Active SLED Opportunity · CALIFORNIA · CITY AND COUNTY OF SAN FRANCISCO
AI Summary
San Francisco Fire Department is consolidating training facilities into a new 8-acre site with multiple buildings. Multiple trade bid packages are scheduled from July 2025 to December 2025. Subcontractors must prequalify with Swinerton to bid. Project includes design-build pile system, elevators, earthwork, fire suppression, plumbing, HVAC, electrical, and more.
San Francisco Fire Department Division of Training Project - CM/GC: Trade Package The San Francisco Fire Department (SFFD) is consolidating, replacing and relocating its current training facilities at Treasure Island and 2310 Folsom Street, San Francisco to a new state-of-the art, 8-acre site at 1200-1298 Carroll Avenue in the Hunters Point/Bayview neighborhoods. The new SFFD DOT will have approximately 12 primary buildings, totaling approximately 147,531 gross square feet. 58,432 square feet of buildings will be Occupied Buildings (offices, classrooms, training and support buildings), while 53,134 square feet of buildings will be Unoccupied Training Structures (simulated buildings for fire and rescue training), while another 4,132 square feet of buildings will be Campus Shared Spaces. Link below is to Swinerton’s BuildingConnected.com bid portal, where all bid documents are located. https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de Current Advertisement: 7/1/2025 - Bid Package 01 – Design-Build Pile System & Bid Package 02 – Elevators 7/23/2025 - Bid Package: - Bid Package 03.1 – Earthwork, Erosion Control/SWPPP, Site Demolition - Bid Package 03.2 – Fine Grading - Bid Package 04 – Water Based Fire Suppression System - Bid Package 05 – Plumbing - Bid Package 06 – HVAC - Bid Package 07 – Electrical - Bid Package 08 – Site Utilities and Relocation, Temp Power - Bid Package 09 – SF Fire Props - 8/13/2025: Bid Package 02 - Addendum No. 1 issued. - 12/10/2025: Bid Package 14 - Misc. Metal Rebid R1 Subcontractors Prequalification: All subcontractors must be prequalified with Swinerton before submitting bids. Bids will not be accepted if the subcontractor has not initiated the prequalification process. Please use the link below to start the process. Send any questions to subcontractorprequal@swinerton.com. Prequal Link: https://swinerton.com/subcontractor-prequalification/ All bidders will be expected to enter into a Master Service Agreement upon award. Project Labor Agreement: Please refer to Project Manual sections 00 52 10 & 00 73 34. DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.