SLED Opportunity · ARIZONA · CITY OF SIERRA VISTA

    Job Order Contract: General Construction and Building Maintenance Services

    Issued by City of Sierra Vista
    cityRFPCity of Sierra VistaSol. 244920
    Closed
    STATUS
    Closed
    due Apr 16, 2026
    PUBLISHED
    Mar 15, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    236220
    AI-classified industry

    AI Summary

    The City of Sierra Vista seeks qualified contractors for a Job Order Contract to provide general construction and building maintenance services on an as-needed basis. The contract term is one year with four optional renewals. Projects include small building construction, renovations, repairs, and emergency services with anticipated project values up to $500,000.

    Opportunity details

    Solicitation No.
    244920
    Type / RFx
    RFP
    Status
    open
    Level
    city
    Published Date
    March 15, 2026
    Due Date
    April 16, 2026
    NAICS Code
    236220AI guide
    State
    Arizona
    Agency
    City of Sierra Vista

    Description

    The City of Sierra Vista is soliciting statements of qualifications to establish a Job Order Contract (JOC) with qualified Contractors to provide general construction and facility maintenance services on an as-needed basis. Contractors shall support a broad range of tasks including small building construction and expansion projects, repairs/upgrades, renovations, and emergency response services across City-owned buildings.  The contract term shall be for one (1) year with the option to renew for four (4) additional one-year terms, not to exceed five total contract years.  The City anticipates making multiple awards.

    All work shall meet high standards of quality, adhere to strict safety protocols, and comply with all applicable local, state, and federal regulations.

    Background

    The City of Sierra Vista has the occasional need for small “vertical” construction services involving City buildings.  Work may include but is not limited to small additions to existing City buildings, construction of new small buildings such as free-standing restrooms and storage areas, renovations of existing facilities to meet user needs and requirements, repairs from storm events or other damage, and assistance with emergency call-outs as needed to prevent further facility damage.  The value of projects completed under this RFQ will vary but is anticipated to be a maximum of approximately $500,000 per project.  Successful contractors will be responsible for drafting a scope of work for requested projects in close coordination with City staff, and after the scope is accepted, submitting a cost proposal for the work.  The City reserves the right to solicit bids or request quotes for any project separately from this RFQ, and the offering of a contract under this RFQ is not a guarantee of work. 

    The City of Sierra Vista utilizes a variety of different funding to include federal grants from CDBG, FTA, FAA and other state and local agencies. Federal grants require additional requirements and documentation. In order to qualify to work on federally funded projects, all questions in the Vendor Response must be submitted, even if they are marked optional. Respondents may submit a response for non-federally funded projects by responding to all required questions. Preference may given to respondents who are able to meet the requirements of the federal projects in the form of higher scores in the Evaluation Criteria.

    The City expects a majority of projects awarded from this effort to be from the general fund and not subject to federal requirements.

    Project Details

    • Reference ID: 2026-RFP-039
    • Department: PUBLIC WORKS
    • Department Head: Sharon Flissar (Public Works Director)

    Important Dates

    • Questions Due: 2026-04-03T00:00:00.000Z
    • Answers Posted By: 2026-04-10T00:00:00.000Z
    • Pre-Proposal Meeting: 2026-03-26T20:30:00.000Z — Virtual Teams Meeting Link: https://tinyurl.com/26afdfk6 Meeting ID: 268 602 769 914 63 Passcode: CC2wv7jU Phone In: 602-704-1809 Phone conference ID: 859 258 211#

    Addenda

    • Addendum #1 (released 2026-03-19T18:51:34.779Z) —

      The time for the Pre-Proposal Conference has been updated from 12:00 am to 1:30 pm on Thursday, March 26, 2026. 

      Please use the See What Changed link to view all the changes made by this addendum.

    • Addendum #2 (released 2026-04-03T20:45:58.052Z) —

      The following revisions were made to the solicitation document:

      • Scope of Work Item 4.10 
        • #5 Labor Rates language was deleted.
        • #6 Attachments language was added
      • Vendor Questionnaire Item 3
        • References Section was deleted. Please include a References page as listed under Item 4.10 under Item 5 Statement of Qualifications Response
      • Vendor Questionnaire Item 8 
        • Item was denoted as optional, not required

      The attendance sheet from the Pre-Statement meeting held at 1:30 pm on March 26, 2026 is also attached. All questions asked during the meeting has been posted in the Question and Answer Report, also attached. 

      Please use the See What Changed link to view all the changes made by this addendum.

    Evaluation Criteria

    • Licensing and Certifications (10 pts)

      Contractor shall list their current and active Arizona Registrar of Contractors (ROC) license classification(s) and provide copies of each license.

    • Organizational Structure and Key Personnel (15 pts)

      Contractor shall describe the structure of their project team and identify key personnel who will be assigned to Sierra Vista, including their roles, qualifications, and experience.

    • Resource Capability and Availability (15 pts)

      Contractor shall describe their company’s available labor, equipment, and subcontractor resources, and how they support the City of Sierra Vista’s needs. Ability to work on federally funded projects is a plus.

    • Relevant Experience (30 pts)

      Contractor shall describe their experience providing general construction and facility maintenance services to entities of similar size and scope. The narrative must thoroughly describe how the Contractor has supplied expertise for similar contracts and must include the extent of their experience, expertise, and knowledge as a contractor. Experience in federally funded projects is a plus.

    • Job Order Management, Scheduling and Cost Control (25 pts)

      Contractor shall describe their process for reviewing, pricing, and responding to Job Orders. Contractor shall explain their approach to developing cost proposals, preparing detailed scopes of work, establishing project schedules, and coordinating inspections and approvals.

      Contractor shall describe:

      • Their internal cost estimating process
      • How labor, material, and subcontractor costs are documented
      • Procedures for managing change orders
      • Methods for preventing cost overruns and scope creep
      • Communication protocols with City staff

      Contractor shall also describe their quality control procedures and safety program applicable to construction and maintenance services, including how deficiencies are identified and corrected.

    • References (5 pts)

      Contractor shall provide contact information for a minimum of three (3) references who can comment on the company’s professional work in providing services similar in scope to that of City of Sierra Vista.

    Submission Requirements

    • AUTHORIZED SIGNATURE AND OFFER FORM (required)

      Please download the below documents, complete, and upload.

    • PROPOSER GUARANTEES AND WARRANTIES (required)

      Please download the below documents, complete, and upload.

    • NON COLLUSION STATEMENT (required)

      I certify that this bid is genuine and is not in any way collusive or sham; that the bid is not made with the intent to restrict or prohibit competition, that this firm has not revealed the contents of the bid to, or in any way colluded with, any other firm which may compete for the contract; and that no other firm which may compete for the contract has revealed the contents of a bid to, or in any way colluded with, this firm.

      This affidavit is required pursuant to Arizona Revised Statutes 34-253 and 41-2549. Failure to submit this affidavit signed at the time of bid opening is grounds for disqualification of the bid.

    • STATEMENT OF QUALIFICATIONS RESPONSE (required)

      Upload your response here according to the guidelines described in this RFQ.

    • Transaction Privilege Tax Information Form (required)

      Please download the below documents, complete, and upload.

    • W9 / W8 Form (required)

      Please download the below documents, complete, and upload. A W9 Form is required for all U.S.-based firms. International Firms will need to attach the appropriate documentation per the W8 attachment. 

    • Certification of Insurability (required)

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - Certification Regarding Lobbying

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - Governmentwide Debarment and Suspension

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - 2 CFR 200 Provisions

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - Certification of Non-Segregated Faciltiies

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - Certification Regarding Foreign Countries

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - Responsibility

      Please download the below documents, complete, and upload.

    • Federal Project Requirement - BIDDER’S STATEMENT OF PREVIOUS CONTRACTS SUBJECT TO EEO CLAUSE

      Please download the below documents, complete, and upload.

    • Contract Term (required)

      What is the term for this contract?

      Use the following format example: Five (5) years

    • Interviews (required)

      Will the City be conducting interviews for this project?

    • Number of References (required)

      How many references will be requested as part of the vendor's submission?

    • Page Number (required)

      What is the maximum number of pages of the vendors submission?

    • Pre-proposal Conference (required)

      Will there be a pre-proposal conference?

    • Evaluation Criteria (required)

      What is the evaluation criteria for selection?

      Example: Cost, Experience, Qualifications, Ability to Meet the Technical Requirements, Ease of Use, and the Ability to Deliver the Scope of Work

    • Duration of Proposal Validity (required)

      How long will the proposal remain valid from the date it is signed?

      Please use this format: one hundred twenty (120)

    • Interviews (required)

      Will the City be conducting interviews for this project as part of the evaluation?

    Questions & Answers

    Q (Pre-proposal Meeting): Is the meeting at 12:00 a.m.?

    A: The meeting is scheduled for 1:30 pm on March 26, 2026. The change is reflected in Addendum 1.


    Q (From Pre-Statement Meeting):

    A: Roughly how many firms does Sierra Vista intend to award under this? The City intends to award between three to five contracts, but reserves the right to award less in the City's best interest.


    Q (From Pre-Statement Meeting):

    A: What is the timeline as far as beginning of work/first scope issued after award? We anticipate awarding a scope of work within 2 weeks of award.


    Q (From Pre-Statement Meeting):

    A: Does a Cover Sheet count towards the page limit? No


    Q (From Pre-Statement Meeting):

    A: Do resumes and ROC licenses count towards page limit? What about the index? [paraphrased] Resumes and Arizona Registrar of Contractors license may be attached in a Section 6 and not count towards the page limit (see Addendum 2. A Table of Contents, Index, or any form requested in the Vendor Questionnaire will not count towards the page limit.


    Q (From Pre-Statement Meeting):

    A: Does the [cover] letter count towards the page limit? Yes


    Q (Cover Letter): In the Pre-bid meeting per RFI #4 the question asked regarding the cover sheet count towards the page limit and was answered no but in the 6 RFI question it says it does count towards the page limit. Can you confirm if it is included in the page limit or is it no?

    A: A cover title page would not count towards the page limit. A cover letter would count towards the page limit.


    Q (Bonds): What is the Bonding Requirement

    A: The Contractor shall provide required Payment and Performance Bonds to the Procurement Division for each Job prior to the Notice to Proceed, for Task Orders valued at $100,000 or above. No annual requirement is established.


    Q (Bonds): Are Bonds required for all Projects

    A: No, bonds will not be sought for projects valued under $100,000.


    Q (Insurance): What is the insurance requirement?

    A: The insurance requirements are reflected in the Bid Terms and Conditions in Attachment A.


    Q (No subject): Is there an Umbrella Policy Required?

    A: Yes, please see Attachment A.


    Q (No subject): Does the City require any particular training other than OSHA / ADOSH?

    A: No.


    Q (No subject): What format is required for schedules?

    A: The contractor may use their own format for schedules.


    Key dates

    1. March 15, 2026Published
    2. April 16, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.