SLED Opportunity · NEVADA · NEVADA

    Hydroelectric Powerhouse Improvements (Prequalification for Major Equipment Suppliers - Turbine and Generator System

    Issued by Nevada
    stateSource SoughtNevadaSol. 19368
    Closed
    STATUS
    Closed
    due Mar 17, 2026
    PUBLISHED
    Feb 17, 2026
    Posting date
    JURISDICTION
    Nevada
    state
    NAICS CODE
    221112
    AI-classified industry

    AI Summary

    RSCI seeks major equipment suppliers for hydroelectric powerhouse improvements in Reno, NV. The project includes turbine and generator systems with controls and SCADA. Prequalification applications are due by March 17, 2026.

    Opportunity details

    Solicitation No.
    19368
    Type / RFx
    Source Sought
    Status
    Issued
    Level
    state
    Published Date
    February 17, 2026
    Due Date
    March 17, 2026
    NAICS Code
    221112AI guide
    Jurisdiction
    Nevada
    State
    Nevada
    Agency
    Nevada

    Description

    This request for pre-qualifications is on behalf of RSCI not for Truckee Meadows Water Authority. All evaluations will be made by RSCI. DO NOT SUBMIT YOUR PREQUALIFICATION APPLICATION IN NGEM. FOLLOW THE INSTRUCTIONS OUTLINED IN THE DOCUMENT UPLOADED ON THE ATTACHMENTS TAB. RSCI is the Construction Manager at Risk (CMAR) hereby requesting that Major Equipment Suppliers submit Statement of Prequalification Applications pursuant to NRS chapter 338.16991 for the above project. Major Equipment items include: Turbine and Generator System The system includes the Turbine, Generator, Lubrication System, Neutral/Grounding Transformer, 5kV Line-up and Protective Relays, along with other associated features of work. Turbine Isolation Valves, along with Controls and SCADA for the Hydroelectric system, will be pursued as bid options. If necessary, the selected Supplier shall provide all necessary control descriptions and support for the Owner (TMWA) to complete system programming. This facility is part of a run of the river hydroelectric system that utilizes up to 86 FT of head and 400 CFS of flow to generate 2.8MW. Supplier experience with hydroelectric systems of similar size and configuration is favorable. Special Federal Conditions will apply in order for this project to be eligible for Federal Tax Credits.

    Key dates

    1. February 17, 2026Published
    2. March 17, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.