SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS

    Lift Station Elimination, Area F, Phase 2

    Issued by The City of Oklahoma City and Trusts
    cityRFQThe City of Oklahoma City and TrustsSol. 9116122060
    Closed
    STATUS
    Closed
    due Aug 5, 2026
    PUBLISHED
    Jul 8, 2026
    Posting date
    JURISDICTION
    The City
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    The City of Oklahoma City seeks bids for Lift Station Elimination, Area F, Phase 2 at Tinker Air Force Base. This wastewater construction project requires prequalification and includes mandatory pre-bid conference and onsite visit. Bids are due by July 29, 2026, with electronic submission.

    Opportunity details

    Solicitation No.
    9116122060
    Type / RFx
    RFQ
    Status
    Active
    Level
    city
    Published Date
    July 8, 2026
    Due Date
    August 5, 2026
    NAICS Code
    237110AI guide
    Agency
    The City of Oklahoma City and Trusts

    Description

    Prequalification Requirement is Wastewater Pipeline contractor "B". OCWUT TS-0008-2, Lift Station Elimination, Area F, Phase 2, Tinker Air Force Base **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Questions are submitted online**: Yes **Onsite Visit**: 07/20/2026 11:00 AM EDT **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Oklahoma City Water Utilities Trust **Reference Number**: 0000426748 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event: Prebid Conference | Date: 07/16/2026 03:00 PM EDT | Location: 420 W Main, 5th Floor, Conference Room B, Oklahoma City, Oklahoma 73102 | Mandatory: True Event: Onsite Visit | Date: 07/20/2026 11:00 AM EDT | Location: Tinker Air Force Base Visitor Center, S Air Depot Blvd, Oklahoma City, OK 73145 **Line Items**: | description | quantity | uom | |---|---|---| | Next 1-Base Bid Code Description UOM Qty Modification 613 DEFLECTION TEST (GRAVITY LINE) Linear Foot/Feet 2314 Quantity has been modified 614 PRE CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 2314 Quantity has been modified 614 POST CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 2314 Quantity has been modified 615 SEWER LEAKAGE TEST (GRAVITY LINE) Linear Foot/Feet 2314 Quantity has been modified 616 EXTRA DEPTH MANHOLE WALL (4-FOOT DIA) Vertical Feet 42 Quantity has been modified 633 8-INCH PVC (SDR-35) SANITARY SEWER PIPE BY OPEN CUT Linear Foot/Feet 2100 Quantity has been modified 635 BORE AND STEEL ENCASEMENT (INCL. 8-INCH CARRIER) Linear Foot/Feet 214 Quantity has been modified TAFB PAVEMENT CUT AND PERMANENT REPAIR (SIDEWALK) Square Yard 140 Quantity has been modified 633 4" PVC FORCEMAIN (SDR-14) BY OPEN CUT Linear Foot/Feet 10 Added 633 CONNECT TO EX. 4" FORCEMAIN Each 1 Added 02 00 40 REMOVE 4"X4" TEE Each 1 Added 02 00 40 REMOVE 4" CHECK VALVE Each 2 Added 633 4" PVC SANITARY SEWER LATERAL Lump-Sum 1 Added TAFB PAVEMENT CUT AND PERMANENT REPAIR (ROADWAY) (CONC) Square Yard 5 Added 15 PAVEMENT CUT AND PERMANENT REPAIR (BRICK) Square Yard 15 Added TAFB PAVEMENT CUT AND PERMANENT REPAIR (DRIVEWAY) (CONC) Square Yard 180 Added 00 99 40 LEAD ABATEMENT Lump-Sum 1 Added | 613.0 | Code Description UOM Qty Modification | | Code Description UOM Qty Modification | 613.0 | 613 DEFLECTION TEST (GRAVITY LINE) Linear Foot/Feet 2314 Quantity has been modified 614 PRE CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 2314 Quantity has been modified 614 POST CONSTRUCTION TELEVISION INSPECTION (CCTV) Linear Foot/Feet 2314 Quantity has been modified 615 SEWER LEAKAGE TEST (GRAVITY LINE) Linear Foot/Feet 2314 Quantity has been modified 616 EXTRA DEPTH MANHOLE WALL (4-FOOT DIA) Vertical Feet 42 Quantity has been modified 633 8-INCH PVC (SDR-35) SANITARY SEWER PIPE BY OPEN CUT Linear Foot/Feet 2100 Quantity has been modified 635 BORE AND STEEL ENCASEMENT (INCL. 8-INCH CARRIER) Linear Foot/Feet 214 Quantity has been modified TAFB PAVEMENT CUT AND PERMANENT REPAIR (SIDEWALK) Square Yard 140 Quantity has been modified 633 4" PVC FORCEMAIN (SDR-14) BY OPEN CUT Linear Foot/Feet 10 Added 633 CONNECT TO EX. 4" FORCEMAIN Each 1 Added 02 00 40 REMOVE 4"X4" TEE Each 1 Added 02 00 40 REMOVE 4" CHECK VALVE Each 2 Added 633 4" PVC SANITARY SEWER LATERAL Lump-Sum 1 Added TAFB PAVEMENT CUT AND PERMANENT REPAIR (ROADWAY) (CONC) Square Yard 5 Added 15 PAVEMENT CUT AND PERMANENT REPAIR (BRICK) Square Yard 15 Added TAFB PAVEMENT CUT AND PERMANENT REPAIR (DRIVEWAY) (CONC) Square Yard 180 Added 00 99 40 LEAD ABATEMENT Lump-Sum 1 Added | | 613 | | DEFLECTION TEST (GRAVITY LINE) | | DEFLECTION TEST (GRAVITY LINE) | 2314.0 | Linear Foot/Feet | | PRE CONSTRUCTION TELEVISION INSPECTION (CCTV) | 2314.0 | Linear Foot/Feet | | POST CONSTRUCTION TELEVISION INSPECTION (CCTV) | 2314.0 | Linear Foot/Feet | | SEWER LEAKAGE TEST (GRAVITY LINE) | 2314.0 | Linear Foot/Feet | | EXTRA DEPTH MANHOLE WALL (4-FOOT DIA) | 42.0 | Vertical Feet | | 8-INCH PVC (SDR-35) SANITARY SEWER PIPE BY OPEN CUT | 2100.0 | Linear Foot/Feet | | BORE AND STEEL ENCASEMENT (INCL. 8-INCH CARRIER) | 214.0 | Linear Foot/Feet | | PAVEMENT CUT AND PERMANENT REPAIR (SIDEWALK) | 140.0 | Square Yard | | 4" PVC FORCEMAIN (SDR-14) BY OPEN CUT | 10.0 | Linear Foot/Feet | | CONNECT TO EX. 4" FORCEMAIN | 1.0 | Each | | REMOVE 4"X4" TEE | 1.0 | Each | | REMOVE 4" CHECK VALVE | 2.0 | Each | | 4" PVC SANITARY SEWER LATERAL | 1.0 | Lump-Sum | | PAVEMENT CUT AND PERMANENT REPAIR (ROADWAY) (CONC) | 5.0 | Square Yard | | PAVEMENT CUT AND PERMANENT REPAIR (BRICK) | 15.0 | Square Yard | | PAVEMENT CUT AND PERMANENT REPAIR (DRIVEWAY) (CONC) | 180.0 | Square Yard | | LEAD ABATEMENT | 1.0 | Lump-Sum | **Questions and Answers**: | Question | Answer | |---|---| | Manhole Rings and Lids Note 18, sheet 2 states to use hinged manhole rings and lids. Please clarify if that is what the city wants to use. Arrow Right Answer: Yes as per the plans | Manhole Rings and Lids Note 18, sheet 2 states to use hinged manhole rings and lids. Please clarify if that is what the city wants to use. Arrow Right Answer: Yes as per the plans | | Manhole Coatings Note 20 states to use high performance epoxy but at 50 mils which isn't the standard. Please clarify if all manholes are to be high performance epoxy coated according to 616.A, note 5. Arrow Right Answer: Yes as per the plans | Manhole Coatings Note 20 states to use high performance epoxy but at 50 mils which isn't the standard. Please clarify if all manholes are to be high performance epoxy coated according to 616.A, note 5. Arrow Right Answer: Yes as per the plans | | Funding Source Please clarify if there are any federal funds tied to this job. Arrow Right Answer: No federal funds | Funding Source Please clarify if there are any federal funds tied to this job. Arrow Right Answer: No federal funds | | Wage Rates Are Davis Bacon Wage rates required on this project? Arrow Right Answer: Yes as per specifications | Wage Rates Are Davis Bacon Wage rates required on this project? Arrow Right Answer: Yes as per specifications | | Material Sourcing Are there American Iron and Steel (AIS) or Buy America, Build America (BABA) requirements for this project? Arrow Right Answer: No, it is not required | Material Sourcing Are there American Iron and Steel (AIS) or Buy America, Build America (BABA) requirements for this project? Arrow Right Answer: No, it is not required | | PRE-CONST. CCTV There is quantity for 2296 LF of Pre-CCTV and 2296 LF of Post-CCTV. Are we removing and replacing the entire 2296 LF or is this new installation, which would not have Pre-CCTV? Arrow Right Answer: This project is abandoning the existing sanitary sewer line. Pre-CCTV is to confirm all laterals will be reconnected. | PRE-CONST. CCTV There is quantity for 2296 LF of Pre-CCTV and 2296 LF of Post-CCTV. Are we removing and replacing the entire 2296 LF or is this new installation, which would not have Pre-CCTV? Arrow Right Answer: This project is abandoning the existing sanitary sewer line. Pre-CCTV is to confirm all laterals will be reconnected. | | Electrical Requirements Will the wiring from the old lift stations, to include the raceways and conduit, need to be removed to the panel for lift station demolition? Arrow Right Answer: Yes as per plans and notes | Electrical Requirements Will the wiring from the old lift stations, to include the raceways and conduit, need to be removed to the panel for lift station demolition? Arrow Right Answer: Yes as per plans and notes | | Tree Removal and Installation Please clarify bid items 27 and 28. Are we to spade, store and then replace the same trees, or are we to remove the trees and plant a new one? If so same species or something different. Arrow Right Answer: The tree identified on the plans is to be removed and replaced with the proposed trees in accordance to Specification Section 00 72 00 Attachment 12. The acceptable tree species will be posted in the addendum. | Tree Removal and Installation Please clarify bid items 27 and 28. Are we to spade, store and then replace the same trees, or are we to remove the trees and plant a new one? If so same species or something different. Arrow Right Answer: The tree identified on the plans is to be removed and replaced with the proposed trees in accordance to Specification Section 00 72 00 Attachment 12. The acceptable tree species will be posted in the addendum. | | Manhole Coatings Note 20 specifies a high performance epoxy coating but it also states to apply the coating at 50 mils. High performance coatings are applied at 125 mils. Please remove the 50 mil note. Arrow Right Answer: The answer will be published in an addendum | Manhole Coatings Note 20 specifies a high performance epoxy coating but it also states to apply the coating at 50 mils. High performance coatings are applied at 125 mils. Please remove the 50 mil note. Arrow Right Answer: The answer will be published in an addendum | | Lead Abatement Part 1.04 calls for fully removing existing paint and coatings from all surfaces of the structure to be repainted. Ours is a demolition project. Table #1 of the lab results shows 3 items in excess of the EPA limit; the entry door ,door jamb and the interior window seal. Is the intention to remove paint from these three areas or the entire structure prior to demolition? Arrow Right Answer: The answer will be published in an addendum | Lead Abatement Part 1.04 calls for fully removing existing paint and coatings from all surfaces of the structure to be repainted. Ours is a demolition project. Table #1 of the lab results shows 3 items in excess of the EPA limit; the entry door ,door jamb and the interior window seal. Is the intention to remove paint from these three areas or the entire structure prior to demolition? Arrow Right Answer: The answer will be published in an addendum | | Manhole coatings. The sewer pipe on this project is 8 inch diameter. Previously, on pipes of this diameter, the shop applied min 8 mils Tnemec 69 High Build Epoxiline has been called for. Will that apply for this project? Arrow Right Answer: The answer will be published in an addendum | Manhole coatings. The sewer pipe on this project is 8 inch diameter. Previously, on pipes of this diameter, the shop applied min 8 mils Tnemec 69 High Build Epoxiline has been called for. Will that apply for this project? Arrow Right Answer: The answer will be published in an addendum | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/27/2026 10:11 AM EDT | | **Communications**: - Communication No.1 - 07/16/2026 03:36 PM EDT - Communication Documents - Document: TW-0008-2 Pre-bid Attendance.pdf

    Key dates

    1. July 8, 2026Published
    2. August 5, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.