SLED Opportunity · FLORIDA · COUNTY OF COLLIER, FL

    Fiberglass pilings for navigational signage

    Issued by County of Collier, FL
    countyRFQCounty of Collier, FLSol. 245569
    Closed
    STATUS
    Closed
    due Apr 10, 2026
    PUBLISHED
    Mar 27, 2026
    Posting date
    JURISDICTION
    County of
    county
    NAICS CODE
    326199
    AI-classified industry

    AI Summary

    Collier County, FL seeks bids for 50 fiberglass composite pilings and 30 couplers to support navigational markers in waterways. Delivery to Naples, FL required. Insurance and compliance documentation mandatory. Due date April 10, 2026.

    Opportunity details

    Solicitation No.
    245569
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    March 27, 2026
    Due Date
    April 10, 2026
    NAICS Code
    326199AI guide
    State
    Florida
    Agency
    County of Collier, FL

    Description

    Collier County Coastal Zone Management would like to request bids for fiberglass composite pilings to be used for the support of navigational markers in the waterways of Collier County. Vendor will provide 50 - 9 inch brown composite fiberglass pilings (0.31 inches thickness) - Length 20 feet. Vendor will provide 30 - 36 inch long couplers for the pilings. Vendor will deliver pilings and couplers to Naples, FL FOB. (4800 Davis Blvd, Naples, FL 34104)

    Project Details

    • Reference ID: QQ-2026-108
    • Department: Coastal Zone Management
    • Department Head: Andrew Miller (Manager)

    Important Dates

    • Questions Due: 2026-04-15T20:00:00.000Z

    Addenda

    • Addendum #1 (released 2026-04-01T15:19:38.594Z) —

      Please use the See What Changed link to view all the changes made by this addendum.

    • Addendum #2 (released 2026-04-10T17:59:59.755Z) —

      Please use the See What Changed link to view all the changes made by this addendum.

    • Addendum #3 (released 2026-04-10T18:17:22.234Z) —

      Please use the See What Changed link to view all the changes made by this addendum.

    Evaluation Criteria

    • Worker’s Compensation

      Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and Requirements

      Evidence of Workers’ Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption. An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/

    • Fiberglass pilings and couplers

      Collier County would like to request bids for fiberglass Composite pilings to be used for the support of navigational markers in the waterways of Collier County. Vendor will provide 50 - 9 inch brown hollow composite fiberglass pilings (0.31 inches thickness) - Length 20 feet. Vendor will provide 30 - 36 inch long couplers for the pilings. Vendor will deliver pilings and couplers to Naples, FL FOB. (4800 Davis Blvd, Naples, FL 34104)

    • Employer’s Liability

      $500,000 single limit per occurrence

    • Commercial General Liability (Occurrence Form) patterned after the current ISO form

      Bodily Injury and Property Damage

      $1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury Liability and Property Damage Liability.  This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability.

    • Indemnification

      To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys’ fees and paralegals’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone employed or utilized by the Contractor/Vendor in the performance of this Agreement. 

    • Automobile Liability

      $1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included

    • Watercraft

       $TBD Per Occurrence

    • United States Longshoreman's and Harborworker's Act

      United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work.

       $TBD Per Occurrence 

    • Maritime Coverage (Jones Act)

      Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work.

      $TBD Per Occurrence

    • Aircraft Liability

      Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement.

      $TBD Per Occurrence

    • Pollution

      $TBD Per Occurrence

    • Professional Liability

      $TBD Per claim & in the aggregate

    • Project Professional Liability

      $TBD Per Occurrence 

    • Valuable Papers Insurance

      $TBD Per Occurrence 

    • Cyber Liability

      $TBD Per Occurrence 

    • Technology Errors & Omissions

      $TBD Per Occurrence 

    • Additional Information
      1. Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet.  The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions.
      2. Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Vendor’s policy shall be endorsed accordingly.
      3. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County.  The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read:  For any and all work performed on behalf of Collier County.
      4. On all certificates, the Certificate Holder must read: Collier County Board of Commissioners, 3295 Tamiami Trail East, Naples, FL 34112
      5. Thirty (30) Days Cancellation Notice required.
      6. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed necessary. Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor.  Premiums shall be billed to the project and the Contractor shall not include Builders Risk premiums in its project proposal or project billings.  All questions regarding Builder’s Risk Insurance will be addressed by the Collier County Risk Management Division.
      7. Professional Services and/or Consulting Services may require professional liability insurance. 
      8. Environmental services, repairs, construction and/or hazardous materials projects may require pollution insurance.

    Submission Requirements

    • I certify that I have read, understood and agree to the terms in this Quick Quote, and that I am authorized to submit this response on behalf of my company. (required)
    • Quick Quote Instructions have been acknowledged and accepted. (required)
    • Collier County Purchase Order Terms and Conditions. Collier County Purchase Order Terms and Conditions have been acknowledged and accepted. (required)

      Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.

       

    • Insurance Requirements -Vendor Acknowledges Insurance Requirements and is prepared to produce the required insurance certificate(s) if awarded this quote. (required)
    • Pricing Proposal (required)
    • Proof of Status from Division of Corporations - Florida Department of State (SunBiz) (required)

      http://dos.myflorida.com/sunbiz/ should be attached with your submittal.

    • E-Verify - Memorandum of Understanding (required)

      Vendor MUST be enrolled in the E-Verify - https://www.e-verify.gov/ at the time of submission of the bid. E-Verify Memorandum of Understanding or Company Profile page should be attached with your submittal.

    • W-9 Form (required)
    • Any required licenses. (required)
    • Insurance Requirement (required)
    • Watercraft (required)

       $ __________ Per Occurrence

    • United States Longshoreman's and Harborworker's Act Coverage (required)

      $ __________ Per Occurrence

    • Maritime Coverage (Jones Act) (required)

      $ __________ Per Occurrence

    • Aircraft Liability (required)

      $ __________ Per Occurrence

    • Pollution (required)

       $ __________ Per Occurrence 

    • Professional Liability (required)

      $ ___________ Per claim & in the aggregate

    • Project Professional Liability (required)

       $__________ Per Occurrence

    • Valuable Papers Insurance (required)

      $__________ Per Occurrence

    • Cyber Liability (required)

       $__________ Per Occurrence

    • Technology Errors & Omissions (required)

      $__________ Per Occurrence

    • Employer's Liability (required)

       $ __________ single limit per occurrence

    • Aggregate - Commercial General Liability for Bodily Injury Liability and Property Damage Liability (required)

      $_________ aggregate

    • Single Limit - Commercial General Liability for Bodily Injury Liability and Property Damage Liability (required)

      $________ single limit per occurrence

    • Automobile Liability (required)

      $________ Each Occurrence

    • Pricing (required)
      • Choose Option 1 when you have set line items, for example:
        • This is a quote for goods or commodities.
        • This is a public works bid, with a pricing table that can be uploaded into OpenGov Procurement from an Excel spreadsheet.
        • Seeking services for hourly rate schedules.
      • Choose Option 2 when you need vendors to provide you with the line items. 
    • Is this a grant-funded quote? (required)

      If this is a grant-funded quote, please make sure that the approval process is updated to accommodate the grants department's approval. 

      You can invite the grant department to upload relevant attachments by clicking on "Invite" and then adding the relevant user with edit access. 

    Questions & Answers

    Q (No subject): Does this project include furnish & install?

    A: We just need the pilings. Installation is not needed.


    Q (Fiberglass pilings): Could an eight-inch piling be substituted for the nine-inch? Certified engineering can prove it's as strong and durable as the nine-inch?

    A: The equipment we use for installation requires a 9" piling.


    Q (Start/Complete): Is there a projected date for piling delivery?

    A: ASAP


    Q (Bonds): Will bid bond and P&P bonds be applicable, and if so please clarify if bid bond will be 5%.

    A: Bonds will only be applicable if the the quotes are over $200k.


    Q (Construction ITB): Section 6 of Quick Quote states there is an attachment for insurance and bonding in the Construction ITB. Will this document be available for download?.

    A: For Quick Quotes, the attached instructions are there for download. Insurance guidelines are part of Section 5, and for these, is what is required.


    Q (Delivery Restrictions): Are there any restrictions on delivery times/days?

    A: Monday through Friday. 8am - 3pm.


    Q (Piling Dimension): Is the 9” requirement an inside or outside dimension?

    A: Outside


    Q (Coupler Specifications): Are there any additional specifications/requirements on the 36” long couplers other than what’s provided in Section 5.1 Fiberglass Pilings and Couplers?

    A: no


    Q (Coupler Material): Should the coupler be composite or metal?

    A: Composite


    Q (Delivery Offload): Quick Quote states vendor will deliver pilings and couplers to 4800 Davis Blvd., Naples, Florida. Is the County going to provide equipment and personnel to off load the piles upon their delivery, or is the vendor responsible for offloading of the piles at the delivery site?

    A: Vendor will be responsible for unloading


    Q (Material Specifications): Are there any additional specifications/requirements on the composite fiberglass pilings other than what’s provided in Section 5.1 Fiberglass Pilings and Couplers? This specifies brown, 20’ long, 9” hollow composite fiberglass pilings, 0.31” thick.

    A: no


    Q (Piling Size): 9” diameter composite piles are not a standard size. May we quote a 10” pile?

    A: The equipment we use for installation requires a 9" piling.


    Q (Retainage): Will there be retainage held on this project and if so, what will the percentage be?

    A: No retainage.


    Q (Notice of Intent to Award): When is the anticipated Notice of Intent to Award?

    A: not applicable. This is not a contract.


    Q (Notice to Proceed): Will a formal Notice to Proceed be given or will it only be the executed contract.

    A: Not applicable. This is not a contract.


    Q (Contract Execution): When is the anticipated contract execution date?

    A: Not applicable. This is not a contract.


    Q (Warranty): What is the warranty requirements?

    A: The minimum manufacturers warranty.


    Key dates

    1. March 27, 2026Published
    2. April 10, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.