SLED Opportunity · UTAH · WEBER SCHOOL DISTRICT

    District Wide Asphalt and Pavement Improvements

    Issued by Weber School District
    educationRFPWeber School DistrictSol. 8586156215
    Closed
    STATUS
    Closed
    due Apr 22, 2026
    PUBLISHED
    Apr 6, 2026
    Posting date
    JURISDICTION
    Weber School
    education
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Weber School District seeks bids for asphalt slurry, sealcoat, and repairs at multiple schools under a two-year contract with options to extend. Mandatory job walk on April 13, 2026. Bids due April 22, 2026, submitted electronically via BidNet.

    Opportunity details

    Solicitation No.
    8586156215
    Type / RFx
    RFP
    Status
    Active
    Level
    education
    Published Date
    April 6, 2026
    Due Date
    April 22, 2026
    NAICS Code
    237310AI guide
    State
    Utah
    Agency
    Weber School District

    Description

    Weber School District is soliciting bids for Asphalt Slurry, Sealcoat and Repairs for multiple schools throughout the District. Attached are the schools and what jobs need to be completed this year. Depending on circumstances these schools and jobs needing done could change. This will be a two (2) year contract with the option on two (2) additional years being added. Bids are to be submitted electronically through BidNet. Emailed and mailed bids will be rejected. There is a MANDATORY JOB WALK schedule for April 13, 2026 (please plan on 6-8 hours) with possibly a half day on April 14, 2026. Meet Corey Palmer at Weber School District Facility, 2074 W 2100 S West Haven, Utah 84401 at 8:00 a.m. Contractors are repsonsible for their measurements. You will find attached specifications for Slurry Seal 2. The Board of Education, Weber School District, reserves the right to accept or reject any or all quotes or any portion thereof and to waive any abnormalities during the bidding process as the District deems to be in their best interest. Low bid is no way binding upon our district and final selection and honoring of the bids will be made by our office. BID SECURITY: Each bid shall be accompanied by a certified check, cashier's check or bid bond in the amount of five percent (5%) of the total bid price payable to WEBER SCHOOL DISTRICT as a guarantee that the bidder, if his bid is accepted, will promptly execute the Contract, secure payment of worker's compensation insurance and furnish a satisfactory, faithful performance bond in the amount of one hundred (100%) of the contract price and a payment bond in the amount of one hundred (100%) of the contract price. **Project Type**: RFP - Request for Proposal (Formal) **Source ID**: PU.AG.USA.2692212.C17774851 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/20/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Reference Number**: 0000417720 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Job-Walk Visit | Attendance: Mandatory | Event date: 04/13/2026 02:00 AM EDT | Location: Meet Corey Palmer at WSD Maintenance Facility located at, 2074 W 2100 S West Haven, Utah 84401 | Event Note: You will start at our Facilities building and travel to the schools on the schedule this year. Bids will only be accepted by those in attendance at the job walk sites. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | 1 Country View Elementary Approx. 85,700 SQ FT Slurry. Square Foot/Feet 85700 2 Kanesville Elementary Approx. 89,272 SQ FT Slurry. Square Foot/Feet 89272 3 Midland Elementary Approx. 75,500 SQ Ft Slurry. Square Foot/Feet 131004.4 4 Riverdale Elementary Approx. 68,270 SQ FT Slurry. Square Foot/Feet 68270 5 Roy Elementary Approx. 56,630 SQ FT Slurry. Foot/Feet 99130 6 Valley View Elementary 54,200 SQ FT Slurry. Square Foot/Feet 54200 7 South Ogden Jr. High Approx. 212,0200 Slurry. Square Foot/Feet 21200 8 Bonneville High School Approx. 279,679 SQ FT Slurry. Square Foot/Feet 279679 9 Roy High School Approx. 271, 417 SQ FT Slurry. Square Foot/Feet 271417 10 Weber High School, West side Approx. 113,867 SQ FT Slurry. Square Foot/Feet 113867 11 Weber Innovations Center Approx. 143,770 SQ FT Slurry. Square Foot/Feet 143770 12 Country View Elementary Walking Track. Widen northeast corner. Each 1 13 Country View Elementary Repairs. 1. New cement collars for (3) storm drains in west parking. 2. Patch sinking asphalt around storm drain in bus loop. 3. Repair low spot on edge of middle island exit. 4. Extend asphalt on east playground around basketball hoops. Each 1 14 Kanesville Elementary, Sealcoat walking track. Each 1 15 Kanesville Elementary Repairs. 1. Asphalt repair in northeast parking where it is sinking approx. 17'x20'. 2. Asphalt repair in drop off area by main entrance. 3. Possible repairs in entryway by main road (advise) Each 1 16 Midland Elementary. Playground sealcoast. (need to measure) Square Foot/Feet 1 17 Midland Elementary Repairs. 1. Repair sinking asphalt in the parent drop off on south side. 2. Asphalt around (3) storm drains in back of school. Also, repair asphalt around basketball standards and straighten basketball poles. 3. Asphalt repairs around existing manhole cover. 4. Patch around drain in southwest parking. Each 1 18 Midland Elementary Walking track sealcoat. Each 1 19 Riverdale Elementary. Playground partial (need to measure) Each 1 20 Roy Elementary. Playground Sealcoat (approx. 42,500 SQ FT.) Square Foot/Feet 42500 21 Roy Elementary. Walking track sealcoat Each 1 22 Roy Elementary Repairs. 1. Asphalt repairs around (3) storm drains in back of school. 2. Gutter and drain repairs on east side of school. Each 1 23 Valley View Elementary. Walking track sealcoat. Each 1 24 South Ogden Jr. Repairs. 1. Pothole in fire lane. Each 1 25 Bonneville High School. Repairs. 1. Repair sinking asphalt in bus drop off zone in south parking lot. 2. Replace concrete approach east of soccer field. Each 1 26 Roy High Repair. 1. Repair damaged asphalt on west side of tennis courts. Each 1 27 Weber High Repairs: 1. Possible concrete waterway on east side of tennis courts. 2. Multiple asphalt patches in the bus lanes. Each 1 28 Weber Innovations Center Repairs: 1. Paint Driving Range. Each 1 | 1 | Country View Elementary Approx. 85,700 SQ FT Slurry. | Square Foot/Feet | 85700 | 2 | Kanesville Elementary Approx. 89,272 SQ FT Slurry. | Square Foot/Feet | 89272 | 3 | Midland Elementary Approx. 75,500 SQ Ft Slurry. | Square Foot/Feet | 131004.4 | 4 | Riverdale Elementary Approx. 68,270 SQ FT Slurry. | Square Foot/Feet | 68270 | 5 | Roy Elementary Approx. 56,630 SQ FT Slurry. | Foot/Feet | 99130 | 6 | Valley View Elementary 54,200 SQ FT Slurry. | Square Foot/Feet | 54200 | 7 | South Ogden Jr. High Approx. 212,0200 Slurry. | Square Foot/Feet | 21200 | 8 | Bonneville High School Approx. 279,679 SQ FT Slurry. | Square Foot/Feet | 279679 | 9 | Roy High School Approx. 271, 417 SQ FT Slurry. | Square Foot/Feet | 271417 | 10 | Weber High School, West side Approx. 113,867 SQ FT Slurry. | Square Foot/Feet | 113867 | 11 | Weber Innovations Center Approx. 143,770 SQ FT Slurry. | Square Foot/Feet | 143770 | 12 | Country View Elementary Walking Track. Widen northeast corner. | Each | 1 | 13 | Country View Elementary Repairs. 1. New cement collars for (3) storm drains in west parking. 2. Patch sinking asphalt around storm drain in bus loop. 3. Repair low spot on edge of middle island exit. 4. Extend asphalt on east playground around basketball hoops. | Each | 1 | 14 | Kanesville Elementary, Sealcoat walking track. | Each | 1 | 15 | Kanesville Elementary Repairs. 1. Asphalt repair in northeast parking where it is sinking approx. 17'x20'. 2. Asphalt repair in drop off area by main entrance. 3. Possible repairs in entryway by main road (advise) | Each | 1 | 16 | Midland Elementary. Playground sealcoast. (need to measure) | Square Foot/Feet | 1 | 17 | Midland Elementary Repairs. 1. Repair sinking asphalt in the parent drop off on south side. 2. Asphalt around (3) storm drains in back of school. Also, repair asphalt around basketball standards and straighten basketball poles. 3. Asphalt repairs around existing manhole cover. 4. Patch around drain in southwest parking. | Each | 1 | 18 | Midland Elementary Walking track sealcoat. | Each | 1 | 19 | Riverdale Elementary. Playground partial (need to measure) | Each | 1 | 20 | Roy Elementary. Playground Sealcoat (approx. 42,500 SQ FT.) | Square Foot/Feet | 42500 | 21 | Roy Elementary. Walking track sealcoat | Each | 1 | 22 | Roy Elementary Repairs. 1. Asphalt repairs around (3) storm drains in back of school. 2. Gutter and drain repairs on east side of school. | Each | 1 | 23 | Valley View Elementary. Walking track sealcoat. | Each | 1 | 24 | South Ogden Jr. Repairs. 1. Pothole in fire lane. | Each | 1 | 25 | Bonneville High School. Repairs. 1. Repair sinking asphalt in bus drop off zone in south parking lot. 2. Replace concrete approach east of soccer field. | Each | 1 | 26 | Roy High Repair. 1. Repair damaged asphalt on west side of tennis courts. | Each | 1 | 27 | Weber High Repairs: 1. Possible concrete waterway on east side of tennis courts. 2. Multiple asphalt patches in the bus lanes. | Each | 1 | 28 | Weber Innovations Center Repairs: 1. Paint Driving Range. | Each | 1 | | | 1 | Country View Elementary Approx. 85,700 SQ FT Slurry. | Square Foot/Feet | 85700 | | 2 | Kanesville Elementary Approx. 89,272 SQ FT Slurry. | Square Foot/Feet | 89272 | | 3 | Midland Elementary Approx. 75,500 SQ Ft Slurry. | Square Foot/Feet | 131004.4 | | 4 | Riverdale Elementary Approx. 68,270 SQ FT Slurry. | Square Foot/Feet | 68270 | | 5 | Roy Elementary Approx. 56,630 SQ FT Slurry. | Foot/Feet | 99130 | | 6 | Valley View Elementary 54,200 SQ FT Slurry. | Square Foot/Feet | 54200 | | 7 | South Ogden Jr. High Approx. 212,0200 Slurry. | Square Foot/Feet | 21200 | | 8 | Bonneville High School Approx. 279,679 SQ FT Slurry. | Square Foot/Feet | 279679 | | 9 | Roy High School Approx. 271, 417 SQ FT Slurry. | Square Foot/Feet | 271417 | | 10 | Weber High School, West side Approx. 113,867 SQ FT Slurry. | Square Foot/Feet | 113867 | | 11 | Weber Innovations Center Approx. 143,770 SQ FT Slurry. | Square Foot/Feet | 143770 | | 12 | Country View Elementary Walking Track. Widen northeast corner. | Each | 1 | | 13 | Country View Elementary Repairs. 1. New cement collars for (3) storm drains in west parking. 2. Patch sinking asphalt around storm drain in bus loop. 3. Repair low spot on edge of middle island exit. 4. Extend asphalt on east playground around basketball hoops. | Each | 1 | | 14 | Kanesville Elementary, Sealcoat walking track. | Each | 1 | | 15 | Kanesville Elementary Repairs. 1. Asphalt repair in northeast parking where it is sinking approx. 17'x20'. 2. Asphalt repair in drop off area by main entrance. 3. Possible repairs in entryway by main road (advise) | Each | 1 | | 16 | Midland Elementary. Playground sealcoast. (need to measure) | Square Foot/Feet | 1 | | 17 | Midland Elementary Repairs. 1. Repair sinking asphalt in the parent drop off on south side. 2. Asphalt around (3) storm drains in back of school. Also, repair asphalt around basketball standards and straighten basketball poles. 3. Asphalt repairs around existing manhole cover. 4. Patch around drain in southwest parking. | Each | 1 | | 18 | Midland Elementary Walking track sealcoat. | Each | 1 | | 19 | Riverdale Elementary. Playground partial (need to measure) | Each | 1 | | 20 | Roy Elementary. Playground Sealcoat (approx. 42,500 SQ FT.) | Square Foot/Feet | 42500 | | 21 | Roy Elementary. Walking track sealcoat | Each | 1 | | 22 | Roy Elementary Repairs. 1. Asphalt repairs around (3) storm drains in back of school. 2. Gutter and drain repairs on east side of school. | Each | 1 | | 23 | Valley View Elementary. Walking track sealcoat. | Each | 1 | | 24 | South Ogden Jr. Repairs. 1. Pothole in fire lane. | Each | 1 | | 25 | Bonneville High School. Repairs. 1. Repair sinking asphalt in bus drop off zone in south parking lot. 2. Replace concrete approach east of soccer field. | Each | 1 | | 26 | Roy High Repair. 1. Repair damaged asphalt on west side of tennis courts. | Each | 1 | | 27 | Weber High Repairs: 1. Possible concrete waterway on east side of tennis courts. 2. Multiple asphalt patches in the bus lanes. | Each | 1 | | 28 | Weber Innovations Center Repairs: 1. Paint Driving Range. | Each | 1 |

    Key dates

    1. April 6, 2026Published
    2. April 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.