Active SLED Opportunity · OKLAHOMA · CITY OF ENID

    Hayes Elementary Sidewalks ADA Transition Plan Compliance

    Issued by City of Enid
    cityITBCity of EnidSol. 8716364310
    Open · 15d remaining
    DAYS TO CLOSE
    15
    due May 8, 2026
    PUBLISHED
    Apr 10, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of Enid seeks bids for ADA compliance upgrades to Hayes Elementary sidewalks, including concrete work, site prep, and related construction services. Formal ITB with pre-bid conference and electronic/physical bid submission.

    Opportunity details

    Solicitation No.
    8716364310
    Type / RFx
    ITB
    Status
    Active
    Level
    city
    Published Date
    April 10, 2026
    Due Date
    May 8, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    City of Enid
    Agency
    City of Enid

    Description

    This reoccuring project provides for the accessibility imporvments set out by Court Order and are identified in the ADA Transition Plan. The specific project will be identified based on the ADA access Board's recommendations and City Commission approval. This year's project will provide for ADA upgrades to the Hayes Elementary Sidewalks. **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1158120.C16639226 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/24/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic or Physical Bid Submission **Owner Organization**: City of Enid **Reference Number**: 0000420154 **Pricing**: Item Based **Bid Documents List**: | Question Name | Question Description | Mandatory | |---|---|---| | Calendar Days | Please enter in your calendar days. | Yes | **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/22/2026 11:00 AM EDT | Location: Conference Room B & via Zoom | Event Note: Topic: Pre-Bid: M-2604C Hayes Sidewalks ADA Time: Apr 22, 2026 10:00 AM Central Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/84716843619?pwd=NT6d3hadHOaCnLww0Xz9PBWJtYTcgl.1 Meeting ID: 847 1684 3619 Passcode: 171259 **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---| | Next Base Bid Next M-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds and Insurance Lump-Sum 1 3 Clearing and Grubbing Lump-Sum 1 4 Construction Project Sign Each 1 5 6" Portland Cement Concrete Driveways Complete in Place Square Yard 607 6 Removal of Existing Driveways Square Yard 607 7 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 1450 8 Removal of Existing Sidewalks including pavers Square Yard 51 9 Steel Truncated Domes (5x2) Square Foot/Feet 130 10 Remove and reset signs Each 10 11 Tree removal Each 1 12 Solid slab sodding Square Yard 1140 13 Water meter relocation Each 16 | Next M-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds and Insurance Lump-Sum 1 3 Clearing and Grubbing Lump-Sum 1 4 Construction Project Sign Each 1 5 6" Portland Cement Concrete Driveways Complete in Place Square Yard 607 6 Removal of Existing Driveways Square Yard 607 7 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 1450 8 Removal of Existing Sidewalks including pavers Square Yard 51 9 Steel Truncated Domes (5x2) Square Foot/Feet 130 10 Remove and reset signs Each 10 11 Tree removal Each 1 12 Solid slab sodding Square Yard 1140 13 Water meter relocation Each 16 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds and Insurance | Lump-Sum | 1 | 3 | Clearing and Grubbing | Lump-Sum | 1 | 4 | Construction Project Sign | Each | 1 | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | 6 | Removal of Existing Driveways | Square Yard | 607 | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | 10 | Remove and reset signs | Each | 10 | 11 | Tree removal | Each | 1 | 12 | Solid slab sodding | Square Yard | 1140 | 13 | Water meter relocation | Each | 16 | | | | Next M-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds and Insurance Lump-Sum 1 3 Clearing and Grubbing Lump-Sum 1 4 Construction Project Sign Each 1 5 6" Portland Cement Concrete Driveways Complete in Place Square Yard 607 6 Removal of Existing Driveways Square Yard 607 7 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 1450 8 Removal of Existing Sidewalks including pavers Square Yard 51 9 Steel Truncated Domes (5x2) Square Foot/Feet 130 10 Remove and reset signs Each 10 11 Tree removal Each 1 12 Solid slab sodding Square Yard 1140 13 Water meter relocation Each 16 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds and Insurance | Lump-Sum | 1 | 3 | Clearing and Grubbing | Lump-Sum | 1 | 4 | Construction Project Sign | Each | 1 | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | 6 | Removal of Existing Driveways | Square Yard | 607 | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | 10 | Remove and reset signs | Each | 10 | 11 | Tree removal | Each | 1 | 12 | Solid slab sodding | Square Yard | 1140 | 13 | Water meter relocation | Each | 16 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds and Insurance | Lump-Sum | 1 | | 3 | Clearing and Grubbing | Lump-Sum | 1 | | 4 | Construction Project Sign | Each | 1 | | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | | 6 | Removal of Existing Driveways | Square Yard | 607 | | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | | 10 | Remove and reset signs | Each | 10 | | 11 | Tree removal | Each | 1 | | 12 | Solid slab sodding | Square Yard | 1140 | | 13 | Water meter relocation | Each | 16 | | Next Location 1 Next M-2604C-Location 1 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 177 4 Removal of Existing Driveways Square Yard 177 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 460 6 Removal of Existing Sidewalks including pavers Square Yard 5 7 Steel Truncated Domes Square Foot/Feet 100 8 Remove and reset signs Each 4 9 Tree removal Each 2 10 Solid slab sodding Square Yard 368 11 Water meter relocation Each 1 | Next M-2604C-Location 1 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 177 4 Removal of Existing Driveways Square Yard 177 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 460 6 Removal of Existing Sidewalks including pavers Square Yard 5 7 Steel Truncated Domes Square Foot/Feet 100 8 Remove and reset signs Each 4 9 Tree removal Each 2 10 Solid slab sodding Square Yard 368 11 Water meter relocation Each 1 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | 4 | Removal of Existing Driveways | Square Yard | 177 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | 8 | Remove and reset signs | Each | 4 | 9 | Tree removal | Each | 2 | 10 | Solid slab sodding | Square Yard | 368 | 11 | Water meter relocation | Each | 1 | | | | Next M-2604C-Location 1 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 177 4 Removal of Existing Driveways Square Yard 177 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 460 6 Removal of Existing Sidewalks including pavers Square Yard 5 7 Steel Truncated Domes Square Foot/Feet 100 8 Remove and reset signs Each 4 9 Tree removal Each 2 10 Solid slab sodding Square Yard 368 11 Water meter relocation Each 1 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | 4 | Removal of Existing Driveways | Square Yard | 177 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | 8 | Remove and reset signs | Each | 4 | 9 | Tree removal | Each | 2 | 10 | Solid slab sodding | Square Yard | 368 | 11 | Water meter relocation | Each | 1 | | | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | | 4 | Removal of Existing Driveways | Square Yard | 177 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | | 8 | Remove and reset signs | Each | 4 | | 9 | Tree removal | Each | 2 | | 10 | Solid slab sodding | Square Yard | 368 | | 11 | Water meter relocation | Each | 1 | | Next Location 2 Next M-2604C-Location 2 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 537 4 Removal of Existing Driveways Square Yard 537 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 731 6 Removal of Existing Sidewalks including pavers Square Yard 1 7 Steel Truncated Domes Square Foot/Feet 30 8 Remove and reset signs Each 2 9 Tree removal Each 1 10 Solid slab sodding Square Yard 585 11 Water meter relocation Each 18 | Next M-2604C-Location 2 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 537 4 Removal of Existing Driveways Square Yard 537 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 731 6 Removal of Existing Sidewalks including pavers Square Yard 1 7 Steel Truncated Domes Square Foot/Feet 30 8 Remove and reset signs Each 2 9 Tree removal Each 1 10 Solid slab sodding Square Yard 585 11 Water meter relocation Each 18 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | 4 | Removal of Existing Driveways | Square Yard | 537 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | 8 | Remove and reset signs | Each | 2 | 9 | Tree removal | Each | 1 | 10 | Solid slab sodding | Square Yard | 585 | 11 | Water meter relocation | Each | 18 | | | | Next M-2604C-Location 2 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 537 4 Removal of Existing Driveways Square Yard 537 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 731 6 Removal of Existing Sidewalks including pavers Square Yard 1 7 Steel Truncated Domes Square Foot/Feet 30 8 Remove and reset signs Each 2 9 Tree removal Each 1 10 Solid slab sodding Square Yard 585 11 Water meter relocation Each 18 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | 4 | Removal of Existing Driveways | Square Yard | 537 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | 8 | Remove and reset signs | Each | 2 | 9 | Tree removal | Each | 1 | 10 | Solid slab sodding | Square Yard | 585 | 11 | Water meter relocation | Each | 18 | | | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | | 4 | Removal of Existing Driveways | Square Yard | 537 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | | 8 | Remove and reset signs | Each | 2 | | 9 | Tree removal | Each | 1 | | 10 | Solid slab sodding | Square Yard | 585 | | 11 | Water meter relocation | Each | 18 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next M-2604C-Base Bid Code Description UOM Qty 1 Mobilization Lump-Sum 1 2 Bonds and Insurance Lump-Sum 1 3 Clearing and Grubbing Lump-Sum 1 4 Construction Project Sign Each 1 5 6" Portland Cement Concrete Driveways Complete in Place Square Yard 607 6 Removal of Existing Driveways Square Yard 607 7 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 1450 8 Removal of Existing Sidewalks including pavers Square Yard 51 9 Steel Truncated Domes (5x2) Square Foot/Feet 130 10 Remove and reset signs Each 10 11 Tree removal Each 1 12 Solid slab sodding Square Yard 1140 13 Water meter relocation Each 16 | 1 | Mobilization | Lump-Sum | 1 | 2 | Bonds and Insurance | Lump-Sum | 1 | 3 | Clearing and Grubbing | Lump-Sum | 1 | 4 | Construction Project Sign | Each | 1 | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | 6 | Removal of Existing Driveways | Square Yard | 607 | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | 10 | Remove and reset signs | Each | 10 | 11 | Tree removal | Each | 1 | 12 | Solid slab sodding | Square Yard | 1140 | 13 | Water meter relocation | Each | 16 | | | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds and Insurance | Lump-Sum | 1 | | 3 | Clearing and Grubbing | Lump-Sum | 1 | | 4 | Construction Project Sign | Each | 1 | | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | | 6 | Removal of Existing Driveways | Square Yard | 607 | | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | | 10 | Remove and reset signs | Each | 10 | | 11 | Tree removal | Each | 1 | | 12 | Solid slab sodding | Square Yard | 1140 | | 13 | Water meter relocation | Each | 16 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Mobilization | Lump-Sum | 1 | | 2 | Bonds and Insurance | Lump-Sum | 1 | | 3 | Clearing and Grubbing | Lump-Sum | 1 | | 4 | Construction Project Sign | Each | 1 | | 5 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 607 | | 6 | Removal of Existing Driveways | Square Yard | 607 | | 7 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 1450 | | 8 | Removal of Existing Sidewalks including pavers | Square Yard | 51 | | 9 | Steel Truncated Domes (5x2) | Square Foot/Feet | 130 | | 10 | Remove and reset signs | Each | 10 | | 11 | Tree removal | Each | 1 | | 12 | Solid slab sodding | Square Yard | 1140 | | 13 | Water meter relocation | Each | 16 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next M-2604C-Location 1 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 177 4 Removal of Existing Driveways Square Yard 177 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 460 6 Removal of Existing Sidewalks including pavers Square Yard 5 7 Steel Truncated Domes Square Foot/Feet 100 8 Remove and reset signs Each 4 9 Tree removal Each 2 10 Solid slab sodding Square Yard 368 11 Water meter relocation Each 1 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | 4 | Removal of Existing Driveways | Square Yard | 177 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | 8 | Remove and reset signs | Each | 4 | 9 | Tree removal | Each | 2 | 10 | Solid slab sodding | Square Yard | 368 | 11 | Water meter relocation | Each | 1 | | | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | | 4 | Removal of Existing Driveways | Square Yard | 177 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | | 8 | Remove and reset signs | Each | 4 | | 9 | Tree removal | Each | 2 | | 10 | Solid slab sodding | Square Yard | 368 | | 11 | Water meter relocation | Each | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 177 | | 4 | Removal of Existing Driveways | Square Yard | 177 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 460 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 5 | | 7 | Steel Truncated Domes | Square Foot/Feet | 100 | | 8 | Remove and reset signs | Each | 4 | | 9 | Tree removal | Each | 2 | | 10 | Solid slab sodding | Square Yard | 368 | | 11 | Water meter relocation | Each | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next M-2604C-Location 2 Code Description UOM Qty 1 Bonds and Insurance Lump-Sum 1 2 Clearing and Grubbing Lump-Sum 1 3 6" Portland Cement Concrete Driveways Complete in Place Square Yard 537 4 Removal of Existing Driveways Square Yard 537 5 5" Portland Cement Concrete Sidewalk Complete in Place Square Yard 731 6 Removal of Existing Sidewalks including pavers Square Yard 1 7 Steel Truncated Domes Square Foot/Feet 30 8 Remove and reset signs Each 2 9 Tree removal Each 1 10 Solid slab sodding Square Yard 585 11 Water meter relocation Each 18 | 1 | Bonds and Insurance | Lump-Sum | 1 | 2 | Clearing and Grubbing | Lump-Sum | 1 | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | 4 | Removal of Existing Driveways | Square Yard | 537 | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | 8 | Remove and reset signs | Each | 2 | 9 | Tree removal | Each | 1 | 10 | Solid slab sodding | Square Yard | 585 | 11 | Water meter relocation | Each | 18 | | | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | | 4 | Removal of Existing Driveways | Square Yard | 537 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | | 8 | Remove and reset signs | Each | 2 | | 9 | Tree removal | Each | 1 | | 10 | Solid slab sodding | Square Yard | 585 | | 11 | Water meter relocation | Each | 18 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | Bonds and Insurance | Lump-Sum | 1 | | 2 | Clearing and Grubbing | Lump-Sum | 1 | | 3 | 6" Portland Cement Concrete Driveways Complete in Place | Square Yard | 537 | | 4 | Removal of Existing Driveways | Square Yard | 537 | | 5 | 5" Portland Cement Concrete Sidewalk Complete in Place | Square Yard | 731 | | 6 | Removal of Existing Sidewalks including pavers | Square Yard | 1 | | 7 | Steel Truncated Domes | Square Foot/Feet | 30 | | 8 | Remove and reset signs | Each | 2 | | 9 | Tree removal | Each | 1 | | 10 | Solid slab sodding | Square Yard | 585 | | 11 | Water meter relocation | Each | 18 |

    Key dates

    1. April 10, 2026Published
    2. May 8, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.