Active SLED Opportunity · ARKANSAS · BENTONVILLE

    IFB-26-53 Town Branch Basin Sewer Improvements – Alignments 2, 3, and 4

    Issued by City of Bentonville
    cityRFIBentonvilleSol. 8840ed51-e8ce-47ef-98ca-9e9a3b89ee96
    Open · 29d remaining
    DAYS TO CLOSE
    29
    due Sep 3, 2026
    PUBLISHED
    Jul 26, 2026
    Posting date
    JURISDICTION
    Bentonville
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Bentonville seeks qualified contractors for phased construction of Town Branch Basin Sewer Improvements involving installation of gravity sewer pipelines and associated roadway and surface restoration across three alignments.

    Opportunity details

    Solicitation No.
    8840ed51-e8ce-47ef-98ca-9e9a3b89ee96
    Type / RFx
    RFI
    Status
    active
    Level
    city
    Published Date
    July 26, 2026
    Due Date
    September 3, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Bentonville
    Agency
    City of Bentonville

    Description

    The City of Bentonville, Arkansas is accepting formal, sealed bids from properly qualified, licensed, insured, and

    experienced Contractor for the construction of Town Branch Basin Sewer Improvements (Alignments 2, 3 & 4) for

    the City of Bentonville Water Department consisting of four construction areas identified as Alignment 3 – Zone 1,

    Alignment 3 – Zone 2, Alignment 2, and Alignment 4, which are intended to be constructed in a phased manner

    and are generally described below.

    Alignment 3 is divided into 2 separate Work Zones and includes installation of approximately 1,650 linear feet of

    gravity sewer, consisting primarily of 24‑inch diameter PVC sewer main and approximately 155 linear feet of

    34‑inch steel encasement installed via pilot guided auger bore.

    Alignment 2 includes installation of approximately 1,900 linear feet of primarily 30-inch diameter gravity sewer,

    consisting of approximately 840 linear feet of PVC sewer main and 1,060 linear feet of ductile iron pipe, with

    associated roadway restoration and surface restoration.

    Alignment 4 includes installation of approximately 1,885 linear feet of gravity sewer, consisting primarily of 18-inch

    diameter PVC sewer main, with upsizing of the existing sewer and associated roadway and surface restoration.

    Key dates

    1. July 26, 2026Published
    2. September 3, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.