SLED Opportunity · NORTH DAKOTA · OFFICE OF THE ADJUTANT GENERAL - NORTH DAKOTA ARMY NATIONAL GUARD - DIRECTORATE OF INSTALLATIONS AND ENVIRONMENT
AI Summary
RFP for fuel point upgrades at AASF Complex, Bismarck, ND, including general, mechanical, electrical, and combined construction with estimated costs from $100K to $5M.
FUEL POINT UPGRADES AASF Complex Bismarck, North Dakota Project Number 2022 IFB 26-09 General Construction IFB 26-10 Mechanical Construction IFB 26-11 Electrical Construction IFB 26-12 Total Combined Construction Architect's Name: Shultz + Associates Architects Estimated Price Range (Magnitude of Construction): General Construction: Between $1,000,000 and $5,000,000. Mechanical Construction: Between $1,000,000 and $5,000,000. Electrical Construction: Between $100,000 and $250,000. Total Combined Construction: Between $1,000,000 and $5,000,000. The contractor may use the estimated price range as a tool for estimating bonding or business capacity. An "Estimated Price Range" should NOT be interpreted as an indicator of available funds or as a disclosure of the Government's confidential cost estimate.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.