Active SLED Opportunity · CALIFORNIA · CITY OF SIGNAL HILL

    FY 2025-26 Segment A Striping Project

    Issued by City of Signal Hill
    cityRFQCity of Signal HillSol. 141534
    Open · 5d remaining
    DAYS TO CLOSE
    5
    due May 18, 2026
    PUBLISHED
    May 8, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of Signal Hill seeks qualified contractors for FY 2025-26 Segment A Striping Project involving pavement markings and street striping on various street types. Work must comply with Caltrans and California MUTCD standards and be completed within 30 working days after notice to proceed.

    Opportunity details

    Solicitation No.
    141534
    Type / RFx
    RFQ
    Status
    Bidding
    Level
    city
    Published Date
    May 8, 2026
    Due Date
    May 18, 2026
    NAICS Code
    237310AI guide
    Agency
    City of Signal Hill

    Description

    The City of Signal Hill is seeking capable, qualified, and competent contractors to perform pavement markings and striping in Segment A of the City. The scope of work consists of furnishing all labor, materials, equipment, tools and incidentals as required to complete the work.The work to be accomplished under this contract generally includes, but is not limited to the following:• Clean, prepare, and stripe a combination of residential, collector, and arterial streets.• Clean, prepare and paint a variety of pavement marking types.All Work must be completed within thirty (30) working days after receipt by the Contractor of the Notice to Proceed from the City of Signal Hill.Traffic striping shall consist of any and all work required to install replacement pavement striping, paint, thermoplastic, markings, and legends to their original locations.Pavement marking, legends, crosswalk, limit lines, and striping shall conform to the latest provisions of Section 84, “Traffic Stripes and Pavement Markings”, of the Caltrans Standard Specifications and these special provisions.All striping and pavement markings work shall be in accordance with the latest edition of the State of California Department of Transportation Standard Plans and the latest edition of the California MUTCD.The contractor shall furnish the necessary control points for all striping and markings and shall be responsible for the completeness and accuracy thereof to the satisfaction of the Engineer. No striping shall be installed until the layout and spotting has been specifically approved by the City.Payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the quantities noted in the line items section and all related work including layout, spotting, painting two coats, and protecting completed work are considered as included in the Contract price PER UNIT (i.e. LF or EA.).Although the project is considered maintenance work the project will require DIR registration and certified payroll submittals.License requirements and qualifications will be reviewed after receiving proposals by City Staff. Pre-Bid Meeting Information: No Online Q&A: No Location Information: Department: Public Works Address: 2175 E. 28thSignal Hill, California90755 County: Los Angeles License Requirements: C-A or a combination of C31- C33 Other Details: There is no specified preference for materials, but we recommend submitting the materials of choice along with the quote.

    Key dates

    1. May 8, 2026Published
    2. May 18, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.