SLED Opportunity · VIRGINIA · VIRGINIA

    ITB No. 26-2970-5JL - Fall Line Trail Southern Sections

    Issued by Henrico County Government
    stateSource SoughtvirginiaSol. 123451
    Closed
    STATUS
    Closed
    PUBLISHED
    Jun 30, 2026
    Posting date
    JURISDICTION
    virginia
    state
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Henrico County seeks contractors for trail construction and safety improvements including shared-use paths, pedestrian crosswalks, bridge structures, drainage, stormwater management, pavement marking, and road diet implementation.

    Opportunity details

    Solicitation No.
    123451
    Type / RFx
    Source Sought
    Status
    Open
    Level
    state
    Published Date
    June 30, 2026
    Due Date
    NAICS Code
    237310AI guide
    Jurisdiction
    virginia
    Agency
    Henrico County Government

    Description

    The Work consists of the following: Lakeside Community Trail Phase 2 #FLTThe Lakeside Community Trail Phase 2 proposed improvements total approximately 2,300 linear feet of shared-use-path including a branch connection from the primary trail to Brook Run Drive, pedestrian crosswalks at the intersection of Dumbarton Road and Gillespie Avenue, and two crossings over Upham Brook. A combination of approximately 150 linear feet of premanufactured truss and 380 linear feet of concrete boardwalk structures will be used to cross Upham Brook near Dumbarton Road and on the approach to the Belmont Park baseball fields. The improvements also consist of drainage design, stormwater management (SWM), pavement marking, and signing. Lakeside Community Trail Phase 3 #FLTThe Lakeside Community Trail Phase 3 proposed improvements total approximately 3,500 linear feet of shared-use-path including a crossing over Upham Brook. A combination of approximately 100 linear feet of premanufactured truss and 490 linear feet of concrete boardwalk structures will be used to cross Upham Brook near the Grand Richmond at Brook Run on the approach to Hilliard Road. The improvements also consist of drainage design, stormwater management (SWM), pavement marking, and signing.Brook Road and Hilliard Road Trail #FLTThe Brook Road and Hilliard Road Trail proposed improvements total approximately 2,800 linear feet of shared-use path, including a pedestrian crosswalk across Hilliard Road (Route 161) and a proposed pedestrian crossing over North Run. A combination of approximately 60 linear feet of premanufactured truss and 30 linear feet of concrete boardwalk structures will be used to cross North Run adjacent to the Belmont Golf Course parcel near the intersection of Hilliard Road (Route 161) and Brook Road (Route 1). The Brook Road and Hilliard Road Trail improvements also include a portion of the road diet along Hilliard Road (Route 161) from four lanes to three lanes. The improvements also consist of drainage design, utility design, stormwater management (SWM), pavement marking, and signing.Hilliard Road Safety and Mobility ImprovementsThe Hilliard Road Safety and Mobility proposed improvements total approximately 2,700 linear feet of pavement marking and signing improvements within existing right-of-way to add bicycle lanes and accommodations. The improvements are along Hilliard Road between Lakeside Avenue and approximately 1,000 feet west of Brook Road, tying into the Brook Road and Hilliard Road Trail proposed improvements. The proposed bicycle lanes will be accompanied by a road diet from four lanes to three lanes.

    Key dates

    1. June 30, 2026Published

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.