SLED Opportunity · CALIFORNIA · FAIRFIELD-SUISUN SEWER DISTRICT
AI Summary
Electrical Replacement Phase 2 at Suisun Pump Station involves installation of a new diesel standby generator, demolition of existing equipment, piping and electrical work, and pavement rehabilitation in Fairfield and Suisun City, CA.
The Project generally consists of installation of new owner-furnished, 1,250 kW diesel engine-driven standby generator and owner-furnished automatic transfer switch and triple switch equipment; construction of new concrete pad foundations and stand-alone metal platforms; Demolition and disposal of existing standby generator, above ground diesel storage tank, and associated facilities; Relocation of existing odor scrubber system and appurtenant equipment; Installation of yard piping, duct banks and other appurtenant work to connect power and controls between new and existing electrical equipment; Furnishing and installing temporary standby power system equipment; pavement rehabilitation and other related work. A valid Class A or Class C-10 contractor’s license is required to bid on the Project.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.