SLED Opportunity · TEXAS · CITY OF HUTTO, TX
AI Summary
City of Hutto, TX seeks sealed bids for full depth reconstruction of Live Oak Street with alternate bids for Metcalfe and Hutto Streets. Scope includes asphalt removal and replacement, traffic control, and cleanup per city specs.
The City of Hutto, a home rule municipality, is soliciting sealed bids from qualified contractors for furnishing all labor, materials, and equipment for the full depth rebuild of Live Oak St. located in Hutto, TX. Base bid for Live Oak St., total length to be done is approximately 3,050 LF by 22 LF, between Park Street going east shortly past West st.. The scope of work includes removing 7” of asphalt, base, and subgrade, replacing with 5” of Type D asphalt and 2” of Type B asphalt, and associated traffic control, cleanup, and compliance with city specifications. Alternate bid A) for Metcalfe St., total length to be done is approximately 1,381 LF by 22 LF, between FM 1660 going east towards West St. The scope of work includes removing 7” of asphalt, base and subgrade, replacing with 5” of Type D asphalt and 2” of Type B asphalt, and associated traffic control, cleanup, and compliance with city specifications. Alternate bid B) for Hutto St., total length to be done is 1718 LF by 22 LF, between FM 1660 going east towards Whitfield St. The scope of work includes removing 7” of asphalt, base and subgrade, replacing with 5” of Type D asphalt and 2” of Type B asphalt, and associated traffic control, cleanup, and compliance with city specifications.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.