Active SLED Opportunity · CALIFORNIA · FRESNO UNIFIED SCHOOL DISTRICT
AI Summary
Fresno Unified School District seeks bids for playground replacement and site improvements at Heaton Elementary. Project includes inclusive play elements, shade structures, safety surfacing, artificial turf, and concrete work. Mandatory pre-bid conference on April 20, 2026. Bids due May 7, 2026 via online portal.
ONLINE BID OPENING: PRELIMINARY BID RESULTS ARE AVAILABLE ON THE RESULTS TAB As soon as the buyer un-seals all bids, preliminary results are available. After comprehensive review, the final bid results will be sent out to all bidders. Optionally, you may attend on Teams using the information provided below. ________________________________________________________________________________ Microsoft Teams meeting Join: https://teams.microsoft.com/meet/216141903356771?p=bgDvWZijnnUcitHtd2 Meeting ID: 216 141 903 356 771 Passcode: tc334Zr9 Need help? | System reference Dial in by phone +1 559-512-2623,,301080759# United States, Fresno Find a local number Phone conference ID: 301 080 759# ________________________________________________________________________________ FRESNO UNIFIED SCHOOL DISTRICT 00 11 00 NOTICE TO BIDDERS NOTICE INVITING BIDS PURSUANT TO PUBLIC CONTRACT CODE 22000, ET SEQ. (THE UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT) Notice is hereby given that the Fresno Unified School DISTRICT (“DISTRICT”) will receive sealed bids for Bid No. 26-50, Heaton Elementary School Playground Replacement and Sitework Improvements, to replace existing playground at SPED Pre-k -3rd grade play area including new inclusive play elements, shade structures, safety surfacing, artificial turf, concrete and related site improvements. Prime Contractor must have a valid Class “B” Contractor’s License. The time allowed for completion for the project shall be 65 Calendar days. The Architect/Engineers’ estimate for this project is around $716,000 (estimate as of March 2026). A MANDATORY pre-bid conference has been scheduled at 10:00 AM, April 20, 2026 in front of the Administration Office at Heaton Elementary, 1533 N San Pablo Ave, Fresno, CA 93728 . Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”. Immediately following the pre-bid conference will be a mandatory job-walk of the site(s). All visitors must check-in at the school office using our visitor management system which requires ID verification via government-issued identification card or driver’s license to receive a badge and enter the campus. Bidders may arrive earlier than the scheduled time to obtain their badge. Sealed Bids must be received prior to 2:00 P.M. on May 7, 2026 on Procureware, the DISTRICT’s online bidding portal, after which time the bids will be opened and bid results posted. Bids shall be accompanied by a certified check, cashier’s check, or a bidder’s bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. Bid documents may be downloaded at no charge from the district’s bidding portal, Procureware, at: https://fresnousdpurchasing.procureware.com/home. All bids must be submitted through the portal. Refer questions to Panhia Moua panhia.moua@fresnounified.org. The District reserves the right to accept or reject any or all bids, or any combination of bids and to waive any irregularities or informalities which may be legally waived. Published: April 13, 2026
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.