Active SLED Opportunity · CONNECTICUT · CONNECTICUT AIRPORT AUTHORITY
AI Summary
Contract for removal and disposal of underground fuel oil tank, installation of temporary aboveground tank, and replacement of oil/water separator at Connecticut airport. Completion required within 100 days.
The project consists of: the removal & disposal of one (1) 4,000-gallon single wall fiberglass reinforced concrete underground fuel oil tank in front of the airport terminal building including the installation of a temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal buildings existing boiler system. The project also includes the removal, disposal and replacement of a 1,000-gallon oil/water separator at the airport's maintenance facility. The contract time for completion of all work is within one hundred (100) calendar days from the date specified in the "Notice to Proceed".
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.