Active SLED Opportunity · TEXAS · CITY OF FRIENDSWOOD
AI Summary
City of Friendswood seeks proposals for Lift Station #27 Upgrades including demolition, wet well rehabilitation, pump installation, electrical and instrumentation improvements. The project budget is $984,000 with a 270-day contract period.
The Project includes:
• Demolition of wet well access hatches
• Provide, set-up, operate and maintain bypass pumping system including pumps,
piping, valves, connection to existing force main, and all appurtenances.
• Demolition of pumps, piping equipment and all appurtenances inside the wet well.
• Rehabilitation of wet well
• Demolition of all above grade piping, valves, and fittings.
• Removal of electrical panels, controls, and all appurtenances.
• Replacement of Automatic Transfer Switch (ATS).
• Addition of Pump Controller.
• Reconfiguration of existing duplex control panel.
• Installation of three submersible pumps including all appurtenances and
discharge piping in the wet well.
• Installation of all above-ground piping, valves, fittings and supports including tie-in
to existing force main.
• Construction of all instrumentation and electrical improvements as shown on the
drawings, for a complete working system including, but not limited to
instrumentation and control assemblies, service equipment, conductors, SCADA
capabilities, all related appurtenances, including studies, testing and coordination.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.