SLED Opportunity · CALIFORNIA · COUNTY OF LOS ANGELES
AI Summary
The County of Los Angeles is seeking bids for the Harbor-UCLA Medical Center Generator Building Retrofit Project, which involves modernizing electrical infrastructure for reliable emergency power. The project includes installing new switchgear, seismic upgrades, and fuel tanks, with strict compliance and operational continuity requirements. Interested bidders can find more details at the provided link.
This RFP may be downloaded at the following link: https://dpw.lacounty.gov/contracts/aed_bid/ProjectDetail.aspx?project_id=BRC0000569 The Generator Building Retrofit Project at Harbor-UCLA Medical Center involves the replacement and modernization of the existing generator switchgear and associated electrical infrastructure to ensure reliable emergency power distribution for the new Inpatient Tower (IPT) and Central Utility Plant (CUP). The project is a multi-increment, multi-phase HCAI-regulated construction effort, requiring careful shutdown coordination, phased implementation, and compliance with incremental Temporary Interim Occupancy (TIO) approvals. Scope includes, but limited to, installation of new 12kV switchgear, conduit and ductbank infrastructure, seismic upgrades, and system commissioning, with stringent requirements for continuity of hospital operations, impact mitigation, and regulatory compliance. The 12KV Switchgear and associated SEL relays and controllers as noted on the drawings are Owner Furnished-Contractor Installed. The project also includes the installation of two new fuel tanks to meet the HCAI NPC-5 requirements. More
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.