SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Water main replacement project on Glenhaven Avenue, MA, involving installation of 2,700 linear feet of water pipes, hydrants, trench paving, and a temporary water bypass system.
The water main improvements involve installing approximately 2,700 linear feet of 8" and 6" water pipes, water services, hydrants, 8"x8" tapping sleeve valve, temporary and permanent trench paving, temporary water bypass system and abandoning the existing water main on Glenhaven Avenue.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.