SLED Opportunity · MISSOURI · GREAT RIVERS GREENWAY
AI Summary
Great Rivers Greenway seeks bids for the Deer Creek Greenway extension project in Missouri, including trail construction, road resurfacing, streetscape, and sewer work. The project is federally funded and requires compliance with MoDOT regulations.
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for CMAQ-9901(670) + 2026-002-196 Deer Creek Greenway: Big Bend Blvd to River des Peres Greenway [196] in St. Louis County and Maplewood and St. Louis City, Missouri. This project is partially funded by federal funding and must comply with all applicable requirements of MoDOT's Local Public Agency regulations. The proposed work includes the extension of the Deer Creek Greenway from the existing endpoint just west of the intersection of Big Bend Blvd. and Oxford Ave. to the intersection of Sussex Ave. and Greenwood Blvd., and from the intersection of Greenwood Blvd. and Canterbury Ave. to the River des Peres Greenway at Canterbury Ave. and McCausland Ave. The work will include trail construction, road resurfacing, streetscape improvement, and storm and sanitary sewer construction and includes furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.