    FDEM Lift Station Grant 4337-484-R Lift Stations Control Panel Elevation, Floodproofing Measures.

    Issued by City of Clearwater
    cityInvitation To BidCity of ClearwaterSol. 233713
    Closed
    STATUS
    Closed
    due Apr 22, 2026
    PUBLISHED
    Mar 18, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    City of Clearwater seeks bids for furnishing and installing aluminum platforms, pumping systems, and electrical panels at multiple lift stations with associated site and electrical work. Final completion by December 31, 2026.

    Opportunity details

    Solicitation No.
    233713
    Type / RFx
    Invitation To Bid
    Status
    open
    Level
    city
    Published Date
    March 18, 2026
    Due Date
    April 22, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    City of Clearwater
    State
    Florida
    Agency
    City of Clearwater

    Description

    Lift Station 9 and 10 - Furnishing and installing Aluminum Platforms, wet wells, valve vaults and duplex pumping system with the associated electrical work and site work. Improvements include adjacent force mains and gravity sewers.

    Lift Stations 11, 28, 39 and 80 -   Furnishing and installing Aluminum Platforms with the associated electrical work and site work.

    Lift Station 35 - Furnishing and installing a Telescoping Electrical Panel with the associated electrical work and site work.

    The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response.

    The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.

    Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline)

    Project Details

    • Reference ID: 26-0022-UT
    • Department: Public Works
    • Department Head: Marcus Williamson (Department Director)

    Important Dates

    • Questions Due: 2026-04-08T21:00:02.975Z
    • Pre-Proposal Meeting: 2026-04-01T14:00:38.247Z — Zoom

    Meetings & Milestones

    EventDateLocation
    Bid Opening Location100 S Myrtle Ave. Clearwater, FL 33756

    Addenda

    • Addendum #1 (released 2026-03-19T16:38:37.549Z) —

      Electrical and structural plans were added to the Attachments tab.

       

      Please use the See What Changed link to view all the changes made by this addendum.

    • Official Notice #1: Prebid Meeting Agenda (released 2026-03-25T14:10:58.300Z)
    • Addendum #2 (released 2026-04-14T11:17:28.601Z) —

      Additional Attachments were added and Pricing Sheet was updated.

       

      Please use the See What Changed link to view all the changes made by this addendum.

    • Addendum #3 (released 2026-04-14T18:41:54.725Z) —

      ADDENDUM #3

       

      1. Drawing No. C- 104, Lift Station 9 Proposed Site Plan, LS #9 Notes – Add note: “11. There is an existing gas main, water main, and storm drain adjacent to the EOP in front of the Lift Station. Prior to the start of construction, the Contractor shall perform Test Holes as required to determine their location.” 

       

      1. Drawing No. C-116, Lift Station 28 Proposed Site Plan – Replace Drawing No. C-116 with Drawing No. C-116A. Additional information regarding the Guardrails is included.

       

      1. Drawing No. C-118, Lift Station 39 Proposed Site Plan - Replace Drawing No. C-118 with Drawing No. C-118A. Additional information regarding the Guardrails is included.

       

      1. Drawing No. E-0031, Electrical Legend 3 of 3, General Notes – Add note: “39. All Electrical Equipment mounted on the Aluminum Platforms shall be 2 feet above the Aluminum Platform Grating.” 

       

      1. Under Overview / Summary / Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline) - Add the following sentence: “The City has contacted the FDEM and an extension is pending that will change the Final Completion date to March 31, 2027.”

       

      1. Under 3. Technical Specifications / 3.1. Scope of Work / Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline) - Add the following sentence: “The City has contacted the FDEM and an extension is pending that will change the Final Completion date to March 31, 2027.”

       

      Please use the See What Changed link to view all the changes made by this addendum.

    Evaluation Criteria

    • SCOPE OF WORK

      Project Name: FDEM Lift Station Grant 4337-484-R Lift Stations Control Panel Elevation, Floodproofing Measures.

      Project Number: 26-0022-UT

      Scope of Work:

      Lift Station 9 and 10 - Furnishing and installing Aluminum Platforms, wet wells, valve vaults and duplex pumping system with the associated electrical work and site work. Improvements include adjacent force mains and gravity sewers.

      Lift Stations 11, 28, 39 and 80 -   Furnishing and installing Aluminum Platforms with the associated electrical work and site work.

      Lift Station 35 - Furnishing and installing a Telescoping Electrical Panel with the associated electrical work and site work.

      The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response.

      The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor’s schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor’s schedule of work.

      Contract Period: Final Completion is December 31, 2026 (FDEM Grant Deadline)

    • Technical Specifications

      Reference Attachment A - Technical Specifications

    • Section IV - Technical Specifications

      Section IV - Technical Specifications can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications

       

    • Section V - Contract Documents

      Section V - Contract Documents can be found on the City's website at:  https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications

    Submission Requirements

    • Certified Business (required)

      Are you a Certified Small Business or a Certified Minority, Woman or Disadvantaged Business Enterprise?

    • Certified Business Type (required)

      Pick one of the following

    • Certifying Agency (required)

      List the Agency that provided your certification.

    • Certification Documentation (required)

      Provide a copy of your certification

    • Vendor Certification (required)

      By submitting this response, the Vendor hereby certifies that:

      1. It is under no legal prohibition on contracting with the City of Clearwater.
      2. It has read, understands, and is in compliance with the specifications, terms and conditions stated herein, as well as its attachments, and any referenced documents.
      3. It has no known, undisclosed conflicts of interest.
      4. The prices offered were independently developed without consultation or collusion with any of the other vendors or potential vendors or any other anti-competitive practices.
      5. No offer of gifts, payments or other consideration were made to any City employee, officer, elected official, or consultant who has or may have had a role in the procurement process for the commodities or services covered by this contract. The Vendor has not influenced or attempted to influence any City employee, officer, elected official, or consultant in connection with the award of this contract.
      6. It understands the City may copy all parts of this response, including without limitation any documents or materials copyrighted by the Vendor, for internal use in evaluating respondent’s offer, or in response to a public records request under Florida’s public records law (F.S. Chapter 119) or other applicable law, subpoena, or other judicial process; provided that the City agrees not to change or delete any copyright or proprietary notices.
      7. It hereby warrants to the City that the Vendor and its subcontractors will comply with, and are contractually obligated to comply with, all federal, state, and local laws, rules, regulations, and executive orders.
      8. It certifies that Vendor is not presently debarred, suspended, proposed for debarment, declared ineligible, voluntarily excluded, or disqualified from participation in this matter from any federal, state, or local agency.
      9. It will provide the commodities or services specified in compliance with all federal, state, and local laws, rules, regulations, and executive orders if awarded by the City.
      10. It is current in all obligations due to the City.
      11. It will accept all terms and conditions as set forth in this solicitation if awarded by the City.
      12. The signatory is an officer or duly authorized representative of the Vendor with full power and authority to submit binding offers and enter into contracts for the commodities or services as specified herein.
    • E-Verify System Certificattion (required)

      PER FLORIDA STATUTE 448.095, CONTRACTORS AND SUBCONTRACTORS MUST REGISTER WITH AND USE THE E-VERIFY SYSTEM TO VERIFY THE WORK AUTHORIZATION STATUS OF ALL NEWLY HIRED EMPLOYEES.

      The affiant, by virtue of confirming below, certifies that:

      1. The Contractor and its Subcontractors are aware of the requirements of Florida Statute 448.095.
      2. The Contractor and its Subcontractors are registered with and using the E-Verify system to verify the work authorization status of newly hired employees.
      3. The Contractor will not enter into a contract with any Subcontractor unless each party to the contract registers with and uses the E-Verify system.
      4. The Subcontractor will provide the Contractor with an affidavit stating that the Subcontractor does not employ, contract with, or subcontract with unauthorized alien.
      5. The Contractor must maintain a copy of such affidavit.
      6. The City may terminate this Contract on the good faith belief that the Contractor or its Subcontractors knowingly violated Florida Statutes 448.09(1) or 448.095(2)(c).
      7. If this Contract is terminated pursuant to Florida Statute 448.095(2)(c), the Contractor may not be awarded a public contract for at least 1 year after the date on which this Contract was terminated.
      8. The Contractor is liable for any additional cost incurred by the City as a result of the termination of this Contract.
    • Scrutinized Company Certification (required)

      Please download the below documents, complete, notarize, and upload.

    • Compliance with Anti-Human Trafficking Laws (required)

      Please download the below documents, complete, and upload.

    • Section V - Contract Documents (required)

      Please download the below documents, complete, and upload.

    • W-9 (required)

      Upload your current W-9 form.  (available at https://www.irs.gov/pub/irs-pdf/fw9.pdf)

       

    Questions & Answers

    Q (No subject): Structural and Electrical plans not provided.

    A: The plans have been added to the attachments tab.


    Q (No subject):

    A: Do you have a preferred Vendor for the Control Panels on 9 and 10? See Specification Section 407-12.7.25. LS 9 and LS 10 - Control Panel shall be manufactured by Xylem, Unitron Controls, C2i Controls or approved equal. LS 35 - Telescoping Panel shall be manufactured by Primex or approved equal.


    Q (No subject):

    A: On the rest of the stations are we just moving the existing panels or full replacements For LS 11, 28, 39, 80, 35 - Equipment Denoted on proposed Single Line Diagrams with a (N) are new. Equipment denoted on proposed Single Line Diagrams with a (RL) are relocated.


    Q (Specification Section 407-12.7.25. LS 9 and LS 10 - Approve Equal): For LS#9 and LS#10, can Primex be considered an Approved Equal? The Primex location servicing the City of Clearwater is local to Largo, FL, and we have prior experience supplying lift station control panels to the City of Clearwater. Additionally, we have extensive experience designing and manufacturing lift station control panels for multiple municipalities both locally and regionally, including St. Petersburg, Safety Harbor, Pinellas County, Manatee County, Hillsborough County, Pasco County, Hernando County, and others both in and out of state. Primex also offers a standard two‑year out‑of‑the‑box warranty. Please advise if possible, if there is a specific procedure or documentation that Primex must follow or submit in order to meet the criteria for approval as an Approved Equal for this project. -Thanks for the support Jay S.

    A: "The Contractor can submit a Substitute and “Or Equal” Item to the City and Engineer for review and approval after the Contractor’s Notice of Award. If the City does not approve of the Substitute and “Or Equal” Item, the Contractor will be required to furnish and install the material or equipment per the City’s specifications and standards. Reference General Conditions, Section 6.3 Substitutes and “Or Equal” Items. 6.3 SUBSTITUTES AND ""OR EQUAL"" ITEMS Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or ""or equal"" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be accepted by Engineer. If in Engineer's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by Engineer for approval. If in the Engineer's sole discretion an item of material or equipment proposed by Contractor does not qualify as an ""or equal"" item, it may be considered as a proposed substitute item. Contractor shall submit sufficient information as required by the Engineer to allow the Engineer to determine that the item of material or equipment proposed is essentially equivalent to that named and is an acceptable substitute, therefore. Request for review of proposed substitute and ""or equal"" will not be accepted by Engineer from anyone other than Contractor. Request for substitute and ""or equal"" items by the Contractor must be submitted in writing to Owner’s Representative and will contain all the information as Engineer deems necessary to make a determination. Request for substitute shall identify why a substitute is submitted and include advantages to the Owner. All data provided by Contractor in support of any proposed substitute or ""or equal"" item will be at Contractor's expense. The Engineer will be allowed a reasonable time to evaluate each proposal or submittal made per this paragraph. The Engineer will be sole judge of acceptability."


    Key dates

    1. March 18, 2026Published
    2. April 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.