SLED Opportunity · NORTH DAKOTA · OFFICE OF THE ADJUTANT GENERAL - NORTH DAKOTA ARMY NATIONAL GUARD - DIRECTORATE OF INSTALLATIONS AND ENVIRONMENT
AI Summary
RFP for fire alarm system replacement at Building 4200, RJB Complex, Bismarck, ND. Estimated construction cost between $500K and $1M. Project managed by Apex Engineering Group, Inc.
FIRE ALARM SYSTEM REPLACEMENT Armory Bldg. 4200 RJB Complex Bismarck, North Dakota Project Number 2522 IFB 26-04 Total Construction Engineer's Name: Apex Engineering Group, Inc. Estimated Price Range (Magnitude of Construction): Between $500,000 and $1,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.