Construction and realignment of crosswalk, installation of RRFB, and replacement of sidewalk ramps at Scott Elementary School in Oregon. Estimated cost $200K-$300K. No pre-bid conference.
Construction/realignment of crosswalk, installation of rectangular rapid flashing beacon (RRFB), and replacement of four sidewalk ramps as called for in the Plans and Specifications, and such Incidental Work as requested by the Engineer. The estimated project cost range is $200,000 to $300,000. Pre Bid Conference: N/a
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.