SLED Opportunity · FLORIDA · CITY OF CLEARWATER
AI Summary
City of Clearwater seeks bids for replacement of floating wave attenuators, dock utilities repair, and hurricane damage restoration at Harbor Marina.
The scope of this project includes the replacement of 4 floating wave attenuators on the marginal wharf and A-Dock, one finger pier, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators.
The wave attenuators will be replaced by 3 13-foot-wide wave attenuators in the orientation presented on the drawings. Due to the alignment and size of floating docks to be removed and anticipated to be replaced with, a small gangway is needed to bridge the gap between the new and existing attenuators on A-Dock. Also, a new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf.
The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators.
Additionally, the contractor shall replace the transition plates at the south end of A-Dock from the previous attenuator replacement that were damaged during Hurricane Helene, as well as fixing the pile sleeves that were also damaged during the hurricane.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.