Active SLED Opportunity · CALIFORNIA · STOCKTON EAST WATER DISTRICT
AI Summary
Installation of lightning, surge protection, and grounding systems at Dr. Joe Waidhofer Water Treatment Plant in Stockton, CA, ensuring code compliance and system performance verification. Includes coordination for potential plant shutdowns and comprehensive electrical grounding work.
Furnish and install a complete lightning protection, surge protection, and grounding system for the Dr. Joe Waidhofer Water Treatment Plant, including all labor, materials, equipment, and coordination required to deliver a fully operational and code-compliant system. Work shall include installation of lightning grounding loops, conductors, bonding, and surge protection devices; construction of a perimeter ground grid with ground rods, electrodes, and plates; and grounding of all outdoor equipment, substation components, and electrical systems. Provide all necessary grounding conductors, connectors, supports, ground enhancement materials, and interconnections to ensure a continuous, low-resistance grounding network. All work shall comply with the latest National Electrical Code (NEC), California Electrical Code (CEC), project drawings, and local authority requirements, and shall include testing, inspection, and documentation to verify proper system performance. Pre-Bid Meeting Information: No Online Q&A: No Location Information: Department: Engineering Address: 6767 East Main St.Stockton, California95215 County: San Joaquin Other Details: If the project requires a shutdown of the DJW WTP, coordination will have to be made between the Contractor, Engineer, Owner and City of Stockton
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.