City of Clearwater seeks bids for furnishing and installing aluminum platforms, pumping systems, and electrical panels at multiple lift stations with associated site and electrical work. Final completion by December 31, 2026.
Lift Station 9 and 10 - Furnishing and installing Aluminum Platforms, wet wells, valve vaults and duplex pumping system with the associated electrical work and site work. Improvements include adjacent force mains and gravity sewers.
Lift Stations 11, 28, 39 and 80 - Furnishing and installing Aluminum Platforms with the associated electrical work and site work.
Lift Station 35 - Furnishing and installing a Telescoping Electrical Panel with the associated electrical work and site work.
The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response.
The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.
Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline)
| Event | Date | Location |
|---|---|---|
| Bid Opening Location | 100 S Myrtle Ave. Clearwater, FL 33756 |
Electrical and structural plans were added to the Attachments tab.
Please use the See What Changed link to view all the changes made by this addendum.
Additional Attachments were added and Pricing Sheet was updated.
Please use the See What Changed link to view all the changes made by this addendum.
ADDENDUM #3
Please use the See What Changed link to view all the changes made by this addendum.
Project Name: FDEM Lift Station Grant 4337-484-R Lift Stations Control Panel Elevation, Floodproofing Measures.
Project Number: 26-0022-UT
Scope of Work:
Lift Station 9 and 10 - Furnishing and installing Aluminum Platforms, wet wells, valve vaults and duplex pumping system with the associated electrical work and site work. Improvements include adjacent force mains and gravity sewers.
Lift Stations 11, 28, 39 and 80 - Furnishing and installing Aluminum Platforms with the associated electrical work and site work.
Lift Station 35 - Furnishing and installing a Telescoping Electrical Panel with the associated electrical work and site work.
The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response.
The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.
Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline)
Reference Attachment A - Technical Specifications
Section IV - Technical Specifications can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications
Section V - Contract Documents can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications
Are you a Certified Small Business or a Certified Minority, Woman or Disadvantaged Business Enterprise?
Pick one of the following
List the Agency that provided your certification.
Provide a copy of your certification
By submitting this response, the Vendor hereby certifies that:
PER FLORIDA STATUTE 448.095, CONTRACTORS AND SUBCONTRACTORS MUST REGISTER WITH AND USE THE E-VERIFY SYSTEM TO VERIFY THE WORK AUTHORIZATION STATUS OF ALL NEWLY HIRED EMPLOYEES.
The affiant, by virtue of confirming below, certifies that:
Please download the below documents, complete, notarize, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Upload your current W-9 form. (available at https://www.irs.gov/pub/irs-pdf/fw9.pdf)
Q (No subject): Structural and Electrical plans not provided.
A: The plans have been added to the attachments tab.
Q (No subject):
A: Do you have a preferred Vendor for the Control Panels on 9 and 10? See Specification Section 407-12.7.25. LS 9 and LS 10 - Control Panel shall be manufactured by Xylem, Unitron Controls, C2i Controls or approved equal. LS 35 - Telescoping Panel shall be manufactured by Primex or approved equal.
Q (No subject):
A: On the rest of the stations are we just moving the existing panels or full replacements For LS 11, 28, 39, 80, 35 - Equipment Denoted on proposed Single Line Diagrams with a (N) are new. Equipment denoted on proposed Single Line Diagrams with a (RL) are relocated.
Q (Specification Section 407-12.7.25. LS 9 and LS 10 - Approve Equal): For LS#9 and LS#10, can Primex be considered an Approved Equal? The Primex location servicing the City of Clearwater is local to Largo, FL, and we have prior experience supplying lift station control panels to the City of Clearwater. Additionally, we have extensive experience designing and manufacturing lift station control panels for multiple municipalities both locally and regionally, including St. Petersburg, Safety Harbor, Pinellas County, Manatee County, Hillsborough County, Pasco County, Hernando County, and others both in and out of state. Primex also offers a standard two‑year out‑of‑the‑box warranty. Please advise if possible, if there is a specific procedure or documentation that Primex must follow or submit in order to meet the criteria for approval as an Approved Equal for this project. -Thanks for the support Jay S.
A: "The Contractor can submit a Substitute and “Or Equal” Item to the City and Engineer for review and approval after the Contractor’s Notice of Award. If the City does not approve of the Substitute and “Or Equal” Item, the Contractor will be required to furnish and install the material or equipment per the City’s specifications and standards. Reference General Conditions, Section 6.3 Substitutes and “Or Equal” Items. 6.3 SUBSTITUTES AND ""OR EQUAL"" ITEMS Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or ""or equal"" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be accepted by Engineer. If in Engineer's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by Engineer for approval. If in the Engineer's sole discretion an item of material or equipment proposed by Contractor does not qualify as an ""or equal"" item, it may be considered as a proposed substitute item. Contractor shall submit sufficient information as required by the Engineer to allow the Engineer to determine that the item of material or equipment proposed is essentially equivalent to that named and is an acceptable substitute, therefore. Request for review of proposed substitute and ""or equal"" will not be accepted by Engineer from anyone other than Contractor. Request for substitute and ""or equal"" items by the Contractor must be submitted in writing to Owner’s Representative and will contain all the information as Engineer deems necessary to make a determination. Request for substitute shall identify why a substitute is submitted and include advantages to the Owner. All data provided by Contractor in support of any proposed substitute or ""or equal"" item will be at Contractor's expense. The Engineer will be allowed a reasonable time to evaluate each proposal or submittal made per this paragraph. The Engineer will be sole judge of acceptability."