Active SLED Opportunity · TEXAS · HOUSTON
AI Summary
Houston Airport System seeks contractor for runway and taxiway reconstruction, including concrete pavement, asphalt overlay, electrical and drainage infrastructure, and lighting system replacement at William P. Hobby Airport. Pre-bid conference on May 7, 2026.
The Houston Airport System (HAS) is seeking a contractor to provide full depth concrete pavement reconstruction of runway 13R-31L, highspeed taxiways M1 and M3, connector taxiways H, K, L, and M within the runway safety area (RSA) limits, and asphalt mill and overlay of the center 50’ along Taxiway F. As well as reconstructing associated asphalt shoulders and blast pads on all new pavements, new electrical and drainage infrastructure, replacement of runway 13R medium-intensity approach lighting system with runway alignment indicator lights (MALSR) infrastructure with new relocated shelter, and construction of runway 31L glide slope relocation. New asphalt shoulders on Taxiways D, E, and G are included as a bid alternative.
DBE Goal 0%
In Person Conference Date
Date: May 7, 2026 at 2:00 PM CT
A Pre-Bid Conference will be held in person.
William P. Hobby Airport
7800 Airport Blvd, Houston, Texas 77061 in Hobby Conference Room A, located on the Ticketing Level near the Delta check-in counter.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.