SLED Opportunity · COLORADO · COLORADO
AI Summary
Invitation to Bid for the Kern Ditch Culvert Extension project in Windsor, Colorado, including construction of concrete basin, sidewalk, access ramps, and drainage pan. Work within ditch due by April 1, 2026; final completion by May 15, 2026.
This project includes the extension of the Kern Ditch Culvert, along with all necessary work to construct a concrete basin, sidewalk, access ramps, and drainage pan at the intersection of Chimney Park Drive and Main Street (State Highway 392). For additional information, see the construction drawings. The work within the ditch shall be completed by April 1, 2026. The final completion date is May 15, 2026. This project includes the extension of the Kern Ditch Culvert, along with all necessary work to construct a concrete basin, sidewalk, access ramps, and drainage pan at the intersection of Chimney Park Drive and Main Street (State Highway 392). For additional information, see the construction drawings. The work within the ditch shall be completed by April 1, 2026. The final completion date is May 15, 2026.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.