Statewide Minnesota construction project for installing new boilers, in-floor heating, and snow melt system at Duluth Cemetery shop. Requires experienced contractors with mechanical, electrical, and demolition expertise. Mandatory pre-bid meeting on August 18, 2026.
State Project Number 75DU0003 Duluth Cemetery: Shop in-floor heating; snow melt system; new boilers A. The work will be done under one prime contract that includes: General, Mechanical, Demolition and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Provide and install a new boiler to provide heating to the existing in-floor radiant tubing system in the shop area. The boiler will also connect to the office end of the building and connect to the existing hot water heating system to replace the existing boiler that is non functional. This solicitation includes required insurance as recommended for the project’s specifications and scope of work. It is highly encouraged potential responders review Section 00 73 16 Insurance Requirements as well as AIA A201, Article 11 of the solicitation before submitting a response. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: 1. Responding company has completed as a Prime Contractor or as a Subcontractor, the work for at least five years which have achieved Substantial Completion since January of 2021 for construction of hot water boilers with in-floor radiant tubing. Each of these contracts MUST have had a construction value of $87,000.00 or greater. OR In lieu of Responding company’s projects, Responder may provide on the form below up to three qualifying projects completed by the proposed Project Manager while employed by others as a Project Manager which have achieved Substantial Completion January of 2021 for hot water boiler with in-floor radiant tubing and $87,000.00 or greater. Category: Mechanical Systems, Construction, Plumbing, Electrical. Estimated Value: $ 147,500.00. Estimated Completion Date: Nov. 2, 2026. Pre-Bid Meeting: A mandatory Pre-Bid meeting will be held at 1:00 PM on August 18, 2026, at the site located at 4777 Highway 53, Saginaw, MN 55779. Responders must attend the pre-bid meeting prior to submitting their response. Responses received from responders that did not attend the pre-bid meeting will be rejected. Bid Submission: All responses to this solicitation must be submitted and received in the QuestCDN Plan Room no later than the due date and time. Bids will only be received and accepted via the online electronic bid service through QuestCDN.com. Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.