SLED Opportunity · NEW YORK · NEW YORK
AI Summary
Construction of a wastewater pump station at Griffiss International Airport, including MECH/HVAC and plumbing systems, driveway and utility connections, and parking lot renovation. SDVOB and MWBE participation goals apply.
The project consists of (2) prime contracts MECH/HVAC and Plumbing. This project generally includes the construction of a new wastewater pump station designed to serve the new triangle site development at Griffiss International Airport in Rome, NY. This pump station will feed a force main already installed along perimeter road to transport wastewater from the triangle site to the Rome Wastewater Treatment plant. This includes the pump station building, subgrade wet and dry well structure, wastewater pumping system and controls, and all electrical, mechanical, and plumbing systems associated with regular pump station operation. A new driveway and utilities connecting the pump station to the mains along perimeter road, as well as a renovation of the parking lot adjacent to the baseball fields are included. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00%
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.