    AI Summary

    Contract for electrical service rehabilitation in Saratoga Spa State Park, including removal of overhead lines, installation of underground 13.2 kV system, electrical equipment, traffic control, and restoration work with MBE, WBE, and SDVOB participation goals.

    Opportunity details

    Solicitation No.
    2136224
    Type / RFx
    RFP
    Level
    state
    Published Date
    June 18, 2026
    Due Date
    July 16, 2026
    NAICS Code
    237130AI guide
    Jurisdiction
    new york
    Agency
    Parks Recreation & Historic Preservation, NYS Office of

    Description

    Replacement of the overhead primary electrical service to an underground 13.2 kV system within the southern portion of the Saratoga Spa State Park along with installing service connections to all existing facilities. The limits of the work are East-West Road from Route 50 to Route 9 and Geyser Loop Road from East-West Road to the Orenda Pavilion. Contract work to include: 1. Removal of existing overhead wires, poles, and pole mounted equipment, 2. Installation of a buried duct bank consisting of conduit and electric service cables, 3. Installation of pullboxes, manholes, ground mounted transformers, switchgears, and other electrical equipment along with related connections to existing facilities, 4. Coordination with National Grid as required for the installation of a new primary meter pole and riser pole, 5. The conversion of the existing dual ratio single phase pad-mounted transformers on North-South Rd, and the existing dual ratio Peerless Pool three phase pad-mounted transformer from 4.160 kV to 13.2 kV, 6. Restoration of trenches to match existing surfaces asphalt / concrete / topsoil / seed), 7. Horizontal directional drilling of duct bank underneath Geyser Creek, 8. Installation of two streetlight poles, 9. Removal of one tree, 10. Installation of temporary erosion control measures, 11. Work zone traffic control including signing and flaggers as necessary. At least one travel lane is to remain open during work hours on all roads. Both travel lanes will need to be opened daily at end of workday. Goals: MBE 14 % WBE 16% SDVOB 6% Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 14.00% WBE Goal: 16.00%

    Key dates

    1. June 18, 2026Published
    2. July 16, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.