SLED Opportunity · CALIFORNIA · CITY AND COUNTY OF SAN FRANCISCO
AI Summary
Invitation to bid for select trades on the new Treasure Island Behavioral Health Building in San Francisco. Early bids requested for exterior maintenance, elevators, fire sprinkler, plumbing, HVAC, electrical, and solar system. Project starts November 2026 with union labor and prevailing wage requirements.
INVITATION TO BID – SELECT TRADES Treasure Island E1.2 Behavioral Health Building - 571 Treasure Island Parcel E1.2, San Francisco, CA 94130 February 13, 2026 1. BID DUE DATE: Monday, March 16, 2026 @ 2:00 p.m. 2. JOB WALK: There is no job walk scheduled for these trades. However, subcontractors are encouraged to visit the site on their own. 3. REQUESTED TRADES: For the following trades this is an *EARLY BID* Cahill will provide Bid Form & Exhibit A documents for these scopes. a. Design-Build Exterior Building Maintenance b. Elevators c. Design-Build Fire Sprinkler System d. Plumbing e. HVAC f. Electrical, FA, ERRCS g. Design-Build Solar System 4. PROJECT DESCRIPTION: THIS IS A CAHILL PROJECT. New Construction / 68,500 gsf / 120 Rooms or Units / 1 Building / 6 Stories / 5-Story Type IIIA over 1-Story Type IA Concrete. Level 01 amenities include a full-service kitchen, dining, staff lounge, fitness, multipurpose room, and outdoor space. Levels 02-06 will provide 120 residential sleeping units (dorm style), with group training rooms and therapist offices to support residential use. Note that there is no kitchen or bathroom at residential units. Centralized bathrooms on each floor and food service kitchen on ground floor. 5. OWNER/DEVELOPER: Mercy Housing / San Francisco Department of Public Health 6. ARCHITECT: Gensler/ Paulett Taggart Architects 7. TENTATIVE SCHEDULE: Begin construction in November 2026 with a total 19-month duration. Ref. Exhibit D - Schedule 8. LABOR REQUIREMENTS: Prevailing Wage (state or federal, higher of the two) for all trades / Union Labor required for carpenters, laborers, operating engineers only 9. EQUAL OPPORTUNITY WORK FORCE PARTICIPATION GOALS: The developer has committed to meeting the San Francisco Contract Monitoring Division’s (SFCMD) non-discrimination, equal opportunity contracting and local workforce hiring participation goals including Small Business Enterprises participation (20% SBE), Construction Work Force Goals, Prevailing Wage requirements. 10. DEADLINE FOR BID RFI’s: Tuesday, February 24, 2026 @ EOD. 11. BID DOCUMENTS: All bid documents can be accessed through BuildingConnected. 12. BID EXHIBITS: All bidders should review the bid requirements as defined by the Bid Exhibits which include: Scope of Work, General Requirements, Contracting & Workforce Hiring Goals, Schedule, Contract Term/Labor Relations, Insurance Requirements, Document List, Logistic plan, Environmental Health and Safety, Design Build Requirements, and BIM Requirements, 13. BID FORM: All bid submissions should include a completed and signed bid form. 14. BUILDINGCONNECTED: All bid submissions and communication should be made on BuildingConnected. 15. BID STATUS: Please update your bidding status on BuildingConnected by Friday, February 20, 2026. 16. CONTACT: For any questions regarding this project or BuildingConnected access, please contact Cahill Estimating at estimating@cahill-sf.com. PLEASE do not contact the Owner/Architect directly. ---------------------------------------------------------------------
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.