SLED Opportunity · CALIFORNIA · MEXICAN AMERICAN OPPORTUNITY FOUNDATION

    Kitchen Upgrade - Demo and Installation - Greenfield

    Issued by Mexican American Opportunity Foundation
    localRFQMexican American Opportunity FoundationSol. 140332
    Closed
    STATUS
    Closed
    due Apr 13, 2026
    PUBLISHED
    Mar 30, 2026
    Posting date
    JURISDICTION
    Mexican American
    local
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Comprehensive kitchen upgrade project in Greenfield, CA including demolition, painting, installation of countertops, fixtures, flooring, and finishes. Contractor responsible for permits, cleanup, and compliance with all codes. Estimated bid value $35,000. RFQ due April 13, 2026.

    Opportunity details

    Solicitation No.
    140332
    Type / RFx
    RFQ
    Status
    Bidding
    Level
    local
    Published Date
    March 30, 2026
    Due Date
    April 13, 2026
    NAICS Code
    236118AI guide
    Agency
    Mexican American Opportunity Foundation

    Description

    STATEMENT OF WORK (SOW)Project: Kitchen UpgradeSite Address: 131 13th Street, Greenfield, CA 939271. Project DescriptionThis project consists of a comprehensive kitchen upgrade including demolition, surface preparation,painting, installation of new countertops, backsplash, fixtures, flooring, and finishes. All workshall be completed in a professional manner and in compliance with all applicable codes andregulations.2. Scope of WorkA. Demolition and RemovalThe Contractor shall:• Remove and properly dispose of:o Two (2) existing sinkso Two (2) existing faucetso All existing countertopso Two (2) pass-through shelveso Existing coved base around the perimeter of the kitchenB. Cabinet Preparation and Painting• Prepare all cabinet doors, drawer fronts, and all exposed cabinet surfaces.• Paint all cabinet doors, drawer fronts, and exposed cabinet surfaces with gloss finish paint.• Surface preparation shall include cleaning, sanding, patching, and priming as necessary toensure a smooth and durable finish.C. Wall and Ceiling Painting• Paint all kitchen walls and ceiling with semi-gloss paint.• All surfaces shall be properly prepared prior to painting.D. Countertops and Backsplash Installation• Install new Corian countertops throughout the kitchen .• Install a full-height Corian backsplash, except:o The area behind the range shall receive a stainless steel panel in lieu of Corian.E. Plumbing Fixtures• Install two (2) new stainless steel double-bowl sinks complete with new strainerbaskets.• Install two (2) new pull-out style kitchen sink faucets.F. Cabinet Hardware• Install new drawer pulls and door handles on all cabinet doors and drawers.G. Flooring and Base• Install new vinyl click-together plank flooring throughout the kitchen.• Install new coved base around the full perimeter of the room following flooringinstallation.3. Materials and Color Selection• All paint colors, Corian colors, cabinet hardware, and finish selections shall beselected and approved by the Owner prior to the start of the project.4. Cleanup and Disposal• Contractor shall maintain daily job site cleanup.• Upon completion of the project, Contractor shall:o Remove all construction debriso Haul away all materialso Dispose of all job-related waste at an approved offsite disposal facility5. Permits and Inspections• The Contractor shall be responsible for obtaining all required permits, approvals,and inspections necessary to complete the work described in this SOW, includingbut not limited to building and plumbing permits.• All work shall comply with local, state, and federal codes, and with requirementsof the City of Greenfield and any authority having jurisdiction.• The Contractor shall schedu le and coordinate all required inspections and shallcorrect, at no additional cost to the Owner, any work found to be non-compliant.• Copies of approved permits and final inspection approvals shall be provided to theOwner upon request prior to project closeout.6. Exclusions and Change Management• Any work not specifically described in this Statement of Work is excluded.• Any work outside the scope of this SOW shall require a separate written quote andprior written approval from the Owner before proceeding.7. General Requirements• Contractor shall maintain a safe, clean, and orderly job site at all times.• Contractor shall protect adjacent areas from damage during construction.• Work shall be coordinated to minimize disruption to facility operations.• Contractor shall be responsible for all labor, materials, tools, equipment, andsupervision necessary to complete the work. Estimated Bid Value: $35,000.00 Online Q&A: Yes Location Information: Department: Procurement Department Address: 401 N. Garfield Ave.401 N. Garfield Ave.Montebello, California90640 County: Los Angeles

    Key dates

    1. March 30, 2026Published
    2. April 13, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.