Active SLED Opportunity · COLORADO · CITY AND COUNTY OF DENVER DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
AI Summary
Invitation for Bid to replace an existing span wire signal with a new HAWK pedestrian signal and construct ADA ramps at Federal Boulevard and Amherst Avenue in Denver, CO. Bids due July 30, 2026, submitted electronically via BidNet.
The project is for replacement of an existing span wire signal with a new HAWK pedestrian signal. Work also includes construction of ADA ramps for the pedestrian crossing. **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2323729.C14847676 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/16/2026 12:00 PM EDT **Questions are submitted online**: No **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“BidNet”). Bids must be submitted via BidNet no later than July 30, 2026 at 2:00 p.m. Prospective bidders must be on the plan holders list on BidNet for bids to be accepted. To access the electronic bid form, download the required documents from BidNet and complete the... **Owner Organization**: City and County of Denver Department of Transportation and Infrastructure **Reference Number**: 0000429042 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Form | 202685002 Bid Form | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/07/2026 03:00 PM EDT | Location: Via Teams Meeting **Line Items**: | description | quantity | uom | unitPrice | |---|---|---|---| | REMOVAL OF SIDEWALK | 31.0 | Square Yard | | | REMOVAL OF ASPHALT MAT | 55.0 | Square Yard | | | HOT MIX ASPHALT (PATCHING) (ASPHALT) | 55.0 | Square Yard | | | CONCRETE SIDEWALK (6 INCH) | 34.0 | Square Yard | | | CURB AND GUTTER TYPE 2 (SECTION II-B) | 38.0 | Linear Foot/Feet | | | CLEARING AND GRUBBING | 1.0 | Lump-Sum | | | REMOVAL OF TREE | 2.0 | Each | | | REMOVAL OF FIRE HYDRANT | 1.0 | Each | | | REMOVAL OF SIDEWALK | 26.0 | Square Yard | | | REMOVAL OF CURB AND GUTTER | 39.0 | Linear Foot/Feet | | | REMOVAL OF CONCRETE CURB RAMP | 41.0 | Square Yard | | | REMOVAL OF ASPHALT MAT | 51.0 | Square Yard | | | REMOVAL OF PAVEMENT MARKING | 535.0 | Square Foot/Feet | | | REMOVAL OF SIGN PANEL | 1.0 | Each | | | REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1.0 | Lump-Sum | | | CLEAN VALVE BOX | 1.0 | Each | | | CLEAN INLET | 1.0 | Each | | | UNSUITABLE MATERIAL | 5.0 | Cubic Yard | | | POTHOLING | 12.0 | Hour | | | AGGREGATE BAG | 6.0 | Linear Foot/Feet | | | PRE-FABRICATED CONCRETE WASHOUT STRUCTURE (TYPE 1) | 1.0 | Each | | | STORM DRAIN INLET PROTECTION (TYPE II) | 1.0 | Each | | | SWEEPING (SEDIMENT REMOVAL) | 24.0 | Hour | | | EROSION CONTROL MANAGEMENT | 10.0 | Day | | | RESET SIGN PANEL | 4.0 | Each | | | ADJUST VALVE BOX | 1.0 | Each | | | SOIL PREPARATION (LAWN) | 0.01 | Acre | | | DECIDUOUS TREE (2.5 INCH CALIPER) | 2.0 | Each | | | HERBICIDE TREATMENT | 4.0 | Hour | | | WILDLIFE BIOLOGIST | 8.0 | Hour | | | AGGREGATE BASE COURSE (CLASS 6) | 7.0 | Cubic Yard | | | HOT MIX ASPHALT (PATCHING) (ASPHALT) | 51.0 | Square Yard | | | DRILLED SHAFT (24 INCH) | 4.0 | Linear Foot/Feet | | | DRILLED SHAFT (36 INCH) | 26.0 | Linear Foot/Feet | | | CONCRETE SIDEWALK (6 INCH) | 29.0 | Square Yard | | | CONCRETE CURB RAMP | 46.0 | Square Yard | | | CURB AND GUTTER TYPE 2 (SECTION II-B) | 28.0 | Linear Foot/Feet | | | MEDIAN COVER MATERIAL (4 INCH PATTERNED CONCRETE) | 55.0 | Square Foot/Feet | | | 2-INCH ELECTRICAL CONDUIT | 25.0 | Linear Foot/Feet | | | 2-INCH ELECTRICAL CONDUIT (BORED) | 100.0 | Linear Foot/Feet | | | 3-INCH ELECTRICAL CONDUIT | 120.0 | Linear Foot/Feet | | | 3-INCH ELECTRICAL CONDUIT (BORED) | 200.0 | Linear Foot/Feet | | | PULL BOX (24"x36"x24") | 2.0 | Each | | | WIRING | 1.0 | Lump-Sum | | | LUMINAIRE (LED)(6,000 LUMENS) | 2.0 | Each | | | METER POWER PEDESTAL | 1.0 | Each | | | SIGN PANEL (CLASS I) | 50.0 | Square Foot/Feet | | | STEEL SIGN POST (2 x 2 INCH TUBING) | 78.5 | Linear Foot/Feet | | | PEDESTRIAN SIGNAL FACE (16)(COUNTDOWN) | 2.0 | Each | | | TRAFFIC SIGNAL FACE (12-12-12) | 5.0 | Each | | | PEDESTRIAN PUSH BUTTON POST ASSEMBLY | 2.0 | Each | | | FIRE PREEMPTION UNIT | 2.0 | Each | | | TRAFFIC SIGNAL POLE STEEL (1-35 FOOT MAST ARM) | 1.0 | Each | | | TRAFFIC SIGNAL POLE STEEL (1-45 FOOT MAST ARM) | 1.0 | Each | | | TELEMETRY (FIELD) | 1.0 | Each | | | TRAFFIC SIGNAL CONTROLLER (TYPE 170) | 1.0 | Each | | | UNINTERUPTED POWER SUPPLY | 1.0 | Each | | | CLOSED CIRCUIT TELEVISION | 1.0 | Each | | | ETHERNET SWITCH TYPE II | 1.0 | Each | | | 6 INCH FIRE HYDRANT | 1.0 | Each | | | CONSTRUCTION SURVEYING | 1.0 | Lump-Sum | | | MOBILIZATION | 1.0 | Lump-Sum | | | PUBLIC INFORMATION SERVICES | 1.0 | Lump-Sum | | | MODIFIED EPOXY PAVEMENT MARKING | 2.0 | Gallon | | | PREFORMED THERMOPLASTIC PAVEMENT MARKING (WORD-SYMBOL) | 16.0 | Square Foot/Feet | | | PREFORMED THERMOPLASTIC PAVEMENT MARKING (XWALK-STOPLINE) | 518.0 | Square Foot/Feet | | | SURVEY MONUMENT (TYPE 5S) | 2.0 | Each | | | FLAGGING | 32.0 | Hour | | | UNIFORMED TRAFFIC CONTROL | 6.0 | Hour | | | TRAFFIC CONTROL INSPECTION | 12.0 | Day | | | TRAFFIC CONTROL MANAGEMENT | 60.0 | Day | | | FLASHING BEACON (PORTABLE) | 6.0 | Each | | | BARRICADE (TYPE 3 M-A) (TEMPORARY) | 9.0 | Each | | | CONSTRUCTION TRAFFIC SIGN (PANEL SIZE A) | 24.0 | Each | | | CONSTRUCTION TRAFFIC SIGN (PANEL SIZE B) | 6.0 | Each | | | PORTABLE MESSAGE SIGN PANEL | 2.0 | Each | | | ADVANCE WARNING FLASHING AND SEQUENCING ARROW PANEL (C TYPE) | 2.0 | Each | | | DRUM CHANNELIZING DEVICE | 10.0 | Each | | | DRUM CHANNELIZING DEVICE (WITH LIGHT)(FLASHING) | 50.0 | Each | | | TRAFFIC CONE | 100.0 | Each | | | F/A 01 MINOR CONTRACT REVISIONS | | | 37500.0 | | F/A 02 FURNISH AND INSTALL ELECTRICAL SERVICES | | | 25000.0 | | F/A 03 LANDSCAPING | | | 10000.0 | | F/A 04 EROSION CONTROL | | | 5000.0 | | F/A 05 ENVIRONMENTAL HEALTH AND SAFETY MANAGEMENT | | | 5000.0 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/23/2026 06:38 PM EDT | | | Addendum No. 2 | 08/03/2026 07:20 PM EDT | | **Communications**: - Communication No.3: The bid form has been revised to add BF-12 LIST OF SUBCONTRACTORS. An official addendum will be issued tomorrow and I want to give advance notice that this new addition will be required in your bid form submission. List all subcontractors who are performing work on this project to be provided on BF-12. Attached is the updated bid form. Thanks — BF 202685002.pdf - Communication No.2: As a reminder the bid opening is Thursday August 6th at 2PM. Attached is the bid summary that includes the meeting link to access virtually and the solicitation document report with firms that have shown interest in the project. Thanks — Bid Summary 202685002.docx - Communication No.2: As a reminder the bid opening is Thursday August 6th at 2PM. Attached is the bid summary that includes the meeting link to access virtually and the solicitation document report with firms that have shown interest in the project. Thanks — Solicitation Document Report 202685002.xlsx - Communication No.1: Attached is the agenda for the pre-bid meeting today. The link to the meeting is included in the agenda and on Do Business with DOTI. — Pre-Bid Meeting Agenda 202685002.pdf
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.