SLED Opportunity · GEORGIA · GEORGIA
AI Summary
Construction services for EB Hamilton Sports Complex Parking Lot including concrete work, curb and gutter installation, stormwater catch basins, and sidewalk construction. Project duration is 45 days to substantial completion.
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed EB Hamilton Sports Complex Parking Lot Improvements Division A: Concrete, et al. as shown on the construction drawings. In general, construction consists of the installation of approximately ± 7,800 linear feet of 18" curb & gutter, construction of 19 stormwater catch basins, ± 554 square yards of sidewalk and all associated measures for the complete project. Time allotted for completion of work is 45 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 60 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.