT 04/08/2026 10:48 AM EDT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.