Active SLED Opportunity · CALIFORNIA · MONTEBELLO UNIFIED SCHOOL DISTRICT

    IRFB No. 39(2025-2026) Painting of Kitchen at Fremont Elementary School

    Issued by Montebello Unified School District
    educationIRFBMontebello Unified School DistrictSol. IRFB_39_Painting_Kitchen_FRE
    Open · 22d remaining
    DAYS TO CLOSE
    22
    due Jun 25, 2026
    PUBLISHED
    May 26, 2026
    Posting date
    JURISDICTION
    Montebello Unified
    education
    NAICS CODE
    238320
    AI-classified industry

    AI Summary

    Painting services for kitchen at Fremont Elementary School including site protection, containment, surface cleaning, drywall repair, and application of mildew-resistant caulking.

    Opportunity details

    Solicitation No.
    IRFB_39_Painting_Kitchen_FRE
    Type / RFx
    IRFB
    Status
    Available
    Level
    education
    Published Date
    May 26, 2026
    Due Date
    June 25, 2026
    NAICS Code
    238320AI guide
    Agency
    Montebello Unified School District

    Description

    1. Site Protection & Containment

    Install heavy-duty plastic dust and vapor barriers to establish full containment and isolate the kitchen area from

    adjacent school facilities. Protect all stainless steel work surfaces, walk-in refrigeration units, commercial ovens,

    dishwashers, and food preparation stations using poly sheeting and secure tape masking. Mask and safeguard

    all fire suppression components, smoke detection devices, gas lines, electrical panels, and HVAC diffusers/vents

    prior to work activities. Remove, label, and store switch plates, outlet covers, and wall-mounted signage before

    commencement of painting operations.

    2. Surface Preparation and Finish

    Perform thorough cleaning of walls, ceilings, trim, and related surfaces using an industrial-strength degreasing

    solution (e.g., Trisodium Phosphate/TSP) to remove grease, soot, and food-related contaminants. Wipe Rinse all

    treated areas with clean water to eliminate residual cleaning agents and allow surfaces to dry completely before

    proceeding. Repair drywall and such surfaces by filling cracks, holes, and damaged areas using patching

    compounds. Apply mildew-resistant PAINTABLE waterproof silicone/acrylic caulking to all gaps, penetrations,

    trim interfaces, and joints.

    Key dates

    1. May 26, 2026Published
    2. June 25, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.