SLED Opportunity · NEW YORK · NEW YORK
AI Summary
Installation of two DC Fast Charging Electric Vehicle Charging Stations at 2-10 Broadway, Kingston, NY, including equipment, labor, permits, and warranty services.
The Contractor shall furnish and install two (2) DC Fast Charging Electric Vehicle Charging Stations at 2–10 Broadway, Kingston, NY. The specified basis of design is the ChargePoint Express 280 (80kW per unit, 160kW when paired) with NACS and CCS1 connectors; however, equivalent products will be considered in accordance with this RFB. Each charging station shall include, at a minimum: standard cable length, power modules, cable management system, integrated signage, a minimum 10-inch touch display, contactless credit card and RFID payment capability, cellular and/or Wi-Fi connectivity, and UL listing. The project shall also include a minimum of five (5) years prepaid cloud/network service and a minimum of five (5) years warranty coverage, or equivalent. The Contractor shall provide all labor, materials, equipment, permits, and incidentals necessary to complete the installation in accordance with the Project Specifications, including all applicable local, state, and federal codes and regulations. The Contractor shall assist the City, upon award, in identifying and applying for any available incentive or rebate programs Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.