SLED Opportunity · FLORIDA · WALTON COUNTY

    Landscaping Hwy. 331 from Short Ave. - Bay Grove Rd.

    Issued by Walton County
    countyRFQWalton CountySol. 254643
    Closed
    STATUS
    Closed
    due Apr 16, 2026
    PUBLISHED
    Apr 9, 2026
    Posting date
    JURISDICTION
    Walton County
    county
    NAICS CODE
    561730
    AI-classified industry

    AI Summary

    Walton County requests quotes for routine landscape maintenance services along Hwy 331 from Short Ave to Bay Grove Rd for one year.

    Opportunity details

    Solicitation No.
    254643
    Type / RFx
    RFQ
    Status
    open
    Level
    county
    Published Date
    April 9, 2026
    Due Date
    April 16, 2026
    NAICS Code
    561730AI guide
    Jurisdiction
    Walton County
    State
    Florida
    Agency
    Walton County

    Description

    Walton County is seeking qualified vendors to provide routine landscape maintenance services to ensure the long-term health, appearance, and functionality along Hwy 331 from Short Ave to Bay Grove Rd for 0ne (1) year.

    Project Details

    • Reference ID: 9-26
    • Department: Public Works
    • Department Head: Buddy Wright (Director)

    Evaluation Criteria

    • Summary

      Walton County is seeking qualified vendors to provide routine landscape maintenance services to ensure the long-term health, appearance, and functionality along Hwy 331 from Short Ave to Bay Grove Rd for 0ne (1) year.

    • Important Instructions for Electronic Submittals

      The Walton County is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.

    • Quote Request Details (Scope of work):

      Minimum maintenance activity of these areas is identified in the attached Landscape Plans, page 23 section 3-14. In addition, to meeting the minimum maintenance activities, meet any other FDOT standards and specifications, as well as stipulations as may be outlined in the FDOT Landscape Care Guide book.

      THE FOLLOWING LISTS MINIMUM MAINTENANCE ACTIVITY REQUIREMENTS FOR CONTINUING LONG-TERM HEALTH AND VIABILITY AND ATTRACTIVENESS OF THE PROJECT. ACTIVITIES DESCRIBED ARE FOR A YEAR TIME PERIOD, TO BE REPEATED EACH YEAR:

       

    • Timeline
      Quote Release Date:April 9, 2026
      Quote Requested Due Date:April 16, 2026, 12:00pm
    • Project Contact

      Scott Caraway

      Deputy Public Works Director

      117 Montgomery Circle

      Defuniak Springs, FL 32435

      Email: scott.caraway@mywaltonfl.gov

      Phone: (850) 892-8108

    • MOWING
      • Mow all turf areas:
        • Weekly (April through September)
        • Monthly (October through March)
      • Maintain uniform turf height and overall appearance
      • Remove or disperse clippings from hard surfaces

       

    • Procurement Contact

      Jordan Lee

      Procurement Analyst

      176 Montgomery circle

      DEFUNIAK SPRINGS, FL 32435

      Email: jordan.lee@mywaltonfl.gov

      Phone: (850) 892-8176 Ext: 1214

    • FERTILIZER
      • Apply fertilizer to all plant material in accordance with:
        • Landscape specifications
        • Manufacturer recommendations
        • Direction of County Representative
      • Minimum applications in March and September
    • EDGING
      • Edge all sidewalks, curbs, and planting beds
      • Minimum of 12 times per year
      • Maintain clean, defined edges
    • WEEDING
      • Remove weeds from all landscaped and mulched areas
      • Utilize hand removal and/or herbicides as needed
      • Apply pre-emergent and post-emergent treatments as required
      • Prevent damage to surrounding vegetation

       

    • HERBICIDE/PESTICIDE
      • Remove invasive and exotic species
      • Monitor and treat for insects and disease as needed
    • PRUNING
      • Perform selective hand pruning as needed to maintain plant health and shape
      • No shearing as the primary method
      • Maintain vines with a clear trunk up to 3 ft and max height of 8 ft
      • Cut back native grasses annually (early March or as needed)
    • MULCH
      • Maintain mulch at a 3-inch compressed depth
      • Reapply as needed (minimum once per year)
      • Do not place mulch against plant trunks
      • Use clean, approved mulch materials only

       

    • GENERAL MAINTENANCE REQUIREMENTS
      • Protect all hardscape features during maintenance
      • Maintain a clean and professional appearance at all times
      • Repair any damage caused by Contractor at no cost to the County
    • LITTER PICK-UP
      • Remove litter and debris from landscaped areas and medians during each visit
    • Additional Details
      • Monday through Friday during daylight hours unless otherwise approved
      • Lane closures are prohibited between 7:00 AM and 9:30 PM unless otherwise approved by the County Representative
      • All lanes must be reopened to normal traffic within 12 hours of an evacuation notice for a hurricane or other emergency event and shall remain open for the duration of the event as directed by the County Representative
    • Contractor required documentation: (upon award)

       

      • Liability Insurance naming Walton County
      • Proof of Workman’s Compensation Coverage

    Submission Requirements

    • Respondent Submittals (without Cost)

      Please Upload your response, including any and all required forms listed in the solicitation and the corresponding attachments.

      (Do not upload cost information in here)

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company. (required)
    • Lead Time (required)
    • Quote Validity (required)
    • Has your company done business with Walton County before? (required)

      If no, upon award we would need a copy of your company’s W-9 and ask you too complete an ACH form.

    • Please provide two references with contact information from customers you’ve done similar scope of work for: (required)
    • Pricing (required)
    • Procurement and/or Project Contact

      Select the information you would like display.

    Questions & Answers

    Q (No subject): Will you please provide a budget number for this project?

    A: There is no budget number for this project.


    Q (No subject): Will you please provide a previous bid tabulation for contractors to reference?

    A: The scope of work for this project is different from the previously awarded landscaping services and is not directly comparable. Additionally, the prior services were handled through a purchase order and not a formal solicitation, so there is no bid tabulation available.


    Q (No subject): Will you please provide a current contract for contractors to reference?

    A: There is no current contract available for reference, as the previously awarded services were issued by purchase order and not established under a formal contract.


    Q (No subject): Will you please confirm that 30 visits per year is the anticipated total based on the schedule provided on page 4 section 2.3?

    A: The anticipated visits per year will need to be weekly April-September and then monthly from October-March, we hope to get a PO issued for these services by next week with the anticipation of the job starting the last week of April. So it will be a total of 29 cuts all together.


    Q (No subject): Are contractors supposed to craft their own pricing form, since one is not provided in the bid documents? Similarly, there are no forms for contractors to fill out in the bid document. What, if any, forms should be input into line item 1: Respondent Submittals (without cost)?

    A: A pricing form was not included with this quote. Vendors may submit their pricing in a format of their choosing, as long as it clearly outlines the cost for the requested services. For Line Item 1: Respondent Submittals (without cost), contractors should include any supporting documentation such as qualifications, relevant experience, and references. There are no required forms to complete for this section.


    Key dates

    1. April 9, 2026Published
    2. April 16, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.