SLED Opportunity · ILLINOIS · VILLAGE OF SCHAUMBURG
AI Summary
The Village of Schaumburg, IL seeks bids for FY26-27 Utility Construction Materials including brass fittings, pipes, fire hydrants, and related items. Bids due July 13, 2026, via OpenGov portal. Contract term August 1, 2026 to April 30, 2027, with possible extensions. Prevailing wage and performance bonds required.
The Village of Schaumburg, IL will accept sealed bids via the Village's e-Procurement Portal, OpenGov (https://procurement.opengov.com/portal/villageofschaumburg) for 2026-IFB-045, FY26-27 Utility Construction Materials Bid to be received no later than Monday, July 13, 2026, 12:00 pm. Bids submitted after the specified time will not be accepted.
Schaumburg is the largest center of economic development in the State of Illinois, outside the City of Chicago. In addition to the 9.5 million square feet of retail and restaurant space, the village has over 12 million square feet of office space and 13.5 million square feet of industrial space.
With a daytime population of 150,000, thousands of businesses, 30 hotels, over 200 restaurants, highly educated workforce, superb location and high quality of life, Schaumburg is 'The Place for Business’.
The intent of this Invitation for Bid is to enable the Village of Schaumburg's Department of Engineering and Public Works to establish relationships with vendors for FY26-27 Utility Construction Materials Bid.
This Invitation to Bid is open to all vendors actively engaged in supplying goods/services as specified herein. A detailed description of each item/service request is listed in this solicitation.
After the contract award, changes in or additions to the work and/or a change in the amount of money to be paid to the firm must be the result of an approved change order first ordered by the Director of the lead department and approved by the Village Manager and/or the Village Board.
50 ILCS 525/5 require the successful contractor verify any change order request you receive from a subcontractor will not exceed 49% of your original subcontract amount. Any needed change order that will increase the subcontract by 50% or more will require your opening up that portion of the work to competitive Proposal.
The Bidder shall verify all measurements relative to the work, shall be responsible for the correctness of same. The Bidder will examine the site and the premises and satisfy themselves as to the existing conditions under which the Bidder will be obligated to operate. Failure of the Bidder to notify the Village, in writing, of any condition(s) or measurement(s) making it impossible to carry out the work as shown and specified, will be construed as meaning no such conditions exist and no additional moneys will be added to the contract. The successful Bidder must notify all utility companies that are a part of J.U.L.I.E. of the responsibility of each utility company to locate its utilities. The Village will not accept any liability or pay any additional costs in the event any unknown utilities are uncovered which may result in the redesign, delay, or need for additional equipment on the job site.
No claim whatsoever will be allowed to any contract for changes, extra work, or material, not included in the Bidder’s original bid, or for a greater amount of money than the contract states is to be paid, for any reason, including, but not limited to subsurface or latent physical conditions, or unknown physical conditions at the site. The Bidder is responsible for making a full examination of the site of the proposed work, and bid documents, specifications, general conditions, plans, special provisions, and contract forms before submitting their bid. The Bidder is responsible for fully informing themselves as to the quality and quantity of materials required, and the character of the work to be performed.
The Bidder shall supply all required supervision, skilled labor, transportation, new materials, apparatus, and tools necessary for the entire and proper completion of the work. The Bidder shall supply, maintain, and remove all equipment for the performance of the work and be responsible for the safe, proper, and lawful construction, maintenance, and use of the same. This work shall be completed to the satisfaction of the Village. The Bidder shall provide adequate protection of the job site to protect the general public from any injury as a result of the job. The Bidder shall provide all safeguards and suitable barricades to protect public and adjacent property. The Village is not responsible for site safety. The Bidder is solely and exclusively responsible for construction means, methods, technologies, and site safety.
The Bidder will provide certificates of insurance evidencing the following types and limits of insurance. The certificates of insurance will specifically address each of the requirements noted below. Each insurance company shall be acceptable to the Village. The General Liability coverage shall name the Village of Schaumburg as additional insured. All insurance noted below is primary and in no event will be considered contributory to any insurance purchased by the Village. All insurance noted below will not be canceled, reduced, or materially changed without providing the Village thirty (30) days advance notice, via certified mail.
The Bidder will provide written Proof of Endorsement, with the General Liability policy number on the endorsement.
Any and all deductibles or other forms of retention are the responsibility of the Contractor. All deductibles or other forms of retention are subject to the approval of the Village. Contractor will disclose to the Village in writing the amounts of any deductible or self-insured retentions on the insurance required under this contract.
Contractor waives any right of subrogation it may have or later acquire against the Village.
The Bidder shall not commence work under this contract until they have obtained all insurance required under this section and such insurance has been approved by the Village, nor shall Bidder allow any subcontractor to commence work on their subcontract until the same insurance has been obtained by the subcontractor. The Bidder and their subcontractor(s) shall maintain all insurance required under paragraphs A through D of this Section for not less than one (1) year after completion of this contract.
The Village of Schaumburg, IL will accept electronic bids via the Village's e-Procurement Portal, OpenGov (https://procurement.opengov.com/portal/villageofschaumburg) for 2026-IFB-045, FY26-27 Utility Construction Materials Bid.
Specifications and all Contract Documents are available via the Village’s e-Procurement Portal, OpenGov. Prices quoted must be valid for a minimum of 90 days from the date of the bid opening.
Bids will be received until 12:00 pm on Monday, July 13, 2026. All bid tabulations will be made publicly available after submission deadline.
The Village of Schaumburg reserves the right to reject any and all bids or to waive any technicalities, discrepancies, or information in the bids. The Village of Schaumburg does not discriminate in admission, access to, treatment, or employment in its programs and activities.
All questions regarding this Legal Notice and the actual bid specifications shall be submitted in writing through the OpenGov Question/Answer Tab via the Village's e-Procurement portal, on or before, Wednesday, July 8, 2026 by 12:00 pm. Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on the Village's e-Procurement Portal.
Village of Schaumburg
Purchasing Division
The initial term of this contract shall be for one (1) year to begin on award, subject, however, to the right of the Village to cancel and terminate the same at any time by giving a thirty (30) day notice in writing to the contractor. The Village invokes the right to cancel the contract for poor performance, and/or for other issues that the Village deems unacceptable or below the standard specified in the contract. In the event of such cancellation, the Contractor shall be entitled to receive payment for services and work performed, and materials, supplies, and equipment furnished under the terms of the contract prior to the effective date of such cancellation, but will not be entitled to receive any damages on account of such or any further payment whatsoever. Upon normal expiration of the contract, the Contractor shall continue, at the sole option of the Village, to provide services on a month by month basis, under the same terms and conditions, for a period not to exceed four (4) months.
This contract may be renewed for N/A, one (1) year optional extensions. The optional years will automatically renew providing the Village of Schaumburg has not notified the vendor by written notice, not less than ninety (90) days prior to the contract expiration date, of the Village’s intent to re-solicit new bids.
A one-time economic adjustment for labor, material, and equipment costs may be negotiated for each one year extension to the contract after the initial one year contract period. This economic adjustment may not exceed the published local Consumer Price Index (CPI) for the previous twelve month period. The contracted vendor shall be responsible for notifying the Village (by written notice) of any requested increase not less than ninety (90) days prior to expiration of the contract year.
This contract places no obligation on the Village to appropriate funds for this service beyond the initial fiscal year term of the contract and is dependent upon sufficient funds being appropriated each fiscal year by the Village for this work.
Failure to execute the contract shall, at the option of the Village, constitute a breach of the agreement made by acceptance of the proposal, and the Village shall be entitled to forfeiture of the certified check, bank draft, or proposal Bond accompanying the proposal that is required, not as a penalty, but as liquidated damages. In the event of failure of a Proposer to whom an award of contract has been made, to execute the contract and furnish a Performance Bond within ten (10) days after notification of award, such award may be nullified and an award may be made to the next lowest responsive and responsible Proposer approved by the Village.
If requested, the interested Bidder must provide a detailed statement regarding the business and technical organization of the Bidder that is available for the work that is contemplated. Information pertaining to financial resources, experiences of personnel, previously completed projects, plant facilities, and other data may also be required to satisfy the Village of Schaumburg that the Bidder is equipped and prepared to fulfill the Contract should the Contract be awarded to him. The competency and responsibility of Bidders and of their proposed subcontractors will be considered in making awards.
If requested by the Village, the Bidder shall include a complete list of all equipment and manpower available to perform the work intended on the Plans and Specifications. The list of equipment and manpower must prove to the Village that the Bidder is well qualified and able to perform the work, and it shall be taken into consideration in awarding the Contract. The list shall be included with the sealed bid package.
The Village may make such investigations as it deems necessary, and the Bidder shall furnish to the Village under oath, if so required, all such information and data for this purpose as the Village may request. A responsible Bidder is one who meets all of the following requirements:
If the Bidder possesses a current Illinois Department of Transportation “Certificate of Eligibility” with an amount for the work specified at least equal to the minimum amount of qualification indicated on the Legal Notice or as described within the Contract Documents, they may choose to provide the Village a copy of the certificate in lieu of providing the above mentioned Bidders Qualification requirements.
Intent: The intent of this Invitation for Bid is to solicit firm prices for Utility Construction Materials. The Village of Schaumburg (hereafter Village) Department of Engineering & Public Works will utilize the materials for repairs and maintenance of Village owned utilities.
Basic Requirements: A detailed description of each item requested is listed below, with approximate quantities indicated on the Bid Sheet. In many cases, brand names have been specified. Contractors who wish to submit material they consider to be an “equal” alternative to material specified shall do so utilizing the Detail Exceptions Sheet provided. Clearly mark the item number and include the name of the material for which it is to be substituted, a complete description of the proposed alternate, performance data, test data, and any other information necessary for evaluation. The burden of proof of the merit of the proposed alternative is upon the Bidder. The Village will base its decision on the evaluation of the proposed alternative during the review of all bids submitted. The Village’s approval or disapproval of the proposed alternate shall be final.
Toxic Substance: Prior to delivery of any material that is caustic, corrosive, flammable, or dangerous to handle, the supplier shall provide written directions as to methods of handling such products, as well as the antidote or neutralizing material required for its first aid before delivery (Materials Safety Data Sheet). All material delivered must indicate a Hazardous Materials Warning Label, with the appropriate UN/NA identification number affixed. As specified by federal regulations, the proper HMIS and NFPA labels must also be affixed. All Bidders must comply with the requirements of the Toxic Substance Disclosure to Employees Act for any materials supplied and covered by said Act.
Terms of Contract: This contract will be awarded as a contract commencing on August 1, 2026, and shall be in full force and effect to and including April 30, 2027 subject, however, to the right of the Village to cancel and terminate the same at any time by giving a thirty (30) day notice in writing to the contractor. The Village invokes the right to cancel the contract for poor performance, and/or for other issues that the Village deems unacceptable or below the standard specified in the contract. In the event of such cancellation, the Contractor shall be entitled to receive payment for services and work performed, and materials, supplies, and equipment furnished under the terms of the contract prior to the effective date of such cancellation, but will not be entitled to receive any damages on account of such or any further payment whatsoever. Upon normal expiration of the contract, the Contractor shall continue, at the sole option of the Village, to provide services on a month-by-month basis, under the same terms and conditions, for a period not to exceed four (4) months.
This contract places no obligation on the Village to appropriate funds for this service beyond the initial fiscal year term of the contract and is dependent upon sufficient funds being appropriated each fiscal year by the Village for this work.
Bid Evaluation and Award: Bids shall be compared and awarded on the basis of individual prices bid for each item as listed on the Bid Sheet, with a not-to-exceed amount as approved in the fiscal year budget. As material is needed, the successful Bidder(s) will receive a purchase order from the Village. The purchase order number shall be referred to when invoicing for materials received by the Village.
Right to Change Quantities/Services: Quantities listed are approximate only. Due to budget restrictions, the Village reserves the right to increase or decrease quantities listed to meet approved budget funding. No adjustments in contract unit prices or additional compensation will be made for decreases in the quantities from the contract.
Exceptions: All exceptions to the specifications must be noted on the Detailed Exception Sheet provided with this bid document and must be included with the bid submittal.
Delivery: Successful Bidders shall maintain bid materials at their place of business providing shipment and billing for said materials as ordered by the Village. All materials ordered by the Village must be F.O.B., within forty-five (45) days after receiving an order; said order being mailed from the Village. Time is of the essence. If delivery is made by truck, arrangements must be made in advance by the contractor in order that the Village may arrange for receipt of the materials. The materials must then be delivered where directed. Truck deliveries will be accepted between 7:00 a.m. and 3:00 p.m. on weekdays only. No deliveries will be accepted on Saturdays, Sundays, or holidays.
Mandatory Brass Requirements:
GENERAL:
All brass valves and fittings for service lines shall be provided under this contract.
PRODUCT:
QUALITY CONTROL AND TESTING:
If requested, an affidavit certifying compliance with these standards and specifications shall be signed and submitted by the manufacturing firm’s Quality Assurance or Engineering Manager.
Materials may be tested by the Village for compliance with the Illinois Department of Transportation or Village specifications. All material must pass before any payments will be authorized.
All materials must be made in the U.S.A.
NOTE: Bidders only bid on those items that they can supply. Not bidding on a specific item (or items) will not disqualify the bid. Bids will be compared on the basis of the unit price bid for each item. Each bid item and item group will be compared separately.
Items #1 - #4
Manhole Adjusting Rings: All concrete rings shall conform to ASTM C-478, shall be wire reinforced per ASTM A-185, and shall be smooth on all sides. All rings greater than 3" thick shall have lifting rings.
Items #5 - #6
Rubber Manhole Adjusting Rings: Flex-O-Ring type recycled rubber manhole adjusting rings with a minimum two-year warranty. Rings shall meet IDOT standards.
Items #7 - #12
HDPE Manhole Adjusting Rings: HDPE plastic manhole adjusting rings conforming to the requirements of HS26 of the AASHTO Standard Specifications and ASTM D1248-84. All adjusting rings shall be stabilized against ultraviolet light.
Items #13 - #14
Precast Concrete Inlet Barrel Sections: All items shall conform to IDOT 30” O.D. X 24” I.D. Type “A” inlet and ASTM C-478 shall be wire reinforced per ASTM A-185 and shall have lifting rings.
Items #15 - #17
Sewer Service Saddle: Cascade brand stainless-steel series CSWRT sewer saddle – tee for clay, cement, and Insituform pipe. Saddle shall be a two-piece construction and comply with NSF/ANSI 61.
Item #18
Anti-Hydro: Anti-Hydro (compound added to Portland Cement to harden concrete) as manufactured by Anti-Hydro Company, Inc., 265 Badger Avenue, Newark, New Jersey, in 5-gallon drum containers. Note: Speed plug, water plug, and similar products are not acceptable.
Items #19 - #22
PVC Sewer Pipe-SDR 26: PVC pipe conforming to ASTM D-3034, SDR 26, with ASTM D-1869 joints for use as sanitary sewer pipe.
Item #23
Root-X: Root-X brand sanitary sewer pipeline root control treatment. Four (4) pound container.
Items #24 - #27
Neenah Construction Castings: Neenah Foundry brand construction castings.
Items #28 - #33
Maxadaptor Couplings: Maxadaptor by Gripper Gasket, non-shear couplings for joining dissimilar types of sanitary sewer pipe.
Items #34 - #39
Water Main Repair Clamps: Cascade brand, all stainless steel, single bolt CR1, repair clamps with stainless steel nuts and bolts for repairing potable water main.
Items #40, #42, #44, #46
Mueller Fire Hydrant With Valve Assembly and Fire Hydrant Extension: Mueller A-423 fire hydrant with 5'6" bury and complete valve assembly attached. The hydrant’s lower stem shall be constructed of stainless steel. Fire hydrant extension shall be Mueller A320 extensions for Mueller A-423 hydrant.
Item #41, #43, #45, #47
Clow F-2545 Fire Hydrant With Valve Assembly and Fire Hydrant Extension: Clow Medallion F-2545 fire hydrant with 5'6" bury and complete valve assembly attached. The hydrant’s lower stem shall be constructed of stainless steel. Fire hydrant extensions shall be Clow extensions for Clow F-2545 hydrants.
Item #48
Mueller B-Box: B-box #H-10302, 6 ft. extended length.
Item #49
AY McDonald B-Box: B-box #5622, 6 ft. extended length.
Item #50
Mueller Coupling: ¾" coupling #H-15403N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #51
AY McDonald Coupling: ¾" coupling #74758Q. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Item #52
Mueller Coupling: 1” coupling #H-15403N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #53
AY McDonald Coupling: 1” coupling #74758Q. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #54
Mueller Curb Stop: ¾" curb stop #B-25155N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #55
AY McDonald Curb Stop: ¾" curb stop #76104Q. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #56
Mueller Curb Stop: 1" curb stop # B-25155N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest
requirements of the Federal Safe Drinking Water Act.
Item #57
AY McDonald Curb Stop: 1" curb stop #76104Q. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Item #58
Mueller Corporation: ¾” corporation #B-25008N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Item #59
AY McDonald Corporation: ¾” corporation #74701BQ. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Item #60
Mueller Corporation: 1" corporation # B-25008N. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Item #61
AY McDonald Corporation: 1" corporation #74701BQ. All service brass will comply with AWWA C-800. Components in contact with potable water will also comply with the latest requirements of the Federal Safe Drinking Water Act.
Items #62 - #71
Smith Blair Repair Sleeve with Tap: #265 tapped full circle repair clamp all stainless steel, fabricated lugs, double banded water service saddle for ¾" and 1” tap for 4”, 6”, 8", 10” or 12” pipe. All sleeves shall be 15 inches in length.
Items #72, #74, #76, #78
Clow Gate Valves: 6” – 12” Model - 2638 Valve: MJ x MJ ends
Items #73, #75, #77, #79
Mueller Gate Valves: 6” – 12” Model – A2361-23 RWGV: MJ x MJ ends
Item #80
Fire Hydrant marking Sign: 6" x 12" .080 aluminum blanks screened with 3M Brand Hi-Intensity sheeting with a clear coat to prevent sun fading. Logo to be a red fire hydrant and boarder per attached drawing (Attachment “A”). Sign shall have bolt holes at top and bottom center. Bolt holes shall be ¾ inch diameter and 10" apart center to center. The manufacturer’s 10-year warranty shall be included.
Item #81
Water Main Anode: 20-year Sacrificial anode, with attached copper wire and clamps for connection to a 4" through 12" ductile iron water main.
Item #82
Valve Box Stabilizer: Plastic valve box stabilizer - 12" length.
Item #83
Storm Inlet Frame/Grate: East Jordan brand #7210 frame and grate with “DUMP NO WASTE - DRAINS TO RIVER” cast in the top of the frame.
Item #84
Drainage Pipe 6": Flexible, perforated, fabric-wrapped 6" PVC drainage pipe. Pipe shall come in 50' or 100' sections.
Item #85
PVC Tee - 6" x 6" x 6": Thick-walled 6" x 6" x 6" PVC Tee – SRD 26 with specifications matching Item #15.
Item #86
PVC 6" x 11 ¼º Elbow: Thick-walled PVC 6" x 11¼º elbow - SDR 26 with specifications matching Item #15.
Items #87 – #89
HDPE Pipe: ADS brand HDPE N-12 prolink ultra pipe, type “S” per AASHTO M294 with ASTM F477 rubber gasket joint. All material shall meet the latest standards of the Village of Schaumburg’s Subdivision Control Ordinance #1639.
Item #90
Type 2 Wood Barricade: Type 2 wood barricade. Panels shall be ½" plywood covered with reflective orange and white sheeting for use at night. Legs shall be painted steel.
shall meet IDOT standards for use on streets over 40 mph.
Item #91
Seven Foot Sign Posts: 7 foot, #2, galvanized, “U” posts.
After the contract award, changes in or additions to the work and/or a change in the amount of money to be paid to the Bidder must be the result of an approved change order first ordered by the Director of the lead department and approved by the Village Manager and/or the Village Board.
50 ILCS 525/5 require the successful contractor verify any change order request you receive from a subcontractor will not exceed 49% of your original subcontract amount. Any needed change order that will increase the subcontract by 50% or more will require your opening up that portion of the work to competitive bidding.
Any reference in these specifications to manufacturer’s name, trade name, or catalog number (unless otherwise specified) is intended as a standard only. The Village’s written decision of approval or disapproval of a proposed substitution shall be final.
Alternate bids will be considered only if received at the time stated for receipt of the bids. Bidders are cautioned that, if an alternate bid(s) involves an increase in the Bid Sum, the Bid Deposit, if required, shall be ample or be increased to cover the alternate Bid Sum or the entire bid may be rejected.
The Contractor shall submit with each payment request the Certified Payroll case file number and Contractor’s Partial Waiver of Lien for the full amount of the requested payment. All invoices must include the PO number associated with the order and shall be submitted to the Village of Schaumburg, Accounts Payable Division, 101 Schaumburg Court, Schaumburg, IL 60193. The Contractor’s request for final payment shall include the Contractor’s Certified Payroll case file number and Final Waiver of Lien which shall be for the full amount of his contract, including any change orders thereto, and Final Waivers of Lien from all subcontractors and suppliers for which Final Waivers of Lien have not previously been submitted. Failure to submit Certified Payroll case file numbers and Waivers of Lien as specified may result in a delay of invoice payment
Each proposal shall be accompanied by a proposal security in the amount of 10% of the total amount proposal. proposal security shall be in the form of a certified check or cashier’s check, drawn on a responsible bank doing business in the United States and made payable to the Village of Schaumburg, or a proposal Bond by a surety company which is satisfactory to the Village and is qualified to do business in Illinois.
Electronic copies are acceptable for submission, with the original being submitted no later than Monday, July 13, 2026, 12:00 pm to:
Village of Schaumburg
Purchasing Division
Atcher Municipal Center
101 Schaumburg Ct
Schaumburg, IL 60193
Electronically produced proposal security, with digital signature and notary stamp, will be acceptable. proposals not accompanied by a proposal security will be rejected. The proposal security of the unsuccessful Proposers (if in the form of a certified check or cashier’s check) will be returned after the contract is awarded, or earlier, if the Village does not deem it necessary to retain the proposal Security. The proposal security of the accepted Proposer, (if in the form of a certified check or cashier’s check) will be returned either upon execution of a contract and submittal of a performance bond, if required by the specifications or, where no performance bond is required, when, in the Village’s estimation, the contract has been satisfactorily completed. When the proposal security is submitted in the form of a proposal bond, the bond will become null and void following the award of contract and the Village’s receipt of the Performance Bond, if required by the specifications. Should the Proposer fail to fulfill the contract as set forth, the proposal security shall become payable to the Village as liquidated damages.
Each request for interpretation of the Contract Documents shall be made in writing through the OpenGov Question/Answer Tab via the District's e-Procurement portal, on or before, Wednesday, July 8, 2026 by 12:00 pm. Interpretations and supplemental instructions will be electronically distributed to bidders following this solicitation on the Village’s e-Procurement Portal.
The successful firm shall furnish as performance security a Performance Bond acceptable to the Village prior to the start of any work. The bond shall be in the sum of 100% of the contract amount. The performance bond shall: 1) serve as security for faithful performance of the work; and 2) guarantee the work against defective workmanship and material for a period of not less than one (1) year following acceptance of the work. The Labor and Material Bond shall serve as security that all wages are paid and materials provided for the work are paid by the successful firm. For contract awards that are less than $100,000.00, a Letter of Credit, in a form suitable to the Village, may be submitted as performance security, instead of a Performance Bond.
Each bid shall be accompanied by a bid security in the amount of 10% of the total amount bid. Bid security shall be in the form of a certified check or cashier’s check, drawn on a responsible bank doing business in the United States and made payable to the Village of Schaumburg, or a Bid Bond by a surety company which is satisfactory to the Village and is qualified to do business in Illinois.
Electronic copies are acceptable for submission, with the original being submitted no later than Monday, July 13, 2026, 12:00 pm to:
Village of Schaumburg
Purchasing Division
Atcher Municipal Center
101 Schaumburg Ct
Schaumburg, IL 60193
Electronically produced bid security, with digital signature and notary stamp, will be acceptable. Bids not accompanied by a bid security will be rejected. The bid security of the unsuccessful Bidders (if in the form of a certified check or cashier’s check) will be returned after the contract is awarded, or earlier, if the Village does not deem it necessary to retain the Bid Security. The bid security of the accepted Bidder, (if in the form of a certified check or cashier’s check) will be returned either upon execution of a contract and submittal of a performance bond, if required by the specifications, or where no performance bond is required, when, in the Village’s estimation, the contract has been satisfactorily completed. When the bid security is submitted in the form of a bid bond, the bond will become null and void following the award of contract and the Village’s receipt of the Performance Bond, if required by the specifications. Should the Bidder fail to fulfill the contract as set forth, the bid security shall become payable to the Village as liquidated damages.
Bidders intending to respond to this opportunity must create a FREE account with OpenGov by signing up at https://procurement.opengov.com/signup. This step is necessary to establish a communication link with the Village. The Bidder, not the Village, is responsible for obtaining any addenda to the original specification. Addenda and other relevant information will be posted on the Village’s e-Procurement Portal. Addenda notifications will be emailed to all persons on record as following this ITB. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents.
Bids may be withdrawn through the Village's e-Procurement Portal, the responding firm may “unsubmit” their proposal in OpenGov. After withdrawing a previously submitted proposal, the responding firm may submit another proposal at any time up to the deadline for submitting proposals prior to the bid opening. Bidders may withdraw or cancel their bid, in written form, at any time prior to the advertised bid opening time.
The successful Bidder shall furnish as performance security a Performance Bond acceptable to the Village prior to the start of any work. The bond shall be in the sum of 100% of the contract amount. The performance bond shall: 1) serve as security for faithful performance of the work; and 2) guarantee the work against defective workmanship and material for a period of not less than one (1) year following acceptance of the work. For contract awards that are less than $100,000.00, a Letter of Credit, in a form suitable to the Village, may be submitted as performance security, instead of a Performance Bond.
Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy of the premises by the Village, shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects in the work and pay for any damage to other work resulting therefrom, which shall appear within a period of 1 year from the date of final acceptance of the work unless a longer period is specified. The Village will give notice of observed defects with reasonable promptness. The Contractor shall guarantee all materials and workmanship as defined by the Performance Bond.
Unless otherwise amended in writing by the Director of Engineering and Public Works, the date of the Start of any Guarantees, Warranties, and Maintenance Bonds shall be coincident with the Date of Acceptance of the entire project.
Where applicable, a Waiver of Lien and Contractor’s Affidavit must be submitted by the firm, verifying that all subcontractors and material invoices have been paid prior to the Village approving final payment.
The Village reserves the right to terminate the whole or any part of this Contract, upon written notice to the Contractor, in the event that sufficient funds to complete the Contract are not appropriated by the Board of Trustees of the Village.
The Village further reserves the right to terminate the whole or any part of this Contract, upon written notice to the Contractor, in the event of default by the Contractor, in accordance with section 108.10 of the Standard Specifications.
Default is defined as failure of the Contractor to perform any of the provisions of this Contract, or failure to make sufficient progress so as to endanger performance of this Contract in accordance with its terms. In the event of default and termination, the Village may procure, upon such terms and in such manner as the Village may deem appropriate, supplies or services similar to those so terminated. The Contractor shall be liable for any excess costs for such similar supplies or service unless acceptable evidence is submitted to the Village that failure to perform the Contract was due to causes beyond the control and without the fault or negligence of the Contractor.
The Village reserves the right to reject any or all bids and/or to waive any irregularities or disregard any informality in the bids and bidding when, in its opinion, the best interest of the Village will be served by such action. Furthermore, the Village reserves the right to award each item to a different Bidder, or all items to a single Bidder unless otherwise noted on in this solicitation. The Village may determine as follows: 1) an equal or alternative is a satisfactory substitute; 2) an early delivery date is entitled to more consideration than price; 3) an early delivery date is to be disregarded because of the reputation of the Bidder for not meeting delivery dates; 4) a Bidder is not a responsible Bidder; and 5) what exceptions or deviations from written specifications will be accepted.
No bid will be accepted from or contract awarded to any person, firm, or corporation that is in arrears or is in default to the Village upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to the Village, or had failed to perform faithfully any previous contract with the Village.
The Contractor shall notify the Engineer or project manager forty-eight (48) hours prior to commencement of work and twenty-four (24) hours prior to each inspection.
The Bidder’s submittal shall include all required Documents and any further specified documentation as pertaining to this solicitation. The Village will strictly hold the Bidder to the terms of the bid. The bid must be executed by a person having the legal right and authority to bind the Bidder.
Following the bid opening, bid tabulations will be posted on the Village’s e-Procurement Portal. Bid tabulations posted on-line represent “as read” submittals at time of the bid opening. They do not represent contract award. Final awards will be posted when approved.
The Village shall obtain all the necessary permits to facilitate construction of the project, unless otherwise specified in the Contract Documents. The Contractor shall comply with all requirements of the necessary permits for the project.
Where applicable, all materials shipped to the Village must be shipped F.O.B. delivered, designated location, Schaumburg, Illinois. If the delivery is made by truck, arrangements must be made in advance by the Bidder, with concurrence by the Village, for receipt of the materials. The materials must be delivered where directed. Truck deliveries will be accepted at the Public Works Facility between 7:00 a.m. and 3:30 p.m. and at all other Village locations 8:00 a.m. and 4:00 p.m., weekdays only.
NOTE: The Public Works Facility does have a raised loading dock. All other Village locations do not have access to a raised loading dock. Deliveries requiring removal from the delivery truck via a forklift provided by the Village must be arranged with the Village twenty-four (24) hours in advance of the expected delivery date.
During construction, the Contractor and their subcontractors shall remove from the premises, rubbish, waste material, and accumulations, and shall keep the premises clean. The Contractor shall keep the premises clean during construction to the satisfaction of the Engineer.
No fire hydrants shall be used to obtain water for non-emergency use. Water can be purchased and obtained at the Village of Schaumburg Public Works Building, 714 S. Plum Grove Road.
Not less than the Prevailing Wages as found by the Illinois Department of Labor (IDOL) or determined by the court on review shall be paid to laborers, workmen, and mechanics performing work under this contract. Current standards are available on the Illinois Department of Labor website at www.state.il.us/agency/idol/ (820 ILCS 130/1 et. seq.) (Wages of employees on Public Works – Prevailing Wage Act, Illinois Revised Statutes, Chapter 48, Section 39S-1 et seq.) Contractors are responsible for paying prevailing wage, when required, based on the most current IDOL standards, throughout the term of the contract.
In 2018, the Illinois General Assembly passed legislation to make changes to the certified payroll portion of the Prevailing Wage Act. When Governor Pritzker took office in 2019, SB 203 was signed into law (PA 100-1177). Prior to the law, certified payrolls were submitted to the local or state public body funding the project. Under the new law, the Illinois Department of Labor is charged with developing and maintaining an online portal where all prevailing wage construction contractors file their certified payrolls with the department, otherwise known as Certified Transcript of Payroll portal.
820 ILCS 265/15 requires the successful contractor, before work commences, to file with the Public Body certification that they have a substance-abuse program and provide drug testing.
Payment shall be made within 30 days of invoice receipt and approval, unless otherwise specified in the agreed upon contract. All invoices must include the PO number associated with the order and shall be submitted to the Village of Schaumburg, Accounts Payable Division, 101 Schaumburg Court, Schaumburg, IL 60193. If prevailing wage is a requirement of the contract, the invoice must include IDOL filing certificate and waivers. Failure to submit all documentation as specified may result in delay of invoice payment.
The Bidder shall, without regard to the availability or unavailability of any insurance either of the Village or the Bidder, indemnify and save harmless, the Village, its officials, and its employees, against any and all damages, liabilities, losses, and expenses, including reasonable attorneys’ fees and administrative expenses recoverable under applicable law, to the extent arising, out of or caused by, the Bidder’s negligent or wrongful acts or omissions in the performance of, or failure to perform, the Services or any part thereof, except to the extent caused by the negligence of the Village.
* Special Requirement: If the Bidder is an architectural firm or engineering firm, said Bidder shall file a certificate of insurance for professional liability, errors and omissions coverage subject to final acceptance by the Village of said coverage.
Please provide the following information for each person(s) authorized to submit a response on behalf of your organization:
Name
Title
Phone Number
Email Address
EQUAL EMPLOYMENT OPPORTUNITY CLAUSE required by the Illinois Fair Employment Practices Commission as a material term of all public contracts.
During the performance of this contract, the contractor agrees as follows:
The Village of Schaumburg does not discriminate on the basis of disability status in admission or access to, or treatment or employment in, its programs and activities.
Please provide any proposed substitution to the specifications in this solictation for consideration by the Village of Schaumburg. If you will not be requesting any alternates, please provide a document stating that.
Each bid shall be accompanied by a certified cashier’s check, or bid bond, in the amount of ten percent (10%) of the total bid price, payable to Village of Schaumburg, Illinois, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement.
Please upload a copy of your bid bond/cashier's check. Bidder must also submit an original copy of the bid guarantee to be received no later thanMonday, July 13, 2026 addressed to:
Village of Schaumburg
Purchasing Division
Jillian Ostman
1000 Woodfied Rd
Schaumburg, IL 60173
Please have the Bidder Name, Contract Title ("FY26-27 Utility Construction Materials Bid"), and Contract Number ("2026-IFB-045") listed clearly on the outside of the envelope.
The successful Bidder shall furnish as performance security a Performance Bond acceptable to the Village prior to the start of any work. Each of the bonds shall be in the sum of 100% of the contract amount. The performance bond shall: 1) serve as security for faithful performance of the work; and 2) guarantee the work against defective workmanship and material for a period of not less than one (1) year following acceptance of the work. For contract awards that are less than $100,000.00, a Letter of Credit, in a form suitable to the Village, may be submitted as performance security, instead of a Performance Bond.
By submitting a response to this solicitation, the authorized person(s), confirms having examined the specifications and all conditions affecting the specified project, offer to furnish all services, labor, and incidentals specified for the price as provided with their response.
The Bidder certifies that they are not barred from bidding on this contract as a result of a conviction for the violation of state laws prohibiting bid rigging or bid rotating, (720ILCS 5/33E-1, et seq.) and is not delinquent in any taxes to the Illinois Department of Revenue. (65ILCS 5/11-42.1-1)
It is understood that the Village reserves the right to reject any and all bids and to waive any irregularities and that the prices contained herein will remain valid for a period of not less than sixty (60) days.
The bidder proposes to complete the following project as more fully described in the specifications for the following: in this solicitation document.
The Bidder hereby agrees to protect, defend, indemnify, and save harmless the Village against loss, damage, or expense from any suit, claim, demand, judgment, cause of action, or shortage initiated by any person whatsoever, arising or alleged to have arisen out of work described herein, except that in no instance shall the Bidder be held responsible for any liability, claim, demand, or cause of action attributable solely to the negligence of the Village.
By submitting a response to this solicitation, the bidder hereby certifies that the item(s) proposed is/are in accordance with the specifications as noted and that the prices quoted are not subject to change; and that on behalf of the organization, is not barred by law from submitting a bid to the Village for the project contemplated herein because of a conviction for prior violations of either Illinois Compiled Statutes, 720 ILCS 5/33E-3 (Bid Rigging) or 720 ILCS 5/33-4 (Bid Rotating).
By submitting a response to this solicitation, the bidder hereby certifies that the item(s) proposed is/are in accordance with the specifications as noted and that the prices quoted are not subject to change; and that on behalf of the organization, is not delinquent in payment of any taxes to the Illinois Department of Revenue in accordance with 65 ILCS 5/11-42.1.
By submitting a response to this solicitation, the bidder hereby certifies that the item(s) proposed is/are in accordance with the specifications as noted and that the prices quoted are not subject to change; and that on behalf of the organization, provides a drug free workplace pursuant 30 ILCS 580/1, et seq.
By submitting a response to this solicitation, the bidder hereby certifies that the item(s) proposed is/are in accordance with the specifications as noted and that the prices quoted are not subject to change; and that on behalf of the organization, certifies they have a substance-abuse program and provide drug testing in accordance with 820 ILCS 265/1 et. seq., Public Act 095-0635
By submitting a response to this solicitation, the bidder hereby certifies that the item(s) proposed is/are in accordance with the specifications as noted and that the prices quoted are not subject to change; and that on behalf of the organization, is in compliance with the Illinois Human Rights Act 775 ILCS 5/1.101, et seq. including establishment and maintenance of sexual harassment policies and program.
Any exceptions must be clearly noted on the Detail Exceptions Sheet(s). Failure to do so may be reason for rejection of the bid. It is not our intention to prohibit any potential Bidder from bidding by virtue of the specifications, but to describe the material and services actually required. The Village reserves the right to accept or reject any or all exceptions.
DETAIL EXCEPTIONS SHEET MUST BE SUBMITTED WITH THE BID RESPONSE.
Please download the below documents, complete, and upload.
Project Name: _______________________
Year Completed: _____________________
Location and Agency: _________________
Contact Person Name and Number: _____
Will alternates be permitted for this project?
Does this project require Prevailing Wage?
Will this project require an architectural or engineering firm to bid?
Is this a Construction Bid?
Is this an Engineering Bid?
If you Require A Bid Security, Select Options 1, 3, 4 and 5
If you Require A Performance Security Select Option 2, 3 and 4
If your project does not require any of the below options, please leave this question blank.
What is the initial term of the contract resulting from this solicitation?
Use the following format: one (1) year
Will the contract resulting from this solicitation have contract extensions available?
Please provide the contract extension term.
Use the following format: three (3)
If no extensions are permitted, please type "N/A".
Will subcontractors be permitted on this project?
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.