- Headworks facility Rehabilitation with new screening and grit removal system
- Influent lift station pump replacement
- Modify/Rehabilitate/Expand existing splitter box
- Construct (1) New Primary Clarifier
- Rehabilitate (4) existing SBR cells
- Construct (1) New SBR cell
- Rehabilitate/replace existing Effluent Filters
- Rehabilitate/Modify existing Ultraviolet Disinfection System
- Construct New Scum Lift Station
- Install Additional Gravity Belt Thickener
- Construct New Blower Building
- Remove and Replace existing Blowers
- Associated piping, valving, flow measurement and misc equipment with appurtenances
- Associated SCADA & Electrical system with appurtenances
- Miscellanous minor component rehabilitation
## Details
**Bid/Project ID:** DU-20-02
**Type of Work:** Wastewater Treatment Plant Rehabilitation
**Pre-Bid Location:** Durant City Hall, 300 W Evergreen, Durant, OK 74701
**Pre-Bid Notes:** Mandatory pre-bid conference
**Bid Location:** Durant City Hall, 300 W Evergreen, Durant, OK 74701
**Bid Notes:** The Bids will be publicly opened and read aloud at this time at the City Hall. Bids received after this time will not be accepted. Hard copy bid submittals only in addressed envelopes or packages addressed as follows: "Durant City Utilities Authority, Attn: City Clerk, Durant City Hall, Attention: Bid Enclosed". All envelopes and packages must clearly identify the project name on the OUTSIDE cover where it can be identified as a bid submittal.
**Engineer/Publisher:** Wall Engineering
**Engineer Address:** PO Box 1457, Durant, Oklahoma, 74702
## Additional Notes
No verbal questions will be responded to. Please submit through CivCast. Only responses issued via written Addenda or answered in Q&A section of CivCast are binding. Complete sets of Bidding Documents must be used in preparing bids. Neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete or incorrectly printed / scaled sets of bidding documents.
## Notes
It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and or Bids Amounts. Official hard copy plans are available through CivCast for an additional fee. Addenda and project changes will ONLY be posted to CivCast and it is the responsibility of the Contractor to check the site periodically.