Active SLED Opportunity · IOWA · IOWA
AI Summary
Removal of unstable bedrock fragments and talus at Harmon Tunnel highwalls using manual, mechanical, or chemical non-explosive methods. Experienced personnel required. Bids due June 25, 2026.
"This work includes the removal of loose or potentially unstable disjointed spalled/ exfoliated bedrock fragments and talus above/ around both tunnel portal highwalls (within the zone of influence as depicted in the Drawings) by manual, mechanical or chemical (non-explosive) methods. Includes removal and disposal of all spoil resulting from the highwall scaling operation and all loose material located in the area between the 'zone of influence' and the tunnel pavement. Blasting is not permitted. Each rock slope scaling foreman and all personnel conducting work or activities related to scaling operations shall have performed satisfactory work on three similar projects within the last five years. All personnel must have a minimum of two years of full-time experience in rock slope stabilization that includes rock scaling." Please see the plans and bid package as noted below. Bid Closing Date and Time: 6/25/2026 at 3:00 PM. Bids must be submitted electronically as directed in the General Information and Instructions to Bidders.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.