Active SLED Opportunity · CALIFORNIA · PLACER COUNTY WATER AGENCY
AI Summary
Construction bid for the Fulweiler to Garfield Pipeline Replacement Project in Auburn, CA, involving installation of ductile iron and PVC water mains, night work, service connections, hydrant and valve installation, and pavement restoration.
Project Description: In accordance with plans and specifications prepared by Hazen and Sawyer, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new water main in Auburn, California. The new main will include 143 linear feet of ductile iron pipe in Fulweiler Avenue, 126 linear feet of ductile iron pipe encased in a 24-inch steel casing through Highway 49, and 1,163 linear feet of PVC pipe down a private alley and in Garfield Street. The work includes nightwork for work within the Caltrans right-of-way, 12 private service connections, installation of a new hydrant, valving, removal and/or abandonment of old pipe, and final pavement.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.